ML20235L845
| ML20235L845 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/30/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Deddens J GULF STATES UTILITIES CO. |
| Shared Package | |
| ML20235L848 | List: |
| References | |
| NUDOCS 8710050619 | |
| Download: ML20235L845 (2) | |
See also: IR 05000458/1987020
Text
- _-
_ _ _ _ _ _ _ _
_
- ______________ __ _-__ _______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ __
__
)
..
,
SEP 3 01987
In Reply Refer To:
Docket: 50-458/87-20
Gulf States Utilities
ATTN: Mr. James C. Deddens
SeniorVicePresident,(RBNG)
Nuclear' Licensing
P. O. Box.220
St. Francisville, LA 70775
,
,
Gentlemen:
This refers to the inspection conducted by Messrs. D. D. Chamberlain and
W. B. Jones of this office during the period August 1 through September 15,
1987, of activities authorized by NRC Operating License NPF-47 for River Bend
Station, and to the discussion of our findings with you and other members of
your staff at the conclusion of the inspection.
Areas examined during the inspection included, review of licensee action on
previous inspection findings, review of licensee action on an NRC Information
i
'
Notice, licensed operator requalification program, non-licensed staff training,
maintenance witnessing, safety system whikdown, surveillance test witnessing,
operational safety verification and preparation for refueling. Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations by the NRC
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
these violations, in writing, in accordance with the provisions of
Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
I
Federal Regulations. Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
One unresolved item is identified in paragraph 9 of the enclosed inspection
i
report.
We have also examined actions you have taken with regard to previously
identified inspection findings. The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
7
RI
m B/A
[<JEGagliardo
\\
WRBennett
P0audon
r fa/87
g/87
[/19
/87
87i0050619 870930
l
DR
ADOCK 050
4]B
_
--
_ _ _ - _ _ _ _ _ - _ _ _ _ -
.
.
!
Gulf States Utilities
-2-
l
Should you have any questions concerning this inspection, we will be pleased to
l
'
discuss them with you.
Sincerely,
Surfalttel r: m.; tuA
2
R. L HALL"
J. E. Gagliardo, Chief
i
Reactor Projects Branch
1
Enclosures.
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-458/87-20
cc w/ enclosures:
I
Gulf States' Utilities
ATTN:
Mr. J. E. Booker, Manager-
River Bend Oversight
P. O. Box 2951
Beaumont, Texas 77704
Louisiana State University,
,
Government Documents Department
{
Louisiana Radiation Control Program Director
J
bcc to DMB (IE01)
bcc distrib, by RIV:
- RPB
DRSP
- Resident Inspector
R. D. Martin, RA
- Section Chief (RP8/A)
- D. Weiss, RM/ALF
- MIS System
- RSB
- RSTS Operator
- Project Inspector
- R&SPB
- R. Hall
- RIV File
.
NRR Project Manager
R. Starostecki, NRR
- w/766
l
l
l
l
l
i
1
- - _ _ -