FEB 0 91989
"
Docket Nos. 50-424, 50-425
. License Nos. NPF-68, CPPR-109
,
Georgia Power Company
ATTN: Mr. W..G. Hairston, III
Seni_or Vice President -
Nuclear Operations
..P. 0.l Box 1295
Birmingham, AL 35201~
]
. Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-424/89-01 AND 50-425/89-01.
This refers to the Nuclear Regulatory Commission (NPC) inspection conducted by
A. L. Cunningham on January 17-19, 1989.
The inspection included a review of
.
- activities authorized for your' Vogtle facility.
At the conclusion of the
inspection, the findings were discussed with, those members of your staff
identified .in the enclosed inspection report.
' Areas examined. during the inspection are . identified in the report.. Within
these areas, the inspection consisted of selective examinations of procedures
.
and representative records, interviews with personnel
and observation of-
2
activities.in progress.
Within the ' scope of the: inspection, no violations or deviations were
identified.
1
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title.10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
j
Should you have any questions concerning this letter, please contact us.
4
Sincerely,
I
Thomas R. Decker, Acting Chief
.
Radiological Protection Branch
Division of Radiation Safety
!
4
and Safegumis
Enclosure:
(Seepage 2)
l
hh
'
4
a
au-
- - _
_ _ _ _ _ _
__ . _ _
-
i
_ __ _ __ - -
. . . . . .
.
-
.
Georgia Power Company
2
Enclosure:
NRC Inspection Report
cc w/ enc 1:
R. P. Mcdonald, Executive Vice
President, Nuclear Operations
P.,D. Rice, Vice President, Project
Director
- C. W. Hayes, Vogtle Quality
Assurance Manager
G. Bockhold, Jr. , General Manager,
-Nuclear Operations
J. P. Kane, Manager Licensing
and Engineering
J. A. Bailey, Project Licensing
Manager
B. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
D. Kirkland, III, Counsel,
Office of the Consumer's Utility
Council
D. Feig, Georgians Against
Nuclear Energy
State of Georgia
bec w/ enc 1:
E. Reis. 0GC
J. Hopkins, NRR
M. Sinkule, RII
DRS Technical Assistant
NRC Resident Inspector
Document Control Desk
W. D. Travers, NRR
J. Heard, FEMA RIV
l
l
RII
RII
RII
f/
C$
ACunningham
WRankin p4Sinkule
1/4/89
1/ /89
J/7 /89
_ _-_ ___-__