Discusses 870707 Telcon Between D Bauer & D Haverkamp Re Procedures Being Established to Provide Commonwealth of Ma Civil Defense Agency W/Info Per Certain Events of Interest to That Agency That May Occur at Plant
ML20235L558
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 07/10/1987
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 8707160738
Download: ML20235L558 (3)


Text

~

~f JUL 10 IlW I

Docket No. 50-271 Vermont Yankee Nuclear Power Corporation ATTN:

Mr. Warren P. Murphy Vice President and Manager of Operations RD 5, Box 169 Ferry Road Brattleboro, Vermont 05301 1

Gentlemen:

Subject:

Communication of Events of Interest with the Commonwealth of Massachusetts This refers to the telephone conversation on July 7, 1987 between Mr. D. Bauer of your staff and Mr. D. Haverkamp of this office concerning procedures being estab-lished to provide.the Massachusetts Civil Defense Agency (MCDA) information regard-

.ing certain events of interest to that agency that may occur at the Vermont Yankee i

Nuclear Power Station. Those communications procedures for " events of interest,"

i.e., those events which the Nuclear Regulatory Commission requires that licensees report in accordarae with 10 CFR 50.72, that we have' agreed to implement with MCDA, are described in the enclosed. letter dated June 18, 1987.

I understand that on June 25, 1987 a related event notification agreement was reached for the Vermont Yankee Nuclear Power Station, as described in a letter dated June 30, 1987 from Mr. A. Kadak,'Vice President, Yankee Atomic Electric.Com-pany to Mr. R. Boulay, Director, MCDA.

We consider that your procedures for noti-

)

fying MCDA of events of interest are fully consistent with our agreement to respond to MCDA inquiries regarding 10 CFR 50.~72 notifications.

At this time, we do not plan to require any special or supplemental telephone. notifications of those events to the.NRC Region I Office or to the NRC resident inspector, as existing NRC re-porting requirements and our internal communications procedures appear adequate.

However, for the sake of consistency of information, we request that when you make the facsimile transmission to the Commonwealth of Massachusetts, you would also transmit a copy of the notification via facsimile to the project section chief in the NRC Region I Office.

I Lastly, we note that you will be prepared to implement the provisions of your j

agreement with MCDA on July 15, 1987.

Although we have been prepared to implement i

the provisions of our agreement with MCDA since June 22, 1987, we will place our communication agreement in effect on July 15, 1987, consistent with your schedule.

1 By copy of this letter to Mr. Boulay, I am informing the Commonwealth of Massa-chusetts of this matter.

1 i

l 8707160738 870710 PDR ADOCK 05000271 h.g P

PDR 3

m

.,: c -

1 1

..,4 10 g

-Vermont Yankee Nuclear Power 2

Corporation If you have any questions in this regard,. please contact me at (215) 237-5229.

Sincerely, ori ina181gned 2.o 1111am F. Kane, irector Division of Reactor Projects DL-

Enclosure:

As Stated cc w/ enc 1:

l R. J. Boulay,_ Director, Massachusetts Civil Defense Agency A. C. Kadak, Vice President, YAEC R. W. Capstick, Licensing Engineer J. Gary Weigand, President and Chief Executive Officer J. P. Pelletier,. Plant Manager Donald Hunter, Vice President Cort Richardson, Vermont Public Interest Research Group, Inc.

Gerald Tarrant, Commissioner, Department of Public Service Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC) l NRC Resident Inspector l

State of New Hampshire l

State of Vermont I

k i

l i

\\

.j

.E

m Vermont Yankee Nuclear Power 3

JULyg9gg7 Corporation l

bcc w/ encl:

Region I Docket Room (with concurrences)

J. Taylor, DEDR0 H. Denton, GPA 1

T. Murley, NRR

)

S. Varga, NRR

(

B. Boger, NRR

]

V. Rooney, NRR W. Russell, RI J. Allan, RI W. Kane, RI i

S. Collins, RI M. Miller, RI T. Elsasser, RI D. Haverkamp, RI i

G. Matakas, RI M. McBride, SRI, Pilgrim i

H. Eichenholz, SRI, Yankee l

l l

\\

l l

l MD

/

RbA RIDJP R.

R RP RI: RP

DRP RA i

s 3

1)WY

['V s

Haverkamp/meo Elsasser Wegzigger C

'ns' Kane iller Alla Russell 7[f,

/f /py o\\\\o

,/tO 7 (

7/10/87 g

0FFICIAL RECORD COPY l

l l

1