ML20235L541

From kanterella
Jump to navigation Jump to search
Forwards Inservice Sys Pressure Test Program for First 10-Yr Interval
ML20235L541
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/13/1983
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20235L543 List:
References
NUDOCS 8902270563
Download: ML20235L541 (1)


Text

's) 0B 19 0 2 3 2 3 A s 7._83 0 8_18 0 01 3

\\

R00 Cheatnut Street Tower II August 18, 1981

,g U.S. Muelear Regulatory to' ensisalon

$2.V Region IT Attat M*. Jeans P. O'Reilly, Regional Administrator

- 101 Marietta Street, NW, Suite M00 Atlanta, Co wgic 30303

Dear Mr. O'Reilly:

In response to the April 14, 1980 letter from Otarles E. Marthy to N. O. Parris, enclosed la the in-service syntes pressure test prozess for Sequoyah beleer Plant units 1 and 2.

This progma : applies to the firsyt 10-year.inepootion interval and is based an the 1977 edition, Summer 19178 Adenda of Neotion It of the ASNIf Weiler ved Pressure Vessel Code, Revisions and/or requests for relief will be submitted pursuant to g

10 CFR 50.95afg)(5)(111).

N' 1

If 7no teve ar.7 questions, please get in touch with R. N. Shell at T.

F?S 858-2688.

~ 61 Yorv truir ycmare, T1Dem3SEE YA'. LEY AUTWORITY

- in o

L. M. Mills, Mhnager Nuclear Licensing O-Enclosure Mr. R1ohard C,, DnYoung, Dirooter (Unclosure) ott Office of Inspeetten and Smnereement U.S. holear Regulatory Coassiasian tqtten, D.C.

20595 HH3. JEW:LDS oo (Enclosure):

.AR!it fill 0._C3T2-C. s R. L. Lusokin,1101 URB-C (2)

J.,4 Anderann, 141550 MIM-K.

J. A. Raulston, W10C126 C-K H. N. culver, 249A HR5-X H. S. Sanger, Jr., P,11B33 C-K E. J. Ford, Sequovah-NRC F. A. Sterepannki, 220 40171-C H. J. Green, 1760 CST 2-C COORDINATED NUC PR/(H.10 nereo dated 8/4/89)

/

' }

AV p

$902270563 830813 e,DR O

ADOCK 05000327 N

PDC

__