ML20235L426

From kanterella
Jump to navigation Jump to search

Forwards Safety Evaluation Accepting Response to Generic Ltr 83-28,Item 2.1 (Part) 2, Vendor Interface for Reactor Trip Sys Components
ML20235L426
Person / Time
Site: Fort Calhoun 
Issue date: 02/15/1989
From: Milano P
Office of Nuclear Reactor Regulation
To: Morris K
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20235L429 List:
References
GL-83-28, TAC-52839, NUDOCS 8902270519
Download: ML20235L426 (3)


Text

{{#Wiki_filter:L lr.. }, C l February 15, 1989-p - Docket-No.'50-285 i Mr. Kenneth J. Morris Division Manager ' Nuclear Operations Omaha Public Power District 1623 Harney' Street Omaha, Nebraska 68102 :

Dear Mr. Morris:

SUBJECT:

VENDOR-INTERFACE FOR REACTOR TRIP SYSTEM COMPONENTS, GENERIC LETTER 83-28,-ITEM 2.1 (PART 2) (TAC N0. 52839) The Commission has completed its review of Item 2.1 (Part 2) of Generic Letter No. 83-28, Required Actions Based. on Generic' Implications of the Salem ATWS Events, based on the additional information provided in the submittal dated September 1, 1987. The. staff has determined, as documented in the enclosed Safety Evaluation, that your responses for this item are acceptable. We, therefore, consider Item 2.1 (Part 2) of Generic Letter 83-28 to be closed by this action. Additionally, with the previous closure of Part 1.as stated in our letter dated May 10, 1988, all actions with regards to. Item 2.1 for the Fort Calhoun Station are now closed. Sincerely, /s/ Patrick D. Milano, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

1 As stated-cc w/ enclosure: I See next page j DISTRIBUTION i (Docketg E11e d NRC PDR Local PDR PD4 Reading G. Holahan L. Rubenstein J. Calvo S. Newberry 0GC-Rockville P. Noonan P. Milano E. Jordan PD4 Plant File A. Bournia B. Grimes ACRS (10) I f0w D:PD4(M LA:PD4 i PM:PD4 PNoonan PMilano:sr JCalvo 02/fD/89 02/0/89 02//f/89 pol I.' l 2270519 390215 m p ADOCK 050002s5 PDC g

as nacu 4 c, UNITED STATES h,

,"v. ( ( 'g NUCLEAR REGULATORY CON. MISSION

., ' j WASHINGTON, D. C 20555 ^ / February 15, 1989 Docket ho. 50-285 Mr. Kenneth J. Morris Division Manager - Nuclear Operations Omaha Fublic Power District 1623 Harney Street Omaha, Nebrasta 68102

Dear Mr. Morris:

SUEJECT: VENDOR INTERFACE FOR REACT 0P, TRIP SYSTEM COMPONENTS, GENERIC LETTER 83-28 ITEM 2.1 (PART 2) (TAC NO. 52839) The Corn.issicr. has conpleted its review of item 2.1 (Part 2) of Generic Letter No. 83-28, Required Actions Based on Generic Implications of the Salem ATWS. Events, based on the additior,al information provided in the submittal dated September 1, 1987. The staff has determined, as documented in the enclosed Safety Evaluatiori, that your responses for this item are acceptable. We, therefore, consider Item 2.1 (Part 2) of Generic Letter 83-28 to be closed by this action. Additionally, with the previous closure of Part 1 as stated in our letter dated May 10, 1988, all actions with regards to Item 2.1 for the Fort Calhoun Statier, are now closed. Sincerely, M3, L-Patrick D. Milano, Project Manager Project Directorate - IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure: See next page

u -r., r g Mr.1Kenneth J. Morris Fort Calhoun Station'- .0maha.Public Power District-Unit No. 1 'CC: Harry H. Voigt, Esq. 'LeBoeuf,-Lamb,.Leiby.8 MacRae [ -- 1333 New Hampshire Avenue, NW ( Washington, D.C. -20036-Mr.- Jack Jensen, Chairman Washington County Board i.-- of' Supervisors-Blair, Nebraska 68008. Mr. Phillip'Harrell, Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 309 FortLCalhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nu~ clear Operations

Combustion Engineering, Inc.

.12300 Twinbrook Parkway, Suite 330 Rockville, MD _20852-zRegional Administrator, Region IV U.S. Nuclear Regulatory Commission Office of Executive Director .for Operations 611.Psyan Plaza Drive, Suite 1000-Arlington, Texas 76011 Harold Borchert, Director Division of Radiological Health c Department of Health 301 Centennial Hall, South P.O. Box 95007 Lincoln, Nebraska 68509 W. G. Gates, Manager Fort Calhoun Station i P. O. Box 399 Fort Calhoun, Nebraska 68023 l = _ _ _ _ _. _ _ - - _ _. -. -}}