Informs That Re Schedule for Completing App R Mods for Facility Reviewed.Proposals to Delay Installation of Emergency Lighting & Fire Water Pump Room Upgrade Acceptable.Revised List of Commitments Encl
ML20235K422
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 09/29/1987
From: Heitner K
Office of Nuclear Reactor Regulation
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
References
NUDOCS 8710050082
Download: ML20235K422 (4)


Text

_ _ _ - _ _ _ _ _ - _ _ _ _

a September 29, 1987 i

Docket No. 50-267 Mr. R. O. Williams, Jr.

)

Vice President, Nuclear Operations Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201-0840

Dear Mr. Williams:

SUBJECT:

IMPLEMENTATION SCHEDULE FOR 10 CFR 50.48 AND APPENDIX R FIRE PROTECTION MODIFICATIONS - FORT ST. VRAIN NUCLEAR GENERATING STATION We have reviewed your letter dated August 21, 1987 (P-87267) concerning your schedule for completing Appendix R modifications for the Fort St. Vrain Nuclear Generating Station.

We find your proposal to delay the installation of emergency lighting (Item 4.4.a) acceptable, based on the fact that interim compensatory measures are continued.

We also find your delay of the Fire Water Pump Room Upgrade (Item 4.10.k) acceptable because the reactor will be shutdown or at low power for most of this delay period.

As noted in our letter of April 6,1987, we consider your dates for completion of these items as schedule commitments.

Additionally, we have updated the list of commitments contained in our letter i

of April 6, 1987.

These commitments have been found by the staff to be l

important to safety.

Any changes to these commitments should be requested formally from this office.

Sincerely, ISl l

Kenneth L. Heitner, Project Manager i

g710050082 0 I

67 Project Directorate - IV i

ADOM DR Division of Reactor Projects - III, PDR F

IV, V and Special Projects Office of Nuclear Reactor Regulation 1

l Enclosure.

As st ted l

cc w >nclosure:

l See next page D TRIBUTION:

Eocket File NRC PDR Local PDR PD4 Reading F. Schroeder J. Calvo P. Noonan K. Heitner 0GC-Beth E. Jordan 4

J. Partlow ACRS (10)

PD4 Plant file DKubicki CMcCracken LTR NAME: {FSV87-151]

PD-4G/

PD-4 k PD-4((

CHEB CH B 4

i PNobn'an KHeitner JCalvo DKubicki CMcCracken l

l 09f)$/87 09/19/87 09/2-f/87 09/a9/87 09/ 9/87 1

)

l 4

i 1

)

Mr. R. O. Williams, Jr.

Public Service Company of Colorado Fort St. Vrain J

cc:

Mr. D. W. Warembourg, Manager-Albert J. Ha21e, Director

{

Nuclear Engineering Division Radiation Cottrol Division i

Public Service Company Department of Health j

l of Colorado 4210 East lith Avenue P. O. Box 840 Denver, Colorado 80220 Denver, Colorado 80201-0840 l

Mr. David Alberstein, 14/159A Mr. R. O. Williams, Jr., Acting Manager GA Technologies, Inc.

Nuclear Production Division l

Post Office Box 85608 Public Service Company of Colorado-l San Diego, California 92138 16805 Weld County Road 19-1/2 Platteville, Colorado 80651 i

Mr. H. L. Brey, Manager Nuclear Licensing and Fuel Division Mr. P. F. Toolinson, Manager Public Service Company of Colorado Quality Assurance Division P. O. Box 840 Public Service Company of Colorado Denver, Colorado 80201-0840 16805 Weld Ccunty' Road 19-1/2 Platteville, Colorado 80651 Senior Resident Inspector U.S. Nuclear Regulatory Commission Mr. R. F. Walker P. 0. Box 840 Public Service Company of Colorado Platteville, Colorado 80651 Post Office Box 840 Denver, Colorado 80201-0840 Kelley, Stansfield & 0'Donnell Public Service Company Building Commitment Control Program Room 900 Coordinator 550 15th Street Public Service Company of Colorado Denver, Colorado 80202 2420 W. 26th Ave. Suite 100-D Denver, Colorado 80211 Regional Administrator, Region IV U.S. Nuclear Regulatory Commission

$1 ri on a

Chairman, Board of County Commissioners of Weld County, Colorado Greeley, Colorado 80631 I

Regional Representative l

Radiation Programs I

l Environmental Protection Agency 1 Denver Place 999 18th Street, Suite 1300 Denver, Colorado 80202-2413 l

1 l

1 I

I

?

Revision 5 PUBLIC SERVICE COMPANY OF COLORADO COMMITMENTS RELATED TO THE OPERATION OF THE FORT ST. VRAIN NUCLEAR GENERATING STATION Item Commitment Description / Requirement Schedule (Reference) 1.

Provide status reports on the Nuclear Approximately Performance Enhancement Program on a every 6 months semi-annual basis.

(P-85217) 2.

Implement the Technical Specifications (TS)

Upgrade Program (P-85098):

a.

Provide a revised final draft proposal Complete of the Upgraded TS for NRC comment, (P-87063) b.

Submit a license amendment to 90 days after incorporate the Upgraded TS, (P-85243)

NRC comments on Item 2a c.

Implement the Upgraded TS.

(P-85243)

Approximately 4th refueling outage (License amendment will define) 3.

Improve control rod and reserve shutdown (See Item 2) reliability.

Incorporate the interim Technical Specifications in the Upgrade Program.

4.

Develop a plan to implement approved Annually modifications to control moisture ingress and submit annual reports on progress.

(P-85022 and P-85082) 5.

Evaluate control of moisture in CRDM purge 4th refueling system.

(P-85021) outage 6.

PCRV Tendon Surveillance Requirements:

'I a.

Incorporate the revised Tendon Surveillance (See Item 2) i Program into the Technical Specifications (P-85199),

t b.

Provide the results of the revised Approximately q

program to the NRC.

every 6 months 1

~ _ -

Revision 5 Page 2 7.

Provide an improved CRDM surveillance Six months program which includes consideration of after 82%

CRDM operational testing.

power authorization 8.

EDG Electrical Independence:

a.

Evaluate battery 1C as a 3rd dc Complete l

power source (P-87008),

b.

Update FSAR (Rev._5) on FSV electrical Complete l-system (P-87008).

9.

Fire Protection Modifications:

a.

Perform emergency lighting Complete by 1/15/88 l

modifications (P-87267),

b.

Perform modifications involving Startup follcwing i

4 ACM backfeed, permanent 4th refueling outage turbine water removal pump, and valve operability (P-87013).

1 1

1 r

-_------_---__.__.___._____________a