Text
_ _ -
_
_
.DC S
.
.,
,
SEP 2 51987
Docket No.
50-336
Northeast Nuclear Energy Company
ATTN: Mr. E. J. Mroczka
<
Senior Vice President - Nuclear
'
Engineering and Operations Group
P. O. Box 270
!
l
Hartford, Connecticut 06141-0270
Gentlemen:
Subject:
Inspection Report No. 50-336/87-16
!
This refers to the special team safety inspection conducted by NRC staff and
consultants and led by Mr. Ari Krasopoulos of this office on July 13 - 17, 1987
at Millstone Nuclear Power Station, Unit 2, of activities authorized by NRC
License No. OPR-65 and in particular, your conformance with sections of 10 CFR 50, Appendix R regarding fire protection and to the discussions of our findings
i
held by Mr. Krasopoulos and Mr. Scace at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter.
Within these areas, the
inspection consisted of selected examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that two of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
These violations have
been categorized by severity level in accordance with the " General Statement of
Policy and Procedure for NRC Enforcement Actions, "10 CFR Part 2, Appendix C
]
(Enforcement Policy). You are required to respond to this letter and in preparing
,
I
your response, you should follow the instructions in Appendix A.
The responses
directed by this letter and the accompanying Notice are not subject to the
,
clearance procedures of the Office of Management and Budget as required by the
!
Paper Work Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
l
Sincerely,
Originni signed By
Jacque P. Durr
William V. Johnston, Director
Division.of Reactor Safety
i
.
h
l
Enclosures:
1.
Appendix A Notice of Violation
1
2.
NRC Region I Inspection Report Number 50-336/87-16
i
j
g
OFFICIAL RECORD COPY
IR MILL 2 87-16 - 0001.0 0
l
8710020226 870925
09/15/87
ADOCK 05000336
G
PDR-
L-
_
- - - - _ - - - - - - - - - - -
---
_ - _ _ , . - - - _ _ _ -
_
,
_
.
1
1
Northeast Nuclear Energy Company
2
cc w/ enc 1:
l
W. D. Romberg, Vice President, Nuclear Operations
i
'
S. E. Scace, Station Superintendent
D. O. Nordquist, Manager of Quality Assurance
R. M. Kacich, Manager, Generation Facilities Licensing
i
Gerald Garfield, Esquire
Public Document Room (PDR)
local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
i
!
bec w/ encl:
l
Region I Docket Room (with concurrences)
1
Management Assistant, DRMA (w/o encl)
i
l
DRP Section Chief
M. McBride, RI, Pilgrim
P. Swetland, SRI, Haddam Neck
J. Shedlosky, SRI, Millstone 3
D. Jaf fe, LPM, NRR
R. Bores, DRSS
1.
Cf
C @Y
RI:DRS
RI:bS
RI': DRS
Krasopoulos/s1f
And son
Stro;nider
83 /87
8/,j/87
8/jy/8g
1
l
l
l
l
l
OFFICIAL RECORD COPY
IR MILL 2 87-16 - 0002.0.0
08/02/87
'
1
i
L_
J