Forwards Insp Rept 50-245/87-21 on 870811-0908 & Notice of Violation.Questions Recent Adequacy of Attention to Instrumentation & Controls Surveillance Due to 870826 Reactor Scram Caused by Technical Error
ML20235J526
Person / Time
Site: Millstone 
Issue date: 09/24/1987
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20235J529 List:
References
NUDOCS 8710020003
Download: ML20235J526 (2)


See also: IR 05000245/1987021

Text

_ _ _ _ _ _ _ _

_ _

. _ _ _ _ _ - _ _ _ _

.

L

&CA

c

. ..

SEP 2 41987

Docket'No. 50-245

g.

Northeast Nuclear Energy Company

M

c~

i

d @$$

"

ATTN: 'Mr.. Edward J. Mroczka-

Senior Vice President - Nuclear

Engineering and Operations Group

i.

P. O. Box 270

-

> 3

Hartford, Connecticut 06141-0270

p

.

Gentlemen:

,

-8

Subject: Routine Resident Inspection 50-245/87-21 (8/11/87 to 9/8/87)

This transmits the report of the above subject inspection of Millstone Unit 1

by Mr. G. Grant of this office. The inspection findings have been discussed

with Mr. S. Scace of your staff.

<

Your . commitment to quality . maintenance and plant. cleanliness was reflected in-

the- findings of an August 18 inspection by the Regional' Administrator. The

.

good state of general housekeeping and radiological cleanliness .during the

plant outage were particularly noteworthy.

In general, our inspection concluded that effective planning and management

were demonstrated throughout the 1987 refueling outage. . Flexibility without

compromisMg quality or safety, as well as pride and excellence, were apparent -

at all levels of the outage team.

,

It. appears, however, that the activities set forth in the Notice of Violation

enclosed as Appendix A did not fully comply with NRC requirements.

You-are

required to respond.to that Notice of Violation and, in so doing, should follow

the instructions in Appendix A.

We have also noted that Millstone 1 inspection report 87-05, Detail 8 noted

handwritten clarifications and corrections in Rod Block Monitor Calibration

Procedure SP410C, with a quarterly check performed instead of the monthly

check. That problem, the two instances cited in the enclosed violation, and

i

the reactor scram caused by technician error on August 26, 1987 (Detail 5.b of

the enclosed report), cause us to question the recent adequacy of attention to

detail to Instrumentation and Controls (I&C) surveillance. We recognize that

excellent performance has also been identified by our inspections and that the

noted problems may be individual anomalies.

Nonetheless, bectuse such events

may also indicate a trend toward surveillance performance inadequacy, please

specifically address this concern with your reply to the enclosed violation.

0FFICIAL RECORD COPY

IR MILL 1 87-21 - 0001.0.0

09/21/87

I

I

8710020003 870924

DR

ADOCK 050

5

g.g

i

_ ___

.

Northeast Nuclear Energy Company

2

.

Thank you for your cooperation.

Sincerely,

&cgwO N

f u ;tl.S M ~

James T. Wiggins, Chief

Projects Branch No. 3

Division of Reactor Projects

Enclosures:

1.

Appendix A, Notice of Violation

2.

NRC Region I Report 50-245/87-21

cc w/encls:

W. D. Romberg, Vice President, Nuclear Operations

S. Scace, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/encls:

,

Region I Docket Room (with concurrences)

l

Management Assistant, DRMA (w/o encis)

DRP Section Chief

T. Shediosky, SRI, Haddam Neck

'

B. Raymond, SRI, Millstone 3

M. Boyle, LPM, NRR

i

R. Bores, DRSS

l

l

,

0

l

RI:DRPb

.

'

RI:DRP

McCabe/mjd

W+ggtns 0466

9/N87

9/43/87

i

1

1

0FFICIAL RECORD COPY

IR MILL 1 87-21 - 0002.0.0