MONTHYEARML20127N6211985-06-25025 June 1985 Submits Requested Info for Further Definition & Rev of Util Position Re Illumination Levels at Plant,Including Definition of Hazards Used for Design of Lighting Sys. Proposes Delay of 850627 Appeal Meeting Project stage: Request ML20138R2431985-12-20020 December 1985 Advises That FSAR Table 15.0-6 Will Be Revised to Refer to Steam Generator High Level Trip Function as Nonrequired Actuation Function,Per 851122 Request.Rev Will Be Incorporated in Amend 11 to FSAR Project stage: Other ML20204J7471986-07-16016 July 1986 Responds to NRC Re Violations Noted in Insp Repts 50-366/86-08 & 50-321/86-08.Corrective Actions:Personnel Counseled on Importance of Generating Deficiency Repts When Applicable Per Mgt Bulletin MM-MGR-002-0386 Project stage: Other ML20212H3931987-01-15015 January 1987 Forwards Rev 1 to Westinghouse Rept, Beaver Valley Unit 2 Failure of Feedwater Control Channel Used for Protection. Time Span for Operator Action Remains Sufficient & Results for Overfill Events Acceptable,Per Westinghouse Analyses Project stage: Other ML20212E6501987-02-19019 February 1987 Forwards Request for Addl Info Re Confirmatory Issue 49, Tracking Remaining Backfit 4 Items Concerning Steam Generator Control & Protection,Per 850509 Meeting & Recent Correspondence.Prompt Response Requested Project stage: RAI ML20212E6321987-02-20020 February 1987 Forwards Evaluation Documenting Background,Current Status & Info Needed to Resolve Confirmatory Issue 49 (Backfit Issue 4) Re Steam Generator Level Control & Protection,Per 850509 Meeting & Recent Correspondence.Prompt Response Requested Project stage: Meeting ML20207Q9081987-03-0404 March 1987 Requests Schedular Exemption to 10CFR50.55a(h) to Allow Mod to Three Steam Generator Level Control Circuits to Incorporate median-select Function.Mod Requested to Resolve NRC Concerns & Close Listed Confirmatory Item in Sser 2 Project stage: Other 1987-01-15
[Table View] |
Text
)
4 YVL
'Al5 M
2NRC-7-171 Beaver Vahey No. 2 Unit Project Organization Telecopy 4 6
Ext.160
, ox$2Y July 6, 1987
.{
Shippingport. PA 15077 United States Nuclear Regulatory Commission ATTN:
Document Control Desk l
Washington, DC 20555
SUBJECT:
Beaver Valley Powcr Station Unit No. 2 Docket No. 50-412 j
Schedular Exemption to 10CFR50.55a(h) 7 Steam Generator Level Median Selector Gentlemen:
l Installation and calibration of the steam generator high level median selector at BVPS-2 has been completed.
Since the need for a schedular exemption no longer exists, it may be withdrawn from the BVPS-2 operating license.
l DUQUESNE LIGHT COMPANY 1
Vd. V. Carey Senior Vice President GLB/ijr NR/GLB/SCHED AR/NAR cc:
Mr. P. Tam, Project Manager Mr. J. Beall, NRC Sr. Resident Inspector Mr. L. Prividy, NRC Resident Inspector INP0 Records Center I 4