Forwards Insp Rept 50-213/87-21 on 870715-0825 & Notice of Violation
ML20235H421
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 09/11/1987
From: Elsasser T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20235H423 List:
References
NUDOCS 8710010047
Download: ML20235H421 (2)


See also: IR 05000213/1987021

Text

.

A

,

SEP 111987

Docket / License: 50-213/DPR-61 $

M

Connecticut Yankee Atomic Power Company q) Cm

ATTN: Mr. E. J. Mroczka w jf3

Senior Vice President - Nuclear O o

Engineering and Operations

P. O. Box 270

p $ m

Hartford, Connecticut 06101 D '

o  ;

Gentlemen: #

l

l

j

Subject: Resident Inspection 50-213/87-21 (July 15 - August 25, 1987)

This transmits the findings of the above subject inspection of the Haddam Neck  !

I Plant. These findings have been discussed with Mr. D. Miller of your staff.

The inspection identified a violation for failing to report a loss of spent

fuel pool cooling while the full core was off-loaded to the spent fuel pool.

Inasmuch as appropriate corrective actions have been taken in this case, no t

reply to this violation is necessary.

The enclosed report (Detail 6.3) addresses control room annunciator inoper-

ability for non-safety-related balance of plant equipment. Site management 4

,

took vigorous and appropriate action after our inspector questioned the timing

l of operator recognition of this condition. Our subsequent review concluded

that this was an isolated and non-representative instance of operator inatten-

tion. We do, nonetheless, wish to re-emphasize to you the importance of

vigilant operator attention to plant conditions.

The enclosed report (Details 6.8.2 and 6.9) also addresses unauthorized

activities by contractor personnel. We reviewed your immediate corrective

actions and found them adequate. Although station personnel made timely

discovery of these events, we are concerned that contractor personnel did not

comply with administrative requirements and failed to follow work orders.

Please reply to this matter, within 30 days of receipt of this letter, identi-

fying your corrective actions to prevent recurrence during future outages.

Your cooperation with us is appreciated.

Sincerely,

pW O "

B710010047 870911 Thomas C. Elsasser, Acting Chief

PDR ADOCK 05000213 Projects Branch No. 3

G PDR Division of Reactor Projects y

0FFICIAL RECORD COPY IR HN 87-21 - 0001.0.0

09/11/87

0

1

\

__

.

..

Connecticut Yankee Atomic 2

Power Company

Enclosures:

1. Appendix A, Notice of Violation

2. NRC Region I Report 50-213/87-21

cc w/encis:

W. D. Romberg, Vice President, Nuclear Operations

D. B. Miller, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

Public Document Room (PDR)

Local Public Document Room (LDRP)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/encis:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

DRP Section Chief

W. Raymond, SRI., Millstone Site

F. Akstulewicz, LPM, NRR I

R. Bores, DRSS

C. Anderson, DRS

M. Shanbaky, DRSS

S. Kucharski, DRP

H. Gregg, DRS

R. Summers, DRP j

!

g g # '

RI:DRP k b RI:DRh RI:DRP RI.

Asars/ba Shediosky McCabe Elsasser

9/h/87 t(n slo /g

0FFICIAL RECORD COPY IR HN 87-21 - 0002.0.0

l 11/29/80

l

_ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _

,