A
,
SEP 111987
Docket / License:
50-213/DPR-61
$
M
C
Connecticut Yankee Atomic Power Company
q) m
jf3
ATTN:
Mr. E. J. Mroczka
w
Senior Vice President - Nuclear
O o
Engineering and Operations
p $
P. O. Box 270
m
Hartford, Connecticut
06101
D
'
o
l
Gentlemen:
l
j
Subject:
Resident Inspection 50-213/87-21 (July 15 - August 25, 1987)
This transmits the findings of the above subject inspection of the Haddam Neck
!
I
Plant. These findings have been discussed with Mr. D. Miller of your staff.
The inspection identified a violation for failing to report a loss of spent
fuel pool cooling while the full core was off-loaded to the spent fuel pool.
Inasmuch as appropriate corrective actions have been taken in this case, no
t
reply to this violation is necessary.
The enclosed report (Detail 6.3) addresses control room annunciator inoper-
ability for non-safety-related balance of plant equipment.
Site management
4
took vigorous and appropriate action after our inspector questioned the timing
,
l
of operator recognition of this condition.
Our subsequent review concluded
that this was an isolated and non-representative instance of operator inatten-
tion. We do, nonetheless, wish to re-emphasize to you the importance of
vigilant operator attention to plant conditions.
The enclosed report (Details 6.8.2 and 6.9) also addresses unauthorized
activities by contractor personnel. We reviewed your immediate corrective
actions and found them adequate. Although station personnel made timely
discovery of these events, we are concerned that contractor personnel did not
comply with administrative requirements and failed to follow work orders.
Please reply to this matter, within 30 days of receipt of this letter, identi-
fying your corrective actions to prevent recurrence during future outages.
Your cooperation with us is appreciated.
Sincerely,
O
"
pW
B710010047 870911
Thomas C. Elsasser, Acting Chief
ADOCK 05000213
Projects Branch No. 3
G
Division of Reactor Projects
y
0FFICIAL RECORD COPY
IR HN 87-21 - 0001.0.0
0
09/11/87
\\
1
__
.
..
Connecticut Yankee Atomic
2
Power Company
Enclosures:
1.
Appendix A, Notice of Violation
2.
NRC Region I Report 50-213/87-21
cc w/encis:
W. D. Romberg, Vice President, Nuclear Operations
D. B. Miller, Station Superintendent
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LDRP)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/encis:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encis)
DRP Section Chief
W. Raymond, SRI., Millstone Site
F. Akstulewicz, LPM, NRR
I
R. Bores, DRSS
C. Anderson, DRS
M. Shanbaky, DRSS
S. Kucharski, DRP
H. Gregg, DRS
R. Summers, DRP
j
!
- '
g
g
RI:DRP k b
RI:DRh
RI:DRP
RI.
Asars/ba
Shediosky
McCabe
Elsasser
9/h/87
t(n
slo
/g
0FFICIAL RECORD COPY
IR HN 87-21 - 0002.0.0
l
11/29/80
l
_ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ -
_
_
_ - _ _
_
,