ML20235G745
| ML20235G745 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 09/18/1987 |
| From: | Knighton G Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20235G747 | List: |
| References | |
| TAC-60525, TAC-60526, NUDOCS 8709300196 | |
| Download: ML20235G745 (6) | |
Text
'
/
o,,
UNITED STATES 8'
NUCLEAR REGULATORY COMMISSION o
h WASHINGTON, D. C. 20555
\\...../
PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON NUCLEAR POWER PLANT, UNIT 1 DOCKET NO. 50-275 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 21 License No. DPR 80 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Pacific Gas & Electric Company (thelicensee)datedNovember 25, 1985 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety cf the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; 0.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
07093%h $
h PDR P
g 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-80 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.
21, are hereby incorporated in the license.
L Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment becomes effective at the date of its issuence.
FOR THE NUCLEAR REGULATORY COMMISSION CA& m.%
1 o
d 1' George W. Knighton, Director 3
Project Directorate V Division of Reactor Projects - III, IV, Y and Special Projects
Attachment:
Changes to the Technical Specification; Date of Issuance:
September 18, 1987 I
>3 8t G
./
UNITED STATES
. j' g
NUCLEAR REGULATORY COMMISSION
. r, WASMNGTON, D. C. 20555
%..+ f j
l I
i j
i l
PACIFIC GAS AND ELECTRIC COMPANY f
DIABLO CANYON NUCLEAR POWER PLANT, UNIT 2 DOCKET NO. 50-323 l
AMENDMENT TO FACILITY OPERATING LICENSE J
mendment No. 20
)
License No. DPR-82 i
i 1.
The Nuclear Regulatory Commission (the Commission) has found that:
)
s A.
The application for amendment by Pacific Gas & Electric Company
)
(thelicensee)datedNovember 25, 1985 complies with the standards i
and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be 4
conducted in compliance with the Commission's regulations;
)
i D.
The issuance of this amendment will not be inimical to the common
{
defense and security or to the health and safety of the public; i
and
)
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements l
have been satisfied.
f i
I
s.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-82 is hereby amended to read as follows:
(2) Technical Specifications 1
The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.
20, are hereby incorporated in the license.
Pacific Gas & Electric Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan, except where otherwise stated in specific license conditions.
3.
This license amendment becomes effective at the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION k.
It4) p George W. Knighton, Director
- L Project Directorate V Division of Reactor Projects - III, IV, Y and Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance: September 18, 1987
r-September 18, 1987:
e,
['
h a
ATTACHMENT TO LICENSE AMENDMENT NOS. 21 AND 20 FACILITY OPERATING LICENSE N05. DPR-80 AND DPR-82
_ DOCKET NOS. 50-275 AND 50-323 Insert the following page into the Appendix "A" Technical Specifications.
l The page is identified by Amendment number and contains a vertical line indicating the new specification.
Insert 6-15a I
1 i
l 1
4 i
ADMINISTRATIVE CONTROLS PROCEDURES AND PROGRAMS (Continued) f.
Containment Polar and Turbine Building Cranes A program which will ensure that:
- 1) the position of the contain-ment polar cranes precludes jet impingement from a postulated pipe rupture; and 2) the operation of the turbine building cranes is consistent with the restrictions associated with the current Hosgri seismic analysis of the turbine building.
This program shall include the following:
1)
Training of personnel, and j
2)
Procedures for the containment polar and turbine building cranes operation.
4
{
4
{
l I.
I l
l t
4 j
i DIABLO CANYON - UNITS 1 & 2 6-15a Amendment Nos. 21 and 20
- _ _ _ _