ML20235G119

From kanterella
Jump to navigation Jump to search
Rev 1 to Monthly Operating Repts for May 1987
ML20235G119
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/31/1987
From: Behnke C
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20235G063 List:
References
NUDOCS 8709290446
Download: ML20235G119 (2)


Text

- _ _ _. __-. _ _ _

+

l

-coc*************************************************************************

UNIT 1 OPERATING DATA REPORT coo *************************************************************************

Docket No. 50-317 September 14, 1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS

?

~~~~~~~~~~~~~~~~

1. UNIT NAME Calvert Cliffs Unit 1
2. REPORTING PERIOD MAY 1987 (Rev 1)
3. LICENSED THERMAL POWER (MWT) 2700
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825 8.

CHANGE IN CAPACITY RATINGS none

9. POWER LEVEL TO WHICH RESTRICTED n/a
10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 744 3,623 105,756
12. NUMBER OF HOURS REACTOR WAS CRITICAL 118.9 2046.2 81,817.9
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 99.9 1739.6 79,955.5
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
16. GROSS THERMAL ENERGY GENERATED (MWH) 245,676 4,478,390 200,008,785
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 77,963 1,513,042 66,203,035
18. NET ELECTRICAL ENERGY GENERATED (MWH) 74,377 1,446,524_ 63,195 734 t
19. UNIT SERVICE FACTOR 13.4 48.0 75.6
20. UNIT AVAILABILITY FACTOR 13.4 48.0 75.6
21. UNIT CAPACITY FACTOR (USING MDC NET) 12.1 48.4 72.6
22. UNIT CAPACITY FACTOR (USING DER NET) 11.8 47.2_

70.7

23. UNIT FORCED OUTAGE RATE 86.6 47.7 10.1 l
24. SHUTDOWNS SCHEDULID OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

i None l

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

n/a Note: Line 21 " Cumulative" factor uses a weighted average.

8709290446 870922 PDR ADOCK 05000317 R

PDR

l-coe*************************************************************************

UNIT 2 OPERATING DATA REPORT

.ece*************************************************************************

Docket No. 50-318 September 16, 1987 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS

~~~~~~~~~~~~

1. UNIT NAME Calvert Cliffs Unit 2 2L. REPORTING PERIOD MAY 1987 (Rev 1) 3.

LICENSED THERMAL POWER (MWT) 2700

4. NAMEPLATE RATING (GROSS MWe) 918 5.

DESIGN ELECTRICAL RATING.(NET MWe) 845

6. MAXIMUM DEPENDABLE CAP'Y"(GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAP'Y (NET KWe) 825
8. CHANGE IN CAPACITY RATINGS none
9. POWER LEVEL TO WHICH RESTRICTED n/a
10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
11. HOURS IN REPORTING PERIOD 744 3,623 89,111
12. NUMBER OF HOURS REACTOR WAS CRITICAL 0.0 1,733.2 73,619.2 j
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6 J
14. HOURS GENERATOR ON LINE 0.0 1,727.3 72,547.3

'15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 i

16. GROSS THERMAL ENERGY GENERATED (MWH) 0 4,443,141 182,759,996

{

17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 0 1,500,438 60,337,950 J
18. NET ELECTRICAL ENERGY GENERATED (MWH) 0 1,437,438 57,596,060 19.. UNIT SERVICE FACTOR 0.0 47.7 81.4
20. UNIT AVAILABILITY FACTOR 0.0 47.7 81.4
21. UNIT CAPACITY FACTOR (USING MDC NET) 0.0 48.1 78.3
22. UNIT CAPACITY FACTOR (USING DER NET) 0.0 47.0 76.5
23. UNIT FORCED OUTAGE RATE 0.0 1.4 5.8
24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

{

None i

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:

June 1, 1987 Note: Line 21 " Cumulative" factor no longer uses a weighted average.

. _. - _ _ _. _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _. _ _ _. _ _ _ _. _. _ _ _ _ _ _. _. _ _ _ _ _ _. _ _ _.. _ _ _ _ _ _ _ _. _ _ _._.