Informs of Denial of Request for Exemption from Annual Reporting Requirements of 10CFR50.54(a)(3) & 10CFR50.71(a) 10CFR50.71(a)(4).QA Program Update & FSAR Rev for CY87 Must Be Submitted by 870702 to Justify Exemption Request
ML20235E636
Person / Time
Site: Calvert Cliffs  
Issue date: 07/01/1987
From: Capra R
Office of Nuclear Reactor Regulation
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 8707130034
Download: ML20235E636 (2)


Text

',

July 1 1987 0

Docket Nos. 50-317 DISTRIBUTION l

and 50-318 M Docket-Filet B. Boger NRCPDR C. Vogan Local POR S. McNeil PDI-1 Rdg.

0GC T. Murley/J. Sniezek E. Jordan F. Miraglia J. Partlow Mr. J. A. Tiernan C. Rossi T. Barnhart(6)

Vice President-Nuclear Energy S. Varga ACRS(10) l Baltimore Gas and Electric Company GPA/PA ARM /LRMB P. O. Box 1475 L. Tripp l

Baltimore, Maryland 21203 i

Dear Mr. Tiernan:

J l

l

SUBJECT:

DENIAL OF REQUEST FOR EXEMPTION FROM ANNUAL REPORTING REQUIREMENTS 1

)

0F 10 CFR 50.54(a)(3) and 10 CFR 50.71(e)(4) l In your letter of June 11, 1987, you requested a schedular exemption from the 10 CFR 50.54(a)(3) and 10 CFR 50.71(e)(4) requirements for filing the annual quality assurance program update and the Final Safety Analysis report revision for calendar year 1987.

To remain in compliance with these provisions, these reports were required to be filed with the NRC by July 2, 1987.

Your proposed exemption requested that this reporting deadline be extended to September 2, 1987.

The circumstances presented in your June 11, 1987 request do not satisfy the requirements for special circumstances needed to justify an exemption as required by 10 CFR 50.12, " Specific Exemptions." Consequently, your request for exemption is hereby denied.

Failure to submit these reports to the NRC by July 2, 1987 constitutes a non-compliance with the requirements of 10 CFR 50.54(a)(3) and 10 CFR 50.71(e)(4).

BG&E will be considered to be in non-compliance until the sub-mission of reports that adequately meet the regulatory requirements.

Sincerely, Robert A. Capra, Acting Director C) Project Directorate I-1

/ Division of Reactor Projects, I/II

)[)W ;

cc:

See next page hw" (3>f y p-e,zb PDI-1 g SMcNeil,fr/m PDI-1 OGC OE PDI-1 JScinto JLieberman RCapra CVogan 4/ \\ /87

'7 / / /87

/ / 8

~7 / l / 87 7/ / /87

%O71Nb b 7

P

__a

. _ = _

s Mr. J. A. Tiernan Baltimore Gas & Electric Company Calvert Cliffs. Nuclear Power Plant 1

CC:

Mr. John M. Gott, President Regional Administrator, Region I Calvert County Board of U.S. Nuclear Regulatory Commission Commissioners Office of Executive Director Prince Frederick, Maryland 20768

. for Operations-631 Park Avenue D. A. Brune, Esq.

King of Prussia, Pennsylvania 19406 General Counsel Baltimore Gas and Electric Company P. O. Box 1475 Baltimore, Maryland 21203 Jay E. Silberg, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, NW Washington, DC 20036 Mr. M. E. Bowman, General Supervisor Technical Services Engineering Calvert Cliffs Nuclear Power Plant MD Rts 2 & 4, P. O. Box 1535 Lusby, Maryland 20657-0073 Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box 437 i

Lusby, Maryland 20657-0073 Bechtel Power Corporation ATTN: Mr. D. E. Stewart Calvert Cliffs Project Engineer 15740 Shady Grove Road i

Gaithersburg, Maryland 20760 Combustion Engineering, Inc.

ATTN: Mr. W. R. Horlacher, III Project Manager P. O. Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Department of Natural Resources Energy Administration, Power Plant Siting Program ATTN: Mr. T. Magette Tawes State Office Building Annapolis, Maryland 21204