Text
. _ _ _ _ _ _ _ _ _ _ _ _ _ -
28cg\\
UNITED STATES j
3
.y
- e/ i g NUCLEAR REGULATORY COMMISSION l
y C
j WASHING TON, D. C. 20555 3-)
- e..e 1
l SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO THE INSERVICE TESTING PROGRAM AND REQUESTS FOR RELIEF LOUISIANA POWER AND, LIGHT COMPANY WATERF0PD STEAM ELECTRIC STATION, UNIT 3 l
l DOCKET N0.:
50-382 INTRODUCTION The Code of Federal Regulations,10 CFR 50.55a(g), requires that inservice testine l
(IST) of ASME Code Class 1, 2, and 3 pumps and valves be performed in accordance l
with Section XI of the ASME Boiler and pressure Vessel Code and applicable addenda, except where specific written relief has been requested by the licensee and granted by the Commission pursuant to 10 CFR 50.55a(a)(3)(i), (a)(3)(ii), or (g)(6)(1).
In requesting relief, the licensee must demonstrate that (1) the proposed alternatives
{
provide an acceptable level of quality and safety, (2) compliance would result in hardship or unusual difficulties without a compensating increase in the level of
{
quality and safety, or (3) conformance with certain requirements of the applicable Code edition and addenda is impractical for its facility.
The Regulation, 10 CFR 50.55a(a)(3)(i), (e)(3)(ii), cnd (g)(6)(1), authorizes NRC to grant relief from these requirements upon mahirig the necessary I
findings. The NRC staff's findings with respect to granting or nct granting i
the relief requested as part of the licensee's IST Program are contained in the Sefety Evaluation (SE) issued on the licensee's program.
The IST program addressed in this report is based on the requirements of Section XI of the ASME Code, 1980 Edition through the Winter of 1981 Addenda.
l It covers the first ten-year inspection interval from September 24, 1985 to September 24, 1995.
The licensee's original program is described ir a letter dated September 13, 1982. Additional information and revisions were submitted in letters dated September 5,1984, January 11, 1985, October 15, 1987, and l
April 4, 1988.
EVALUATION l
l The IST program and the requests for relief from the requirements of Section XI have been reviewed by the staff with the assistance cf its contractor, EG8G, Idaho,Inc.(EG8G).
In addition, EG&G and staff members cet with licensee i
representatives on February 24 and 25,1982 in a working session to discuss l
questions resulting from the review.
The Technical Evaluation Report (TER) provided as Attachment 1 is EG8G's evaluation of the licensee's inservice testing program and relief requests.
The staff has reviewed the TER and cuncurs with the evaluations and conclusions contained in the TER. A hummary I
of the pump and valve relief request deter
- atient is presented in Table 1.
l l
Spc2.13o454 97oa$s2.
l52 Mock. ososo ene.
' t
.The granting of relief is based upon the fulfillment of any commitments made
.by the licensee in its basis for each relief request and the alternative proposed testing.
One relief request was partially / conditionally granted (TER section 2.2.2).
The licensee should refer to the specific TER section for a detailed discussion of this case.
In addition, Appendix D lists oth r IST program anomalies which were identified during our review.
The licensee should resolve all the items listed in Appendix D in accordance 3
with the staff positions.
Required program changes should be made within 90 days of receipt of this SE.
CONCLUSION ased ora the review of the licensee's IST program and relief requests, the staff concludes that the IST program as evaluated and modified by this SER will rrovide reasonable assurance of the operational readiness of the pumps and valves covered by the IST program to perform their safety related functions. The staff has determined that granting relief, pursuant to 10 CFR 50.55a (a)(3)(i), (e)(3(ii), or (g)(6)(1), is authorized by law and will not endanger life or. property, or the common defense and security and is otherwise j
in the public interest.
In making this determination the staff has considered l
the alternate testing being implemented, resulting hardships without a compen-sating increase in safety, or the impracticality of performing the required testing consideririg the burden if the requirements were imposed.
The last
{
column of Table 1 identifies the regulation under which the reouested relief j
is granted.
During the review of the licensee's inservice testing program, the staff has
)
identified certain misinterpretations or omissions of Code requirements. These
'tems are summarized in the TER Appendix C.
The IST program for Waterford 3,
)
hrough submittals dated September 13, 1982, September 5,1984, January 11, 1985, October 15, 1987, and April 4, 1988. are acceptable for implementation 1
provided that the items noted above are corrected promptly.
Relief requests contained in any subsequent revisions may not be implemented without prior approval by NRC.
~
Dated: February 7,1989 Principal Contributor:
H. Shaw
Attachment:
TER l
i Page No.
1 10/06/88
~
WATERFORD STEAM ELECTRIC STATION, UNIT 3 I
SER TABLE 1
SUMMARY
.OF RELIEF REQUESTS RELIEF TER SECTION XI EQUIPMENT ALTERNATE ACTION i
REQUEST SECTION REQUIREMENT IDENTIFICATION METHOD OF BY I
NUMBER
& SJBJECT TESTING USNRC Pump 2.2.1 IWP-3100, Charging pumps Positive Relief 2.1.1 Measure pump A, 8, and C.
displacement pumps, Granted inlet only discharge pressure.
pressure will be measured.
Pump 2.2.2 IWP.4120, Charging Measure pump flow Relief 2.1.2 Range of flowrate using installed Granted instruments instruments.
system gauge that has an accuracy of 3.4 times the i
reference.
I Pump 2.1.1 IWP-3100, Containment Use fixed resistance Partial /
2.1.3 Adjusting Spray, HPSI, recire flowpaths Conditional pump LPSI, EFW, and measure pump Relief discharge and Boric discharge pressure Granted pressure or Acid.
but not flow.
flow to the reference value.
Valve 3.1.1.1 IWV-3417, Solenoid Measure valve stroke Conditional 3.1.1 Corrective valves in the time to the nearest Relief action for IST program.
second, acceptance Granted valves that based on actual stroke in stroke time rather less than 2 than the 50%
- seconds, criteria.
Valve 3.1.2.1 IWV-3417, All valves in Valves failing tests Relief 3.1.3 Corrective the IST at CSD will be Granted action for program.
returned to valves tested operability as at cold defined by Tech shutdown.
Specs.
Valve 3.1.2.2 IWV-3417, All power Valves test 6d at CSD Relief 3.1.4 Corrective operated that fail to the Denied action for vaives in the alert level will be valves tested IST program.
tested at each CSD at cold not to exceed 1 1
- shutdown, month.
1 lL
Page No.
2 10/06/88 WATERFORD STEAM ELECTRIC STATION, UNIT 3 SER TABLE 1
SUMMARY
OF RELIEF REQUESTS RELIEF TER SECTION XI EQUIPMENT ALTERNATE ACTION l
1 REQUEST SECTION REQUIREMENT IDENTIFICATION METHOD OF BY i
NUMBER
& SUBJECT TESTING USNRC Valve 3.1.2.3 IWV-3417, Solenoid Measure stroke time Relief 3.1.9 Corrective valves in the to the nearest Granted I
action for IST program second, acceptance l
valves that tested at cold based on the actual stroke in shutdown. -
stroke time rather less than 2 than the 50%
seconds.
criteria.
Valve 3.3.2.1 IWV-3521, SI-107A,-107L, Partial stroke Relief 3.1.12 Testing
-1071A,-10718, exercise quarterly, Granted frequency for -108A,-1088, full stroke exercise check valves. -201A,-2018.
during refueling.
i Valve 3.3.1.4 IWV-3521, SI-142A, Partial stroke Relief 3.1.13 Testing
-1428, during cold Granted frequency for -143A, shutdowns, full check valves. -1438.
stroke during refueling.
Valve 3.3.1.S IWV-3521, SI-241, -242, Full stroke exercise Relief 3.1.14 Testing
-243, -244, during refueling.
Granted l
frequency for -510A, -5108.
Valve 3.3.2.2 IWV-3521, SI-207A,-2078, Full stroke exercise Relief 3.1.14 Testing
-207A/B, -216. during refueling.
Granted frequency for check valves.
Valve 3.3.1.1 IWV-3521, SI-329A, Sample disassembly Relief 3.1.16 Testing
-3298 each reft 91ing.
Granted frequency for -330A, check valves. -3308.
Valve 3.3.1.2 IWV-3521, SI-335A, Partial exercise Relief 3.1.18 Testing
-3358, during cold Granted i
frequency for -336A, shutdowns, sample check valves. -3368.
disassembly each i
refueling.
Valve 3.3.1.3 IWV-3521, SI-512A, Exercise during Relief 3.1.20 Testing
-5128.
refueling.
Granted frequency for
{
[
l 1
\\
[
F l.
u l
}
p q
l Page'No.
3 i
,10/06/88 WATERFORD STEAM ELECTRIC STATION, UNIT 3 SER TABLE 1 i
SUMMARY
OF RELIEF REQUESTS i
RELIEF
.TER SECTION XI EQUIPMENT-ALTERNATE
~ ACTION l
L REQUEST SECTION REQUIREMENT IDENTIFICATION METHOD OF-BY.
l l
hUMBER
& SUBJECT TESTING USNRC m
I Valve 3.3.2.3 IWV-'3521, SI-604A, sample disassembly Relief 3.1.21 Testing
-604B.
each refueling.
Granted frequency for check valves.
Valve 3.3.2.4 IWV-3521, SI-122A, Partial stroke Relief
^
3.1.24 Testing
-1228.
exercise quarterly,. Granted i
frequency for full stroke exercise check valves.
each refueling.
Valve 3.4.1.1 IWV-3521, CS-128A, Sample disassembly-Relief 3.1.30 Testing
-1288.
at refueling.
Granted frequency for check valves.
Valve 3.6.1.1 IWV -352'1, IA-910, Exercised during Relief 3.1.33 Testing ARM-104.
Appendix J testing.
Granted frequency for check valves.
. Valve 3.1.3.1 IWV-3521, SA-909,CMU-245 Excercised during Relief 3.1.35 Testing PMU-152,NG-158 leak rate testing Granted frequency for FP-602.
at refueling.
Valve 3.8.1.1 IWV-3413, HRA-101A/B, Timely operation Relief 3.1.38 Stroke timing -102A/B, will be based on the Granted of power
-103A/B, observation of flow u
operated
-104A/B, from the hydrogen valves.
105A/B, analyzer and the low
-106A/B, flow alm.
-201A/B,
-202A/B.
Valve 3.3.2.5 IWV-3522(b),
SI-717A, Full stroke exercise Relief-3.1.39 Exercising
-7178.
quarterly by hand.
Granted procedure for check valves.
i Valve 3.2.1.1 IWV-3411, RC-1014,-1015, Full stroke exercise Relief
- 3..). 4 2 Testing
-1017,-3183, at cold shutdown, if Cranted Frequency.
-3184,-3186.
the RCS is depressurized, or refueling outages.
_.m___.____.__.______
-Page No..
4
. 10/06/88.-
.WATERFORD: STEAM ELECTRIC. STATION, UNIT l3 SER TABLE 1
SUMMARY
OF RELIEF REQUESTS RELIEF TER SECTION) XI' EQUIPMENT-ALTERhATE ACTION REQUEST.
SECTION-REQUIREMENT IDENTIFICATION
-METH00 0F BY NUMBER-
& SUBJECT TESTING.
USNRC ValveL 3.5.1.1 IWV-3522(b),
CAR-102A,-102B Full. stroke exercise ~ Relief
- 3.1.47 Exercising
-102, -202. during cold Granted procedure for.
shutdowns by hand.
Valve 3.7.1.1 IWV-3413, NG-609, -610, Timely operation
. Rel _i e f 3.1.52 Stroke timing.
-709, -7.10, will be based on Granted power
-809, -810, observation of flow operated
-909, -910.
'ftom the associated-valves.
Y I
?
l l
4 4
l