w lllllllll7h Log # TXX-88011 1
File # 10130
~~
r C
IR 84-16 Ref. # 10CFR2.201 7UELECTRIC I,',7lf,S
/,",$,,u January 7,1988 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 EdBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION ITEM A (445/8416-V-01)
REF:
- 1) TUGC0 Letter TXX-4346 from B. R. Clements to R. L. Bangart dated November 1, 1984
- 2) TUGC0 Letter TXX-4369 from B. R. Clements to R. L. Bangart dated November 28, 1984
- 3) TUGC0 Letter TXX-4393 from B. R. Clements to R. L. Bangart dated January 14, 1985.
Reference (6) stated that the required modifications and rework of Unit 1 Cable Tray Hangers (CTH) were scheduled for completion by a revised date of January 8,1988.
As a result of the substantial effort required by these programs, the scheduled completion date for the modification and rework of tinit 1 Cable Tray Hangers is hereby revised to be February 26, 1988.
8901120351 880107 PDR ADOCK 05000445 G
PDR 400 North Ohve Street LBof Dallas, Texas 7D01 0
I i
i
'TXX-88011 January 7, 1988 Page 2 of 2 Our completion date for the Unit 2 CTH modification and rework program is still scheduled for October 31, 1988, as stated in reference (5).
Very truly yours, W. G. Counsil By:
J@h W. Beck Vice President, Nuclear Engineering l
DAR/grr c-Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) j l
l
. _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _