TXX-6614, Advises That Completion Date for Implementation of Mods to Unit 1 Cable Tray Hangers (Cth) Revised to 871102,per Violation a Noted in Insp Rept 50-445/84-16.Completion Date for Unit 2 Cth Program Revised to 881031

From kanterella
(Redirected from TXX-6614)
Jump to navigation Jump to search
Advises That Completion Date for Implementation of Mods to Unit 1 Cable Tray Hangers (Cth) Revised to 871102,per Violation a Noted in Insp Rept 50-445/84-16.Completion Date for Unit 2 Cth Program Revised to 881031
ML20236H492
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 07/31/1987
From: Beck J, Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-6614, NUDOCS 8708050218
Download: ML20236H492 (1)


Text

. - _ ._ -

I

~~

M Log # TXX-6614 '

- --- File # 10130

-. _- IR 84-16 r = Ref # 10CFR2.201 1UELECTRIC mmm c. coumu July 31,1987 Decutive he Preudent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION ITEM A (445/8416-V-01)

REF: 1) TUGC0 letter TXX-4346 from B. R. Clements to R. L. Bangart dated November 1, 1984.

2) TUGC0 lett'er TXX-4369 from B. R. Clements to R. L. Bangart dated November 28, 1984.
3) TUGC0 letter TXX-4393 from B. R. Clements to R. L. Bangart dated January 14, 1985.
4) TU Electric letter TXX-6440 from W. G. Counsil to U.S.N.R.C.

dated May 8, 1987.

Gentlemen:

Reference (4) provided our updated response to Notice of Violation Item A (445/8416-V-01). In that response we stated that implementation of the required modifications and rework of the Unit 1 Cable Tray Hangers (CTH's) was scheduled for completion by August 1, 1987. As a result of the substantial effort required to complete this program, the scheduled completion date for the Unit 1 program is hereby revised to be November 2, 1987.

Our response also stated that completion of the Unit 2 CTH program was scheduled for December 27, 1987. Our scheduled completion date for the Unit 2 program has been extended to October 31, 1988.

Very truly yours, is.G. Q W. G. Counsil 8708050218 870421 e BY: W' PDR ADOCK 05000445 J6hn W. Beck R PDR Vice President Nuclear Engineering DAR/gj c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 400 Nonh Olive Street LB 81 Dallas, Texas 73201 t(O