Text
- --______
- ( @ % I:MI
'l C Q A PROGRAM RELATED QA IMPLEMENTING
@ NON QA TITLE INSPECTION PROGRAM - DIVISION OF NUCLEAR POWER - STEAM / WATER EROSION OF PIPING AND CORROSION OF RAW WATER CARBON STEEL PIPING MAINTENANCE AND ENGINEERING PROCEDURE NO.
TS 09.01.01.14.02 PROGRAM DATE: AIAR 6 S 34 PREPARED / REVISED:
y gg J
V SUBMITTED BY: Supervisor, Chemical Metallurgy and
/
(
Standards Group
/,
CONCURRENCE: Chief, Quality
[
Engineering Branch bh scfacW
__ PROGRAM MANAGER APPROVA(:
\\
Chief, Mechanical Branch x
i l
1 i
JUSTIFICATION: This program procedure addresses concerns raised by piping failures at i
both Browns Ferry and Sequoyah Nuclear Plants in extraction and raw water piping and by NRC IE Information Notice 82-22.
The program will identify.and monitor potential Additionally, problem' areas in the raw water and the turbine exhaust piping systems.
it defines acceptance criteria for continued operation when wall degradation is It present based on evaluations performed by NCO and plant maintenance organizations.
also identifies each organizational responsibility for corrective action (i.e., weld repair, pipe replacement) as needed.
j This program provides an orderly approach to early detection of isolated and large scale system degradation and will only require Trades and Labor (insulators, carpenters) manpower support for implementation.
p
)
Approved:
s P. R. Wallace 8709230143 870918 ADOCK 05000259 I
d___P DR
@l__ _
PDR i
1
($ %[4-1 IIAR
$ 1984 PAGE I
DATE
Title:
INSPECTION PROGRAM DIVISION OF NUCIZAR POWER
"~
~~
~
L STEAM / WATER. EROSION OF PIPING AND CORROSION PROCEDURE
/
0F RAW WATER CARBON STEEL PIPING NO.
TS.09.01.01.14.02 KEYWORDS:
Inspection Program, Piping Erosion, Piping Corrosion, Raw Water Carbon Steel Piping Piping, Erosion Piping, Corrosion
]
SOURCE DOCUMENTS:
(None)
I.
PURPOSE To outline the requirements and responsibilities for establishing a surveillance program for turbine exhaust piping subject to steam erosion j
and a program for raw water piping systems subject to pitting attr.ck and j
j wastage.
l II.
SCOPE l
1 This program applies to all TVA nuclear power plants and identifies the requirements and responsibilities of each NUC PR organization to l
determine pipe wall integrity within turbins exhaust or raw water piping systems.
III.
PROCEDURES 3.1 General--Turbine Exhaust Piping 3.1.1 The following actions are required for the detection and prevention of erosion in carbon steel turbine exhaust P Ping.
i (a) Review of piping systems for problem areas.
(b) Special attention to low-point piping.
(c) Inspection of problem areas for erosion.
(d) Proper functioning of moisture traps in systems.
(e) If any unexpected leaks occur because of erosion, examination of other suspect areas as soon as practical.
h
[4:1 PAGE 2
DATE MAR 6 864
Title:
INSPECTION PROGRAM DIVISION OF NUCLEAR POWER STEAM / WATER EROSION OF PIPING AND CORROSION PROCEDURE OF RAW WATER CARBON STEEL PIPING NO.
TS.09.01.01.14.02 f
I 3.2 Organizational Reslsonsibilities for the Evaluation of Turbine Exhaust Piping l
The NCO Metallurgy and Codes Section (M&CS) will take lead 3.2.1 responsibility for ensuring that appropriate examinations and recommendations for corrective action for steam and I
drain piping are made at each plant site. The Mechanical l
Systems Group will perform system reviews to identify potential problem areas in steam and drain piping and provide recommendations to the M&CS. Top priority will be f
given to areas that could compromise personnel safety or i
nuclear safety.
3.2.2 M&CS will ensure that ultrmnic (UT) examinations of the i
identified areas are performed.
Inspection frequency will 4
{
be designed to prevent failure of the pipe. M&CS will e
assist in establishing piping system grids to ensure that areas most susceptible to corrosion and erosion are 1
examined.
3.2.3 The Quality Engineering Branch (QEB) shall be responsible for performing all UT examinations.
The results of the
(
examinations shall be recorded on Attachment I and forwarded to M&CS.
3.2.4 Piping shall be evaluated for continued operation when wall loss reaches 0.080 inch or greater.
M&CS will assist in
{
evaluating the examination data, making replacement material recomunendations, or evaluating continued operation beyond 0.080 inch wall loss (as needed).
The plant will schedule corrective action for affected piping.
1 I
I 3.3 General *-Raw Water and Fire Protection Piping 3.3.1 The following actions are required for the detection and prevention of pitting and wastage in carbon steel raw water and fire protection piping.
(a) Review of raw water ct.'.,n steel piping systems and fire protection piping system for problem areas.
- Also, l
evaluate the effectisraess of the chlorination program j
for the prevention of biofouling.
j l
(b) Special attention to stagnant and low velocity j
flow piping.
{
(c) UT and visual examination of problem areas for pitting corrosion attack and wastage.
l i
l (d)
If any unexpected leaks occur because of pitting l
corrosion attack and/or wastage, examination of l
other suspect areas as soon as practical.
l l
1 i
l Y_ _ _-_ _ __.
~
. p..
O PAGE 3
DATE
Title:
INSMICT.10}i PROGRAM DIVIG20N OF L'UCII.AR P:WER STEAM / WATER EROSION OF PIPING AND CORRC/> ION PROCEDURE 0.yRAWWATERCARBONS*DIEIPIPING NO. _ TS.09.01.01.14.02 j
3.4 Organization Responsibilities for the Evaluation of Raw Water and Fi.ze Protection Pipint 3.4.1' M&CS will take lead responsibility for ensuring that necesswy inspections, examination, and recommendations ti r corrective action for all raw water carbon steel p:.;ing including fire protection piping; will be made at eacb plant site. Tne hechanical Systents Group and Fire Protection Engineering; Section will perform their
- respective system,sviews to identify areas where stagnant l
and low velocity fj ou' exist and provide recommendations f
for inspectilon to the H&CS. Top pri6tity will be given to areas where noelear safety is of prijnary concern.
I 3.4.2 M&CS will casute thr.t UT examinations to monitor for pipe wall degrad6tico of,tte areas, identified in both the raw I
w7,ter 2nd fire protection systeme.are perfnu.ed at intervals der 1Anca' te prevent.f ailure of the pipe. M&CS will assist is estr.~Dlishing pipine system grfils to ensure that the areas mostsusceptibletppittingareexamined.
3.4.3' QEB shall be responsible for performi.ng all UT examinations.
The results of the examinations shall be recorded on and forysrded to M&CS.
3.4.4 Piping shall be evaluated for contirv.ed operation when wall it.sr, reachec 0.080 inch or g: eater. M&CS will assir,t in evnv.ating Ur data, making rwterial recommendations, or escluatO.p, continaed operation beyond 0.080 inch wall loss (a. nect'ed ). Tth plact will schedule correct 2ve action for affected piping.
TI;Z:Ull:TRW:RW i
j Attactunent b
V n
a 1
~~,4.
.,o.,
l l
h h [:P:t
,i
~
PAGE 4
DATE N.'a 6 1384 j
Title:
INSPECTION PROGRAM DIVISION OF NUCLEAR POWER STEAM / WATER EROSION OF PIPING AND CORROSION PROCEDURE OF RAW WATER CARBON STEEL PIPING NO.
TS.09.01.01.14.02 l
ATTACIDfENT 1 i
I
}
I I
I DATA FORM FOR ULTRASONIC TEST INSPECTION 3
0F CARBON STEEL PIPING 1.
Unit and System:
i i
2.
Location:
j 3.
Grid No.:
I 4.
Pipe Diameter:
t I
5.
Schedule or Nominal Wall:
l i
6.
Date:
7.
Sketch of Grid Location:
8.
Inspector (Signature):
1 Comments:
TVA7931
i g_
PAGE 5
DATE AMR 6 1934 I
Title:
INSPECTION PROGRAM DIVISION OF NUCLEAR POWER STEAM / WATER EROSION OF PIPING AND CORROSION PROCEDURE 0F RAW WATER CARBON STEEL PIPING NO.
TS 09.01.01.14.02 I
l e
S 3
.1 1
1 I
~
,~
E
=
4 0
=
l w
h e
i 2
M E
O 5
4 M
N t
v o
=
o a
z j
i
_