Forwards Safety Insp Rept 50-440/87-15 on 870629-0701 & 0824-29 & Notice of Violation.Insp Showed Action Taken to Correct Violation & Prevent Recurrence.Understanding of Corrective Action Described in Rept
ML20234E988
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/15/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20234E991 List:
References
NUDOCS 8709220588
Download: ML20234E988 (2)


See also: IR 05000440/1987015

Text

,


- - - - - - - - - - - - - - - - - - - - - - - ------ - - - ---

.

.

SEP 151987

Docket No. 50-440

The Cleveland Electric Illuminating

Company ,

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. N. C. Choules

and T. H. Carter of this office on June 29-July 1 and August 24-28, 1987, of

activities at Perry, Unit 1 authorized by NRC Operating License No. NPF-58

and to the discussion of our findings with Mr. C. M. Shuster and others at

the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation l

of NRC requirements, as described in the enclosed Notice. The inspection

showed that action had been taken to correct the identified violation and

to prevent recurrence. Our understanding of your corrective actions are

described in Paragraph 2.b(4). of the enclosed inspection report. Consequently, l

ao reply to the violation is required and we have no further questions regarding l

this matter at this time.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

,iRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection. ,

Sincerely,

i

'

B70920508%%h4o

PDR DOCK PDR J.J. arrison, Chief

G Engineering Branch

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-440/87015(DRS)

See Attached Distribution

RI RI RIII RI

i es/ims

M

J- lonski i/ mM knop 4 h son gi(

I

Y

- - - -

W -

1E0/

_-_ _ _ _

.

.

SEP 151987

The Cleveland Electric Illuminating 2

Company

I

Distribution

cc w/ enclosures:

F. R. Stead, Manager, Perry .

Plant Technical Department l

M; D. Lyster, Manager, Perry Plant  !

Operations Department l

Ms. E. M. Buzzelli, General '

Supervising Engineer, Licensing

and Compliance Section  !

DCS/RSB (RIOS) I

Licensing Fee Management Branch I

Resident Inspector, RIII l

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio l

Robert M. Quillin, Ohio 1

Department of Health

State of Ohio, Public

Utilities Commission