JUN 3 01987
,
,
In Reply Refer To:
Docket:
50-285/87-13
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Messrs. P. H. Harrell, L. D. Gilbert,
and R. P. Mullikin of this effice during the period May 1-31, 1987, of
activities authorized by NRC Operating License DPR-40 for the Fort Calhoun
4
Station, and to the discussion of our findings with Mr. W. G. Gates and other
j
members of your staff at the conclusion of the inspection.
Areas examined during the inspection included operational safety verification,
maintenance, surveillance, plant tours, safety-related system walkdown, security
i
observations, radiological protection observations, in-office review of periodic
!
and special reports, followup on previously identified items, followup on
g
allegations related te welding, review of the program for installation of
j
heat-shrinkable tubing, review of licensee actions related to reactor vessel
!
transient protection, verification of containment integrity, review of
'
modification testing for installation of a containment equipment storage
platform, review of the licensed operator training program, and containment
local leak rate testing. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the NRC inspectors.
The inspection findings are
documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section ~2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
l
Violation enclosed with this letter,
j
1
We have also examined actions you have taken with regard to previously
j
identified inspection findings.
The status of these items is identified in
i
paragraph 2 of the enclosed report.
During review of these items, it was noted
'
that three previously identified unresolved items related to the licensed
operator training program could not be closed due to inadequate implementation
of corrective actions.
For this reason, it is requested that you provide a
response, within 30 days of the date of this '.etter, to the three unresolved
items discussed in paragraph 16 of the enclosed inspection report.
Your
'
response should include actions you intend to take to satisfactorily resolve the
items, and the date when your ac ions will be completed.
TM
ilfM
D
4#
RI/FCS
PI/FCS
C:RSB/E
AC k
C: RPB/B
p
B
l
MEEmersonh0RHuntergEGagliardo
4PHarrell/nc RPMullikin LG bert REIreland
!
I b /(B/87
L, / g/87
(9//f/87 t,/If/87
to/f/87
& /6/87
6/ /87
j
\\
3
8707070637 870630
N
l
ADOCK 05000285
'Y
l
G
j
l
_ - _ _ __-__
__- _ _--
a
1
l
Omaha Public Power District
-2-
)
I
i
The response directed by this letter and the accompanying Notice is not subject
j
to the clearance procedures of the Office of Management and Budget as required
i
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
j
discuss them with you.
l
Sincerely,
, ~ a.so wu,;os u
% c. HN;L*'
J. E. Gagliardo, Chief
\\ Reactor Projects Branch
l
!
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
)
i
50-285/87-13
cc w/ enclosures:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
)
1333 New Hampshire Avenue, NW
j
Washington, DC 20036
.
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
'
bcc to DMB (IE01)
bcc distrib. by RIV:
- RPB-
- RRI
R. D. Martin, RA
- R&SPB
- SectionChief(RPB/B)
- MIS System
-
- RIV File
DRSP
- RSTS Operator
- RSB
- Project Inspector
- D. Weiss, RM/ALF
- R. Hall
M. Emerson (3)
- L. Gilbert
- R. Ireland
l
- w/766
r