ML20234D178

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/87-25 on 871116-1215 & Notice of Violation
ML20234D178
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/30/1987
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20234D180 List:
References
NUDOCS 8801060485
Download: ML20234D178 (3)


See also: IR 05000382/1987025

Text

_

- __

. . .

.

. ..

In Reply Refer To:

Docket: 50-382/87-25

DEC 30 IWf

Louisiana Power & Light Company

ATTN: J. G. Dewease, Senior Vice President

Nuclear Operations

317 Baronne Street

New Orleans, Louisiana 70100

Gentlemen:

This refers to the inspection conducted by Messrs. W. F. Smith and T. R. Staker

of this office during the period November 1G through December 15, 1987, of

activities authorized by NRC Operating License NPF-38 for the Waterford Steam

l Electric Station, Unit 3. and to the d'it.ussion of our findings with

l Mr. N. S. Carns and other members of your staff at the conclusion of the

j inspection.

l Areas examined during the inspection included followup of previously identified

items, i.wnthly surveillance observation, monthly maintenance observation,

engineered safety feature system walkdown, cold weather preparations

~

j

inspection, onsite followup of events, operational safety verification,

'

licensee event report followup, and plant status. Within these areas, the

,

inspection consisted of selective examination of procedures and representative

l records, interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to 1

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

'

'

Y Y

Y

j: N' _(

w- \j i

~

(

'

l ,

-  : /A D DRP

[ ' RIV:RI

TStaker I M, RI'/: SRI

WSmith JJaddon LJCal'an

phb ph IkM M[

p, . i

8801060485 871230 ) \

PDR ADOCK 05000382

0 DCD

_-____-_______-_____A

!

. ,  !

Louisiana Power & Light Company -2-

Should you have any questions concerning this inspection, we will be pleased to-

discuss them with you.

Sincerdy,inal

g Siened By

L. J. Callan

L. J. Callan, Director 1

Division of Reactor Projects I

Enclosures: 1

1. Appendix A - Notice of Violation i

2. Appendix B - NRC Inspection Report j

50-382/87-25

cc w/ enclosures:

Louisiana Power & Light Company

ATTN: N. S. Carns, Plant Manager

P.O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company j

ATTN: K. W. Cook, Manager i

Nuclear Safety & Regulatory Affairs

317 Baronne Street

P.O. Box 60340

New Orleans, Louisiana 70160

Louisiana Power & Light Company

ATTN: G. E. Wuller, Onsite

Licensing Coordinator

P.O. Box B

Killona, Louisiana 70066

Middle South Services

ATTN; Mr. R. T. Lally

P.O. Box 6100

New Orleans, Louisiana 70161

Louisiana Radiation Control Program Director

bec to DMB (IE01)

bcc distrib. by RIV:

  • Section Chief (DRP/A) *DRP

RPSB-DRSS * MIS System

- -___--

.

. .

i

'

,. l

.,

!

Louisiana Power & Light Company -3-

  • Project Engineer, DRP/A *RSTS Operator
  • RIV File *J. Wilson, NRR Project Manager
  • R. Hall *DRS-
  • TSS *Lisa Shea, RM/ALF 'I
  • w/766

l

.

l

!

!

!

t

l

_ _ _ _ - - _ _ _ _ - _ _ - - _ - -