JUN 261987
Docket No. 50-456
Docket No. 50-457
.
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. T. Ploski
of this office on June 10-16, 1987, of activities at the Braidwood Nuclear
.
Generating Station, Units 1 and 2, authorized by NRC Operating License
No. NPF-59 and Construction Permit No. CPPR-133, and to the discussion
of our findings with Mr. P. Barnes and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC Public Document Room.
We will' gladly discuss any questions you have concerning this inspection.
Sincerely,
'OriginaY signed W W. G e M
8707060624 870626
ADOCK O
4j6
0
Radiological Protection Branch
Enclosure:
Inspection Reports
No. 50-456/87021(DRSS); and
No. 50-457/87019(DRSS)
t
See Attached Distribution
25
/
I
-
l
"I.W NMel
"Y
Y
69,
Ploski/Ims
Snell
Sh a%
,ithe
/
j
'
6[y
d
ifl
\\
vd
4
,
Commonwealth Edison Company
2
JUN 2 61987
Distribution
cc w/ enclosure:
'D. L. Farrar, Director
of Nuclear Licensin5
M. Wallace, Project Manager
.
W. Vahle,-Construction
Superintendent
E. E. Fitzpatrick, Station -
Manager
P. L. Barnes,' Regulatory
Assurance Supervisor
)
DCS/RSB(RIDS)
'
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
-Resident Inspector, RIII Byron
D. W. Cassel, Jr. , Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, 0GC
J. Moore, OGC
G. Berry, OGC-
J. Stevens, NRR
.The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
'The Honorable Richard F. Cole, ASLB
D. Matthews, EPB, NRR
W. Weaver, FEMA, RV