Forwards Safety Insp Rept 50-440/87-22 on 871103-1221 & Notice of Violation
ML20234C168
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 12/29/1987
From: Wright G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML20234C171 List:
References
NUDOCS 8801060129
Download: ML20234C168 (2)


See also: IR 05000440/1987022

Text

r.-

t# 4

Y

. .

.

I

=

}

DEC 2 91987

Docket No. 50-440

Docket No. TO 441

The Cleveland Electric Illuminating

Company

ATTN: Mr. Murray R. Edelman

Vice President

Nuclear Group

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the special safety inspection conducted by Messrs. R. A. Hasse,

D. S. Butler, and Ms. P. R. Rescheske of this office on November 3 through

'

December 21, 1987, of activities at Perry Nuclear Power Plant, Unit 1, authorized

by NRC Operating License No. NPF-58 and to the discussion of our findings with

Mr. M. D. Lyster and others of your staff at the conclusion of the inspection.

This inspection consisted of an examination of your safety evaluations conducted

pursuant to the requirements of 10 CFR Part 50, Section 50.59. One violation

(failure to perform a required safety evaluation) was identified, as specified

in the enclosed Notice. In view of a previous violation issued for a similar

failure, your response should also address the adequacy of corrective actions

taken in response to the previous violation.

!

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

The responses directed by this letter and the accompanying Notice (Order)

are not subject to the clearance procedures of the Office of Management

and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

r- - - - ' -,

.g -

,

G. C. Wright, Chief

Operations Branch

Enclosures:

1. Notice of Violation

2. Inspection Report

No. 50-440/87022(DRS)

See Attached Distribution

D

,RIII II R I II RIII N RII

M

dse/kj M)g Bu

he

r

[esl M ,e k

Phi

h

ips Kn$(/

op

l L

Wright ; \

'

8801060129 971339

b Sl Ub Y W

PDR '

" ADOCK 05000440

/g /

M

_ _ - - - _ - _ _ _

'

.

.

.

.

The Cleveland Electric Illuminating 2

Company

Distribution

cc w/ enclosures:

F. R. Stead, Manager, Perry

Plant Technical Department

M. D. Lyster, Manager, Perry Plant

Operations Department

Ms. E. M. Buzzelli, General

Supervising Engineer, Licensing

and Compliance Section

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Harold W. Kohn, Ohio EPA

Terry J. Lodge, Esq.

James W. Harris, State of Ohio

Robert M. Quillin, Ohio

Department of Health

State of Ohio, Public

Utilities Commission