ML20217R365
| ML20217R365 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 08/28/1997 |
| From: | Addy R CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9709050099 | |
| Download: ML20217R365 (13) | |
Text
~
- CensumersEmwgy A ekf5[nergy Cawy gg y my g,, yg Eenneth P Peeners yp:{;gis 39 nytn MtlGeneral Afanager Chat.w AG 49720 August 28, 1997 Nuclear Regulatory Commissim Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT - INTEGRATED PLAN SEMI-ANNLIAL UPDATE NUMBER 27 As required by the Big Ro:k Point operating license, this letter provides the twenty-seventh Consumers Energy (and final) update of the Big Rock Point Integrated Plan.
has decided to cease permanent operation of the facility by August 30, 1997. A change to the operating license along with Technical Specifications is being prepared to delete the Integrated Plan and reflect a defueled plant configuration.
Several issues have been transferred to decomissioning tasks due to either partial or total applicability during decomissioning.
!$$UES ADDED None.
ISSUES RANKED None.
ISSUES CANCELLED
\\
BN 014C - Verification of Seismic Adeauacy of Active Components This issue has been transferred from an Integrated Plan item to a h
decomissioning task. A review of the seismic / structural requirements associated with spent fuel pool and associated concrete is being prepared for decomissioning planning.
B-183 - CRD System Performance Imorovements This issue is no lenger relevant due to the permanent plant shutdown and defueling.
no G 9709050099 970828 i
PDR ADOCK 05000155 W
PDR a
NLiCLEARREGULATORYCONMI5510N 2
BIG ROCK POINT PLANT SENI-ANNUAL INTEGRATED PLAN UPDATE 27 August 28, 1997 155UE5 CANCELLED (Continued) hj85 - RGEM Flow Imorovements Improvements have been achieved in RGEM system performance such that completion of the original scope of this issue is no longer necessary.
B-187 - Air Operated Valve (A0V) Pilot Proaram This issue is no longer relevant due to the permanent plant shutdown and defueling.
B-188 - Removal and Disoosal of Soent Fuel Pool Stored items This issue has been transferred from an Integrated Plan item to a decommissioning task.
B-191 - On-line Condenser Tube Pluaaina This issue is no longer relevant due to the permanent plant shutdown and defueling.
B-193 - Relocate EDG Voltaae Reaulator Periodic cleaning of voltage regulator has resolved this issue.
EDG performance is now acceptable without regulatory relocation such that completion of the original scope of this issue is no longer necessary.
B-194 - Station Power System load Balancina This issue has been transferred from an Integrated Plan item to a
- decommissioning task. A decommissioning electrical power system addition will address this issue.
BN-195 - UFHSR Conformance Review This issue is no longer relevant due to the permanent plant shutdown and defueling.
Review of RPS (Reactor Protection System) was completed with acceptable results. A decommissioning task is developing a design bases summary for the spent fuel pool.
BN-196 - Demineralized Water System Overoressure Protection This issue is no longer relevant due to the permanent plant shutdown and defueling.
B-197 - CRD Scram Dumo Tank Header Dose Reduction This issue _ is no longer relevant due to the permanent plant shutdown and defueling. Decommissioning work packages will address this issue.
NU' CLEAR REGULATORY CONNIS$10N 3
j BIG ROCK P0 INT PLANT j
SENI-ANNUAL INTEGRATED PLAN UPDATE 27 August 28, 1997 IS$UES CANCELLED (Continued)
B-198 - 125 VDC Distribution Panel (002) Reolacement i
This issue is no longer relevant due to the permanent _ plant shutdown-and i
defueling. Replacement breakers have been located to support testing, with testing completed on a representative sample of breakers in early 1997, 115UE5_ COMPLETED B-126A - Station Air System Unarade Installation of a fourth air compressor to provide service air system needs and provide a backup for instrument air syste..n has been completed.
B-190 - Reactor Deck Concrete Repairs The concrete repairs to the reactor deck have been completed.
B-192 - Resin Sluicina Line Replacenent Installation of an alternate resin sluicing line has been completed.
~
3 Robert J Addy Plant Manager CC: Administrator, Region III, USNRC
-NRC Resident Inspector - Big Rock Point
-ATTACHMENT
4 7
i t
j.
ATTACHNENT 1 4
CONSUNERS POWER COMPANY BIG ROCK Po!NT PLN4T DOCKET 50-155 r
ISSUE INDEX FOR THE BIG ROCK POINT INTEGRATED PLA1 1
Submitted August 28, 1997 I-4 i
i 4
9 Pages i
i S
4 4
4 4
9 9.
~,..
y..,
. - ~ ~..,
_,-,.....w-
.,y
..r,--w rew---
- - - - +--- -
T c-
ISSUEi NUMBER BAE DESCRIPTION STATUS B-001 HEAT EXCHANGER TUBE BUNDLE REPLACEMENT COMPLETE 6002 ACID LINE EXTENSION COMPLETE B 003
-REACTOR COOL %NT PRESSURE BOUNDARY LEAKAGE DETECTION COMPLETE B-004 STACK GAS MONITORING COMPLETE BN-005 CONTROL: ROOM DESIGN REVIEW COMPLETE u
BN-005A
. CRITICAL SAFETY FUNCTIONS CANCELED BN-005B IMPROVE COMMUNICATIONS COMPLETE BN-005C RESOLVE HED W/RCP CONTROLS COMPLETE BN-0050
-THIRTY-THREE MINOR CHANGES
. COMPLETE BN 005E AUTOMATED PLANT SIREN CONTROL COMPLETE BN 005F ECS LEVEL IMPROVEMENTS CANCELED BN-005G -
RELOCATE RELIEF VALVE AC0USTIC HONITOR-CANCELED-BN-005H ISOLATION VALVE IWDICATION COMPLETE BN-006-SAFETY PARAMETER DISPLAY SYSTEM COMPLETE c
i-B-007 SCRAM DUMc IANK LEVEL INSTRUMENTATION COMPLETE-B-008 SINGLE CHANNEL RESET INVESTIGATION COMPLETE-
-B-009 REACTOR COOLING WATER PRESSURE STUDY COMPLETE B-009A INSTALLATION OF TELLTALES ON SHUTDOWN HEAT EXCHANGER.
COMPLETE B-010 VENTILATION FOR PANEL C-52 COMPLETE B-011 RUCKER SYSTEM (STUDY)
COMPLETE B-011A TURBINE-BYPASS SYSTEM IMPROVEMENTS COMPLETE B-012 RESIDUAL HEAT REMOVAL HEAT EXCHANGER TUBE FAILURE COMPLETE B-013-PURITY OF PRIMARY COOLANT COMPLETE B-014 SEISMIC DESIGN CONSIDERATIONS COMPLETE IM14A.
RESOLUTION OF SEISMIC ISSUES' COMPLETE BN-014B.
. SEISMIC ADEQUACY 0.'
ACTIVE COMPONENTS COMPLETE BN-014C
. SEISMIC ASc.QUACY OF ACTIVE COMPONENTS CANCELED
+
B-015-CONTAINMENT ELELTRICAL PENETRATIONS COMPLETE B-016 SECONDARY SYSTLM INSTABILITIES COMPLETE B-017 PCS ISOLATION - PC SYSTEM COMPLETE B-018 HIGH PRESSURE RECYCLE CANCELED B-019 HYDROGEN MONITORING COMPLETE B-020-INSTRUMENTATION TO DETECT INADEQUATE CORE COOLING COMPLETE B-021 RECIRCULATION PUMP TRIP COMPLETE BN 022A-ORGANIC MATERIALS (WALL C0ATINGS)
COMPLETE B-0228 POST ACCIDENT CHEMISTRY - SEP TOPIC VI-l COMPLETE B-023 BALANCE OF PLANT QA PLAN DEVELOPMENT CANCELED
-B-024 INSTALLATION OF DP GAUGE ON NONREGEN HEAT EXCHANGER COMPLETE BN-025 WIND AND TORNADO LOAD & TORNADO MISSILE -
COMPLETE SEP T091CS III-2 & III-4.A B-026 ISI 0F WATER CONTROL STRUCTURES COMP!ETE B-027 SERVICE WATER / COOLING WATER SYSTEMS COMPLETE i
B-028 PROXIMITY OF TECTONIC STRUCTURES COMPLETE B-OH TURBINE MISSILES COMPLETE
'A-030 RADIOLOGICAL EFFLUENT. TECHNICAL SPECIFICATIONS COMFLETE B-031 DEFINITION OF OPERABILITY COMPLETE BN-032 LMERGENCY OPERA' :NG PROCEDURE UPGRADE COMPLETE B-033 REFERENCE VOLUME CHAMBER REMOVAL COMPLETE B-034 CONTROL ROOM AIR CONDITIONING COMPLETE A-035B FHSR UPDATE STUDY COMPLETE A-036 ENVIRONMENTAL QUALIFICATION OF ELECTRICAL COMPLETE EQUIPMENT (EEQ)
B-036A' EEQ PROGRAM ENHANCEMENTS COMPLETE B-037-PROBABLE MAXIMUM FLOOD CONSIDERATIONS COMPLETE B-038 SAFETY RELATED WATEP, SUPPLY - SEP TOPIC II-3.C COMPLETE B-039 EFFECTS OF HIGH. WATER LEVEL - SEP TOPIC III-3.A COMPLETE B-040 PIPING AND SAFE END INTEGRITY COMPLETE g
WF
'B-041 CLASSIFICATION OF STRUCTURES, SYSTEMS & COMPONENTS COMPLETE-B-042 ONGOING ISI' COMPLETE B 043 MECHANICAL SNUBBERS COMPLETE B-044 VERIFICATION OF BS&B VALVE DATA COMPLETE B 045 ECCS TEST TERMINAL BOX CANCELED B-046 REVISED REACTOR VESSEL PRESSURE / TEMPERATURE LIMITS COMPLETE B-047 SPENT FUEL POOL CLEANUP-COMPLETE B-048 CLEANUP DEMINERALIZER SYSTEM PUMP REPLACEMENT COMPLETE INVESTIGATION B 049 VENTILATION SYSTEMS COMPLETE B-050Al MSIV BACKUP VALVES - LEAK TESTING COMPLETE BN-050A2 CONTAINMENT ISOLATION - ONLINE TESTING 0F MSIV COMPLETE' BN-050B CONTAINHENT ISOLATION - LEAK IEST OF SERVICE AND COMPLETE INSTRUMENT AIR B-050C CONTAINMENT ISOLATION - ISOLATION VALVES IN COM?LETE HEATING, COOLING OR SERVICE WATER B-050D CONTAINMENT ISOLATION - ADD CONTROL CIRCUIT TO CLMPLETE' TREATED WASTE VALVE (CV-4049)
B-050E CONTAINMENT ISOLATION - AIR LOCK TESTING -
COMPLETE SEP TOPIC VI-4 B-050F CONTAINMENT ISOLATION - HAND ISOLATI0ft OF COMPLETE INSTRUMENT LINES - SEP TOPIC VI B-050G-CONTAINMENT ISOLATION - PNEUMATIC TEST OF MSIV -
COMPLETE SEP TOPIC VI-4 BN-OSI:
DESIGN CODES, CRITERIA AND LOAD COMBINATIONS COMPLETE B-052 HELB - SEP TOPIC III-5.A COMPLETE B-05S PIPE. BREAKS OUTSIDE CONTAINMENT COMPLETE B-054 PLANT SHIELDING - NUREG-0737 ITEM II.B.2 COMPLETE B-055 METEOROLOGICAL TOWER COMPLETE B-056 ESF UPGRADE COMPLETE B-057 CONTROL ROOM HABITABILITY - NUREG-0737 COMPLETE B-057A-CONTROL ROOM HABITABILITY - SEAL DOORS COMPLETE I
J
B-058-POST ACCIDENT SAMPLING-COMPLETE B 059 MSLB OUTSIDE CONTAINMENT COMPLETE
{
B-060 REVISED SECURITY-PRINTS CANCELED
'B-061 EQUIPMENT IDENTIFICATION CANCELED B-062 REVISE DRAWINGS (SYSTEM CHECKSHEET VERIFICATION)
COMPLETE B-063 CONTAINMENT PURGE AND VENT COMPLETE B-064 CONTAINMENT ILRT COMPLETE B-065-TEST CARD READER CANCELED l-
.B-066 RADWASTE MONITOR FLUSH TIMER CANCELED B-067 ISOLATION OF RPS FROM NONSAFETY SYSTEMS COMPLETE L
B-068
-DC SYSTEM MONITORING COMPLETE B-069 ACID AND CAUSTIC TANK PROBLEMS COMPLETE B-070~
EDG PANEL VENTILATION COMPLETE B-071 CHANGE PIPING IN CHEM LAB HOT HOOD CANCELED B-072-FACILITY MODIFICATIONS - WAREHOUSE COMPLETE B-073 CONTROL OF HEAVY--LOADS COMPLETE B-074-REACTOR COOLANT SYSTEM'- HIGH POINT VENTS COMPLETE A-075A ALTERNATE SHUTDOWN SYSTEM COMPLETE A-075B RADIANT ENERGY SHIELDS COMPLETE A-075C ASSOCIA1ED CIRCUITS COMPLETE.
- B-076 CONTAINMENT HIGH RANGE MONITOR COMPLETE B-077-INVESTIGATE INCORE AVAILABILITY PROBLEM COMPLETE B-077A.
INVESTIGATE INCORE AVAILABILITY PROBLEM CANCELED B-078 CLEANUP SYSTEM DRAIN Uhh CANCELED B-079 CONTROL'R0D MISOPERAT1oN COMPLETE' B-080-PERFORMANCE OF BWR SAFETY VALVES COMPLETE B-081 POSITION INDICATION OF PORV'S COMPLETE B-082 RDS RELIABILITY IMPROVEMENTS COMPLETE
+
B-083 FULL-STROKE TESTING OF REACTOR DEPRESSURIZATION CANCELED VALVE (This issue was combined with Issue B-82)
B-084 SCRAM DUMP TANK VALVE - LACK 0F REDUNDANCY (STUDY)
COMPLETE B-084A-SCRAM DUMP TANK REDUNDANT VALVES COMPLETE B-085 CONTAINMENT OVEP. PRESSURE - NITROGEN SUPPLY TO RDS COMPLETE ISOLATION VALVES B-086 BYPASS OF MOV THERMAL OVERLOADS COMPLETE B-087-PIPE BREAK OUTSIDE OF CONTAINMENT COMPLETE i
l B-088 MSLB OUTSIDE CONTAINMENT - RADIOLOGICAL CONSEQUENCES COMPLETE
-B-089 RCPB LEAKAGE DETECTION COMPLETE BN-090-CLASSIFICATION OF STRUCTURES, SYSTEMS AND COMPONENTS COMPLETE B-091 CONTAINMENT ISOLATION - POST LOCA SYSTEM WALKDOWNS COMPLETE B-092 CONTAINMENT ISOLATION - CLOSED SYSTEMS COMPLETE B-093 EMERGENCY RESPONSE FACILITIES (UPGRADE TSC)
COMPLETE B-094A POST TRIP REVIEW - DATA & INFORMATION CAPABILITIES COMPLETE B-094B POST TRIP REVIEW - DATA & INF0P.MATION CAPABILITIES C0h/LETE B-095 INSTALLATION OF FILTERS IN INSTRUMENT AIR LINE COMPLETE B-096 INSTALLATION OF ISOLATION VALVE UPSTREAM 0F CV-4027 COMPLETE B-097 REPLACEMENT OF VIP-5 WITH MOTOR OPERATED VALVE COMPLETE B-098 REVISIONS TO 125-VOLT DC DRAWINGS COMPLETE B-099 EQUIPMENT CLASSIFICATION - RPS COMPONENTS COMPLETE BN-100 VENDOR INTERFACE AND MANUALS COMPLETE B-101 POST MAINTENANCE TESTING - RPS COMPONENTS COMPLETE B-102 EQUIPMENT CLASSIFICATION - ALL SAFETY RELtTED EQUIPMENT COMPLETE B-103 POST MAINTENANCE TESTING - ALL SAFETY RELATED EQUIPMENT COMPLETE B-104 CORE SPRAY PUMP SUCTION STRAINER BLOCKAGE COMPLETE (Replaced by B-104A)
B-104A CORE SPRAY PUMP SUCTION STRAINER BLOCKAGE COMPLETE B-105 REACTOR DEPRESSURIZATION SYSTEM HANGER REPLACEMENT COMPLETE d
B-106 REMOVE TURBINE GRATING COMPLETE
8.c S 1071 FLOOD ANNUNCIATION-CANCELED B-108'
-- MAIN STEAM LINE DRAIN ISOLATION COMPLETE BACKUP H'IGH RANGE STACK MONITOR
- COMPLETE
' BN-109=
B-110 LIGHTNING PROTECTION COMPLETE B-111 REFLACEWcNT-0F NEUTRON-MONITORING INSTRUMENTATION COMPLETE-
- A-112 ALTERNATE ROD ~ INJECTION CANCELED B-113' RELIEF VALVE-FAILURES INVESTIGATION COMPLETE B-114' RECIRCULATION PUMP ROOM LIGHTING >
COMPLETE
- B-115-CONDENSER MAKEUP WATER / CORE SPRAY INVESTIGATION COMPLETE B-IISA-ALTERNATE SOURCE OF MAKEUP TO CONDENSER HOTWELL CANCELED B-116-CLEANUP-DEMIN PIT ~ ACCESS HANDRAIL COMPLETE-B-ll7=
-REPLACE DIESEL FIRE PUMP-ENGINE COMPLETE B-ll8 UNDERWATER-FILTERING SYSTEM FOR SPENT FUEL POOL COMPLETE B-119' ACID SYSTEM MODIFICATIONS TO ELIMINATE PIPING CORROSION COMPLETE B-120 ACCESS TO RECIRC PUMP ROOM HEAT SENSORS-COMPLETE B-121 --
PROVIDE ENGINEERING SUPPORT:FOR CRD REPAIRS COMPLETE B-122
. REPLACE STATION BATTERY-COMPLETE
- B-123 REPLACE CONTROL ROOM RECORDERS.
COMPLETE-i i
BN-124-VITAL AREA UPGRADE COMPLETE-BN-125 CCTV UPGRADE COMPLETE B-126 STATION' AIR COMPRESSORS COMPLETE j
B-126A:
STATION AIR' SYSTEM UPGRADE COMPLETE B-127 REPLACE INSTRUMENT AIR DRYER ~
COMPLETE'
. B-1281
' REPLACEMENT ~0F CABLE IN RECIRC PUMP ~ ROOM COMPLETE i
- B-129-
-REWIRE CRD ACCUMULATOR PRESSURE SWITCH & LEAK COMPLETE DETECTOR SCHEMES BN-130' EVALUATION OF INSTRUMENT-AIR _ SYSTEM PER GENERIC COMPLETE LETTER 88-14
- BN-130A' INSTALL INSTRUMENT AIR FILTERING COMPLETE B-131-DIESEL GENERATOR RELIABILITY PROGRAM COMPLETE I
A-132 SIMULATOR FACILITY PLANT COMPLETE B-133-SHUTDOWN COOLING HEAT EXCHANGER TUBING REPLACEMENT CANCELED B-134 RELIEF VALVE TEST STAND COMPLETE B-135 REACTOR RECIRCULATION PUNP VIBRATION MONITORING CANCELED B-136 PROVIDE REPLACEMENT VALVE FOR FEEDWATER REGULATOR COMPLETE BN-137 INDIVIDUAL PLANT EXAM (IPE) PROGRAM - GENERIC COMPLETE LETTER 88-20 BN-138 MOV PROGRAM - GENERIC LETTER 89-10 COMPLETE BN-139 OPEN CYCLE COOLING SYSTEM PROGRAM - GENERIC COMPLETE LETTER 89-13 B-140 GENERATOR SYNCHRONIZING RELAY INSTALLATION CANCELED B-141 BREAKER C0 ORDINATION ANALYSIS MODIFICATIONS COMPLETE B-142 EDG TIME DELAY OVERCURRENT RELAYS COMPLETE B-143 PUMP FLOW METER INSTALLATION FOR SECTION XI COMPLETE B-144 REPLACE TR-9623 AND ASSOCIATED RTDs COMPLETE B-145 GENERAL ELECTRIC HFA RELAYS COMPLETE B-146 REPLACE / MODIFY BREAKER PANELB0ARD 2P COMPLETE B-147 RESOLVE EXISTING CORROSION /N0DULES IN FPS COMPLETE B-148 FEEDWATER TEST STAND REPLACEMENT COMPLETE B-149 M0-7050 AND N0-7067 ACCESS CANCELED B-150 REVIEW CRD SYSTEM COMPLETE B-151 UPGRADE REACTOR BUILDING CRANE BRAKES COMPLETE B-152 BREAKER REPLACEMENT STRATEGY COMPLETE B-153 HEA 51 TYPE AUXILIARY RELAY REPLACEMENT COMPLETE B-154 REPLACEMENT OF LIMITORQUE SMA OPERATORS COMPLETE B-155 SCREENHOUSE INTAKE B10F00 LING COMPLETE B-156 PS RE07 A'THROUGH D REPLACEMENT CANCELED B-157 CONTAINMENT PIPEWAY COOLER EFFICIENCY / MAINTAINABILITY COMPLETE l
1 B-158 MAKEUP DEMIN REPLACEMENT COMPLETE B-159 M0-7070/VPI-303 SPOOL PIECE MONITOR & VENTING COMPLETE.
.4 B-160 HAND TRIP SOLEN 0ID (HTS) IMPROVEMENT COMPLETE B-161 CRD PUMP RELIEF VALVE LEAKAGE CANCELED-B-162-LOADING DOCK CRANE (HOIST)
COMPLETE B-163 VP-301 & 302 AND VPI-304 TEST METHOD CHANGE CANCELED B-164 CONDENSATE STORAGE TANK SAMPLING LOCATION CHANGE COMPLETE B-165 PM PROGRAM REVIEW AND UPGRADE COMPLETE B-166 M0-7061 MODIFICATION TO ADDRESS PRESSURE LOCKING COMPLETE l
B-167 TURBINE REPAIR COMPLETE B-168 REPLACE CV-4040 AND CV-4114 COMPLETE o
B-169 REPLACE TR-IA66 COMPLETE B-170 MODIFY RWS PIPING COMPLETE B-171 REPLACE M0/V0P-7066 COMPLETE B-172 CONTAINMENT C0ATINGS COMPLETE B-173 REPLACE EFP PANEL COMPLETE B-174 S0LEN0ID VALVE REPLACEMENT PROGRAM COMPLETE BN-175 REACTOR VESSEL MARGIN ANALYSIS COMPLETE B-176 EDG COOLING WATER ENHANCEMENT COMPLETE B-177 HIGH INTEGRITY CONTAINER (HIC) STORAGE FACILITY-COMPLETE A-178 MAINTENANCE RULE IMPLEMENTATION COMPLETE B-179 CORRECTIVE ACTION SYSTEM IMPROVEMENT COMPLETE B-180 WORK CONTROL CENTER COMPLETE B-181 TRANSFER CASK OVERHAUL COMPLETE A-182 VEHICLE BARRIERd
-COMPLETE B-183 CRD SYSTEM PERFORMANCE IMPROVEMENTS CANCELED B-184 TURBINE IMPROVEMENT PROGRAM CANCELED
. B-185 RGEM FLOW IMPROVEMENTS CANCELED B-186 PROCESSING RESINS / LOW LEVEL RAD WAS1E SHIPMENTS COMPLETE l
B-187 AIR OPERATED VALVE (A0V) PILOT PROGRAM CANCELED-B-188 REMOVAL & DISPOSAL OF SPENT FUEL POOL STORED ITEMS CANCELED
,-----,,---------..---,--,--,--,-,---------,--r-,-,----,----------------m-,----------------------r-k-
'4 B 189 ALTERNATE BORON INJECTION SYSTEM IMPROVEMENTS CANCELED B-190
- - P.EACTOR DECK CONCRETE REPAIRS COMPLETE B-191 ON-LINE CONDENSER TUBE PLUGGING CANCELED B 192 RESIN SLUICING LINE REPLACEMENT COMPLETE B-193 RELOCATE EDG VOLTAGE REGULATOR CANCELED B-194 STATION POWER SYSTEM LOAD BALANCING CANCELED BN-195 -
UFHSR CONFORMANCE REVIEW PROJECT CANCELED BN-196 DEMINERALIZED WATER SYSTEM OVERPRESSUPF PROTECTION CANCELED B-197=
CRD SCRAM DUMP HEADER DOSE REDUCTION CANCELED B-198 125 VDC DISTRIBUTION PANEL (D02) REPLACEMENT CANCELED l
l i
1
_