l I

MEMORANDUM FOR:

Dan Gillen, Section Leader Remedial Action Section Uranium Recovery Branch FROM:

Daniel S. Rom, Construction Review Team Leader DATE:

June 10, 1997

SUBJECT:

Construction Review Plans for Grand Junction and Rifle UMTRA Project Sites INSPECTION DATES:

August 4 and 5, 1993 INSPECTION PLANS:

Attached ADVANCE COPY

/

9709040308 970826 PDR F01A WEBB97-105 PDR J

s, OH-SITE CONSTRUCTION REVIEW PLAN GRAND JUNCTION UMTRA PROJECT SITE, 8-4-93 CONTACT:

Chuck Cormier, DOE Site Manager 505-845-4039 DATE:

August 4, 1993 (Announced)

TEAM MEMBERS, ASSIGNMENTS:

Daniel Rom - Geotechnical Engineering Ted Johnson - Surf ace Water / Erosion Protection PURPOSE:

Routine on-site review of construction operations; Observation of oversize rock in response to PID

  1. 05-S-47; observation of floodplain area in response to request for supplemental standards SCOPEt I.

Chenev Dinoosal Site A.

Meet C. Cormier (DOE) at Of fice @ 8 : 00 AM.

Discuss draft PID regarding rock shape problems and travel to site.

B.

Observe rock produced and stockpiled at Cheney C.

Observe placement and compaction of tailings if possible D.

Observe density testing if possible E.

Take photographs of open cell trea.

Find out how long the cell will remain open.

F.

Observe on-site laboratory facility G.

Conduct informal interviews with personnel II.

Grand Junction Processino Site A.

Observe operations at processing site B.

Observe wetlands area in Colorado River floodplain; verify approximate extent of the wetland area.

Observe location of 30,000 cy scheduled for excavation at Colorado River, i

J

..=

s, f

III.

MK_ Grand Junction Office A.

Review written records D.

Discuss the number of vicinity properties, volume of material to be remediated, and schedule.

C.

Discuss results of any recent diffusion coefficient or moisture measurements for the radon barrier material.

D.

Conduct informal interviews with personnel E.

Conduct Exit Interview CONSTRUCTION REVIEW SCHEDULE AND ROUTINE:

Entrance meeting:

8:00 A.M.,

August 4, 1993

. Exit Meeting:

3:00 P.M.,

August 4, 1993 Normal hours tentatively 8:00 A.M.

- 4:00 P.M.

Motel:

Grand Junction Holiday Inn Confirmation #68850202 (Rom)

  1. 68846506 (Johnson) 303 243-6790 Government rate $41 Signature:

Date:

Team Leader / Reviewer Approval:

Date:

Section Leader J

s.

/

OW-SITE CONSTRUCTION REVIEW 1rLAN RIFLE UNTRA PROJECT SITE, 8-5-93 j

)

CONTACT:

Sharon Arp,' DOE Site Manager i

FTS 8-505-845-5668 DATE:

August 5, 1993 (Announced)

TEAM MEMBER, ASSIGNMENTS:

Daniel Rom - Geotechnical Engineering PURPOSE:

Routine observation of construction operations; observation of hauling and placement of tailings, construction records review SCOPE:

I.

New Rifle Processina Site A.

Meet S. Arp (DOE) at Project Office a 8:00 AM.

Discuss construction progress and any other issues pertaining to current on-site activities.

B.

Observe excavation operations at processing site, if any.

C.

Observe any wetlands which DOE proposes to remain unremediated.

II.

Old Rifle Processino Site A.

A drive-by will be conducted at Old Rifle.

It is our understanding that no work is underway at this site.

II.

Estes Gulch Discosal Site A.

Review in detail records of construction activity and infiltration testing.

B.

Observe testing which may be underway, such as sand-cone density test.

C.

Conduct informal interviews with personnel D.

Conduct Exit-Interview III.

MK Rifle Office A.

Review written' records B.

. Conduct informal-interviews with personnel

7 e

dEVIEW SCilEDULE AND ROUTINE:

Entrance meeting:

8:00 A.M.,

August 5, 1993 Exit Meeting:

4:00 P.M.,

August 5, 1993 Normal hours:

tentatively 8:00 A.M.

- 4:00 P.M.

Motel:

Grand Junction Holiday Inn Confirmation #68850202 (Rom)

  1. 68846506 (Johnson) 303-243-6790 Government rate $41 Signature:

Date:

Team Leader /Ruviewer Approval:

Date: