Forwards Insp Repts 50-321/98-01 & 50-366/98-01 on 980208-0321 & NOV Re Failure to Conduct Adequate Surveys & to Follow Radiation Protection Procedures.One Violation Being Considered for Escalated Enforcement Action
ML20217N088
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/21/1998
From: Plisco L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Sumner H
SOUTHERN NUCLEAR OPERATING CO.
Shared Package
ML20217N092 List:
References
50-321-98-01, 50-321-98-1, 50-366-98-01, 50-366-98-1, EA-98-209, NUDOCS 9805050215
Download: ML20217N088 (6)


See also: IR 05000321/1998001

Text

- _ _ - _ - _ - _ - - - _ - _ - - - - - - - - - - - - - - - - -

, .

April 21, 1998

EA-98-209

Southern Nuclear Operating Company. Inc.

ATTN: Mr. H. L. Sumner. Jr.

Vice President. Hatch Plant

Nuclear Operations

P.O. Box 1295

Birmingham. AL 35201

SUBJECT: NRC INTEGRATED INSPECTION REPORT 50-321/98-01. 50-366/98-01 AND

NOTICE OF VIOLATION

Dear Mr. Sumner:

On March 21. 1998, the NRC comaleted an inspection at your Hatch facility.

The enclosed report presents tie results of that inspection.

During the six-week period covered by this inspection report, your conduct of

activities at the Hatch facility was generally characterized by safety-

conscious operations, sound engineering and maintenance practices and careful

radiological work controls. However, violations of NRC requirements were

identi fied.

The violations are cited in the enclosed Notice of Violation (Notice), and the

circumstances surrounding the violations are described in detail in the

enclosed report. We are concerned about your staff's failure to conduct

adequate surveys and to follow radiation protection procedures which could

result inadvertent and unnecessary personnel exposure.

In addition. failure to follow maintenance procedures resulted in maintenance

being performed which was not authorized by a maintenance work order and was

done outside of the approved clearance boundary, similar to an instance

identified and documented in Inspection Report 50-321. 366/97-02. Repetitive

violations are addressed in the NRC's " Statement of Policy and Procedure for

NRC Enforcement Actions. " (Enforcement Policy). NUREG-1600.Section IV.B.

The Enforcement Policy allows the severity level of a violation to be

increased if the violation can be considered repetitive. For example, a

Severity Level IV violation could be increased to Severity Level III with the

attending escalated enforcement action. However. in this case, we have

decided not to increase the severity level of this violation based on the

safety significance of the violation and your overall satisfactory performance

in this area.

.

In addition. an apparent violation was identified and considered for escalated

enforcement action in accordance with the ~ General Statement of Policy and l

Procedures for NRC Enforcement Actions" (Enforcement Policy). NUREG-1600. The

apparent violation involved your identification of uninstalled temperature

.>n . , ,

l

9805050215 990421

PDR ADOCK 05000321

G PDR

<176 I

-_-___-__-_-__ _-__------

. .

SNC 2

switches of the "A" and "B" Main Control Room Environmental Control (MCREC)

system which left a hole of approximately one half inch diameter in each

filter train, which could have allowed unfiltered bypass flow to enter the

main control room. This could have resulted in control room personnel

receiving a thyroid iodine dose in excess of 30 rem during and following a

design basis accident. This apparent violation will be addressed in a

separate correspondence.

Please note that you are required to respond to this letter and should follow

the instructions specified in the enclosed Notice when preparing your

response. The NRC will use your response. in part, to determine whether

further enforcement action is necessary to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice." a copy of

this letter, its enclosures, and your response will be placed in the NRC

Public Doca.?ent Room (PDR).

Sincerely.

(Original signed by

Loren R. Plisco)

Lorea R. P1isco. Director

Division of Reactor Projects

Docket Nos.. 50-321 and 50-366

License Nos. DPR-57 and NPF-5

Enclosures:

1. Notice of Violation

2. NRC Inspection Report 50-321/98-01

and 50-366/98-01

cc w/encls:

J. D. Woodard

Executive Vice President

Southern Nuclear Operating Company. Inc.

P. O. Box 1295

Birmingham. AL 35201-1295

P. H. Wells

General Manager. Plant Hatch

Southern Nuclear Operating Company. Inc.

U. S. Highway 1 North

P. O. Box 2010

Baxley, GA 31515

cc w/encls cont'd: (See Page 3)

_

_ __- __ - _ _ _ _ - _- -- - - - -- -

. .

SNC 3

cc w/encls: Continued

D. M. Crowe

Manager Licensing - Hatch

Southern Nuclear Operating Company. Inc.

P. O. Box 1295

Birmingham. AL 35201-1295

Ernest L. Blake. Esq.

Shaw Pittman. Potts and

Trowbridge

2300 N Street. NW

Washington, D. C. 20037

Office of Planning and Budget

Room 610

270 Washington Street. SW

Atlanta. GA 30334

Director

Department of Natural Resources

205 Butler Street. SE. Suite 1252

Atlanta GA 30334

Mar,ager Radioactive Materials Program

Department of Natural Resources

4244 International Parkway

Suite 114

Atlanta GA 30354

Chairman

Appling County Commissioners

County Courthouse

Baxley. GA 31513

Program Manager

Fossil & Nuclear Operations

Oglethorpe Power Corporation

2100 E. Exchange Place

Tucker. GA 30085-1349

Charles A. Patrizia. Esq.

Paul. Hastings. Janofsky & Walker

10th Floor

1299 Pennsylvania Avenue

Washington, D. C. 20004-9500

cc w/encls cont'd: (See Page 4)

_ _ _ _ _

. _ - _ - - _ - - - _ - - - - - - - - - - - - - - - - - - - - - - - - - -

. .

SNC 4

cc w/encls: Continued

Senior Engineer - Power Supply

Municipal Electric Authority

of Georgia

1470 Riveredge Parkway NW

Atlanta, GA 30328-4684

Distribution w/encls:

P. H. Skinner RIl

R. P. Carrion. RII

W. P. Kleinsorge. RII

M. E. Ernstes. RII

L. Olshan. NRR

PUBLIC

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

11030 Hatch Parkway North

Baxley, GA 31513

  • SEE PREVIOUS CONCURRENCE

OFFICE RII:DRP Ril:DAP Ril:DRP Ril:DRP Ril:DRS All:DRS Ril:DRS

SIGNATLNtE

NAfE RPCarrion:da*

} wr

PH 51 Fir 1 BEHolWuvi" JACE- Jy- i

WPKleinsorge" GRWisamen* GBKuzo*

DATE 4/ /95 4/ 9 g /95 4/ /95 4/ /95 4/ /95 4/ /95 4/ /95

we'T r YE5 NO YES NO YES NO YES NO YES NO YES NO YES NO

OFFICE Ril:EICS

SIGNATURE

IWE AT5oland"

DATE 4/ /95 4/ /95 4/ /95 4/ /95 4/ /95 4/ /95 4/ /95

we's t YL5 NO YLE NO YES NO YES NO YES NO YE5 NO YE5 NO

l OF F ICI AL RECatD CDPY DOCLsqENT NAfE: G:\ HATCH \H180111R.41/

_ _ _ _ _ _

.

' *

,

.

SNC 4

<

Distribution w/encls:

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

11030 Hatch Parkway North

Baxley, GA 31513

m k

0FFICE Ell:DRP Ell:DRP Ril:DRP Ril q S, ,

Ril:DRS RII:DRS p gty g g '

g p(_

_

SIGME j gyg pg gg Qp p\vg g

IWWE RPCarrian:s5ta BLHolbrook JACanady nPN}bip GRWiseman GBKuzo ATBoland '

'

DATE 4/ y /95 4/ /95 4/ /95 y 4/ # 795 4 G D /95 4Q/ /95 4 g y /95

wrv i Mj No YES 11 0 YES 11 0 -7' YES 11 0 (VES j 11 0 ( YES 11 0 (YES i NO

"

-

0FFTcITL RECORD COPY D0QJIENT IWWE: G:\llATCM\M180111R.41/ \/

'

I

04-20-1998 08:39m PLANT HATCH 1 912 367 6297 P.01

Distribution w/encls:

NRC Resident Inspector

U.S. Nuclear Regulatory Commission

11030 Hatch Parkway North

Baxley. GA 31513

cwmou roau se ci-m _

FAX TRANSMITTAL * * aae== * l

'"

 ?> , C a e r c o n

t'***

A&ch

boeu w g x--

, , ,

r. ,

p THO 01.$17 7384 4099 901 C'bNC% W W ON$N

.

e

4

0FFICE RII DRP RII:0RP (ll:DRP R!!!CRS RII:DR$ Ril:6it5

5 3 "AT ** @/fAfs>47 dj.Mm

4flpt, RPCarrichgdka ULHolbf00k @ cam $y ( WPKLC)nsorge GRWiseman f.BKuzo ATBotand

4/ (./ /95 /yu 4/ /95

DATE 4/ /95 4/20 /95 s/LOy /WB 6/

Com us no us w us up us no us no us no us no

0FFICIAL RECORD COPY DOCVPIENT NAMf; Gr\MATCM\HT80111R.DFT

TOTAL P.01