Forwards Insp Rept 50-293/97-04 on 970505-23.No Violations Noted.Insp Was to Assess Licensee Engineering Effectiveness Through in-depth Review of Engineering Calculations as Well as Other Engineering Activities & Analyses
ML20217K862
Person / Time
Site: Pilgrim
Issue date: 08/07/1997
From: Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Boulette E
BOSTON EDISON CO.
Shared Package
ML20217K867 List:
References
50-293-97-04, 50-293-97-4, NUDOCS 9708180224
Download: ML20217K862 (3)


See also: IR 05000293/1997004

Text

'

.

,gs

-

,

August 7, 1997

E. Thomas Boulette, PhD

Senior Vice President Nuclear

Boston Edison Company

Pilgrim Nuclear Power Station

600 Rocky Hill Road

Plymouth, Massachusetts 02360 5599

SUBJECT:

NRC INSPECTION REPORT 50 293/97 04

Dear Dr. Boulette:

This letter refers to the inspection conducted by an inspection teamled by

Mr. S. K. Chaudhary of this office from May 5 23, 1997. The purpose of the inspection

was to determine if the activities authorized by the licensee were conducted safely, and in

accordance with NRC requirements. At the conclusion of the inspection, Mr. Chaudhary

discussed the findings of this inspection with Mr. Leon J. Olivier.

The objective of the inspection was to assess the licensee's engineering effectiveness

through an in depth review of engineering calculations as well as other engineering

activities and analyses. The inspection consisted of selective examination of design bases

documentation of the core spray system, as well as procedures and instructions,

representative documentation of operational tests and surveillances, and interview of

personnel.

Based on the results of this inspection, we conclude that the current design configuration

of the core spray system is consistent with the design basis and the license conditions;

and the operability of the system is assured through surveillances and functional testing.

We, however, noted weak interface between organizations involved in the modification

process of the ECCS strainer _ replacement process. Radiological engineering performance

was good in pursuing permanent shielding and other dose reduction initiatives in the

station. Regular interactions between RP/ALARA and civil engineering group regularly

occur to focus on these priorities. Notwithstanding, the more general radiological

-engineering approach to plant modifications was found to be weak in incorporation of

RP/ALARA group expertise during the engineering design phase of this modification. This

weakness resulted in high exposure costs for installation of ECCS strainer during the spring

1997 outage.

t

<

y bg l

)

g

"

9708190224 970807

PDR- ADOCK 05000293

g

PDR

h

.

.-

0

.,

E. Thomas Boulette, PhD

2

No reply to this letter is requested, and your continued cooperation with us is appreciated.

Sincerely,

ORIGINAL SIGNED BY:

William J. Lazarus, Chief

Civil, Mechanical and Materials

Engineering Branch

Division of Reactor Safety

Docket No. 50 293

Enclosure: NRC Inspection Report No. 50 293/97 04

cc w/ encl:

L. Olivier, Vice President Nuclear and Station Director

T. Sullivan, Plant Department Manager

N. Desmond, Regulatory Relations

D. Tarantino, Nuclear Information Manager

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts

The Honorable Therese Murray

The Honorable Joseph Gallitano

B. Abbanat, Department of Public Utilities

Chairman, Plymouth Board of Selectmen

Chairman, Duxbury Board of Selectmen

Chairman, Nuclear Matters Committee

Plymouth Civil Defense Director

P. Gromer, Massachusetts Secretary of Energy Resources

J. Miller, Senior Issues Manager

J. Fleming

A. Nogee, MASSPIRG

Office of the Commissioner, Massachusetts Department of Environmental O'Jality

Engineering

Office of the Attorney General, Commonwealth of Massachusetts

T. Rapone, Massachusetts Executivo Office of Public Safety

Chairman, Citizens Urging Responsible Energy

Commonwealth of Massachusetts, SLO Designee

_ _ _ _ _ - _ _ - - - .

..

,-

  • /

,,

.

E. Thomas Boulette, PhD

3

Distribution w/ encl:

Region i Docket Room (with concurrences)

PUBLIC

Nuclear Safety information Center (NSIC)

J. Wiggins, DRS

D. Screnci, PAO

NRC Resident inspector

W. Axelson, DRA

l

R. Conte, DRP

M. Conner, DRP

C. O'Daniell, DRP

DRS File

Distribution w/enci(VIA E MAIL):

P. Milano, NRR

A. Wang, NRit

W. Dean, OEDO

R. Correla, NRR

F. Talbot, NRR

DOCDESK

Inspection Program Branch, NRR (IPAS)

.

DOCUMENT f1AME: A:\\PIL9704. INS

n ,

.

, .e w.

at. me

m m. w.: c . copy witdut .it. chm.nt/.neion,.

. c , with .ii. chm.nii.ncio.ur.

u . No copy

OFFact

RuDR$

gg/ _

l

RUDRP

A

/l

RUCRs d jj

RuDRS

l

l-

swa

scn.uan.rv -

Mc.nt' //h/

W'* w ua V 4 k-

JW'oo**

ossn

ori n er

or ioy

yrqsr

y

ori ser

ori ter

'

omcat RecoRo copy

j