1 l
444 9
\\
UNITED STATES p
s j
NUCLEAR REGULATORY COMMISSION "2
WASHINGTON, D.C. 3066H1001
\\...../
l l
ENTERGY OPERATIONS. INC.
DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION. UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE l
Amendment No.140 License No. NPF-38 I
l 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Entergy Operations, Inc. (the licensee) dated i
November 18,1996, as supplemented by letter dated January 21,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; l
B.
The facility will operate in conformity with the application, the provisions of the l
Act, and the rules and regulations of the Commission; l
l C.
There is reasonable assurance (1) that the activities authorized by this amendment l
can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and l
security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
l 9804060093 900401 PDR ADOCK 05000302
. P.
PDR l
2-l 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-38 is hereby amended to read as follows:
4 l
(2)
Technical Specifications and Environmental Protection Plan l
l The Technical Specifications contained in Appendix A, as revised through i
Amendment No.140, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance to be implemented within 60 days.
FOR THE NUCLEAR REGULATORY COMMISSION 0hh 0
Chandu P. Patel, Project Manager l
Project Directorate IV-1 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical l
Specifications l
l Date of Issuance:
April 1, 1998 l
I l
L
AWACHMENT TO LICENSE AMENDMENT NO.140 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50 382 Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by Amendment number and contain vertical lines indicating the areas of change. The corresponding overleaf page is also provided to maintain document completeness.
REMOVE PAGE INSERT PAGE 3/4 4-35 3/4 4-35
l l.
l.
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS 4.4.8.3.1 For each SDC System suction line relief valve:
l l
a.
verify in the control room at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> that each valve in the suction l
path between the RCS and the SDC relief valve is open.
b.
verify each SDC relief valve is OPERABLE in accordance with TS 4.0.5.
l 4.4.8.3.2 With the RCS vented per ACTIONS a, b, or c, the RCS vent (s) and all va;ves in the vent path shall be verified to be open at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> *.
i' l
l s
l l.
l '
l l
- Except when the vent pathway is provided with a valve which is locked, sealed, or otherwise secured in the open position, then verify these valves open at least once per 31 days.
WATERFORD-UNIT 3 3/4 4-35 AMENDMENT No. 66,72,140