ML20217F350
| ML20217F350 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 03/25/1998 |
| From: | Kirsch D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Ray H SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20217F354 | List: |
| References | |
| 50-361-98-03, 50-361-98-3, 50-362-98-03, 50-362-98-3, NUDOCS 9803310372 | |
| Download: ML20217F350 (4) | |
See also: IR 05000361/1998003
Text
I
I
.f
3
[p2 Moog$
UNITED STATES
i
.t
NUCLEAR REGULATORY COMMISSION
.a fg
REGION IV
,
, , -
.
[
611 RYAN PLAZA DRIVE, SUITE 400
$9*****
,o
March 25, 1998
i
Harold B. Ray, Executive Vice President
Southern California Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674-0128
SUBJECT: NRC INSPECTION REPORT 50-361/98-0'3; 50-362/98-03 AND NOTICE OF
,
VIOLATION
>
Dear Mr. Ray:
From February 1 through March 14,1998, a routine, announced inspection was conducted at
your San Onofre Nuclear Generating Station, Units 2 &nd 3 reactor facilities. The enclosed
report presents th9 scope and results of that inspection.
During the 6-week period covered by this inspection, your conduct of activities at the
San Onofre facilities was generally characterized by safety-conscious operation, sound
engineering and maintenance practices, and careful radiological work controls.
Two violations of NRC requirements were identified during this inspection. These violations are
cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding the
y
violations are described in detailin the enclosed report. The NRC has concluded the
information regarding the reasons for the violations, the corrective actions taken and planned to
correct the violations and prevent recurrences are already adequately addressed on the docket
in the enclosed report. Therefore, you are not required to respond to this letter unless the
description therein does not accurately reflect your corrective actions or your position. In that
case, or if you choose to provide additional information, you should follow the instructions
'
specified in the enclosed Notice.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response, if any, will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
g
Dennis F. Ki ch, Chief
Reactor Project Branch F
Division of Reactor Projects
9903310372 980325
ADOCK 05000361
0
_
%
1
Southern California Edison Co.
-2-
Docket Nos.: 50-361
50-362
License Nos.: NPF-10
NPF-15
Enclosures:
2. NRC Inspection Report
50-361/98-03;50-362/98-03
'
cc w/ enclosures:
Chairman, Board of Supervisors
County of San Diego
1600 Pacific Highway, Room 335
San Diego, California 92101
Alan R. Watts, Esq.
Woodruff, Spradlin & Smart
701 S. Parker St. Suite 7000
Orange, California 92868-4720
Sherwin Harris, Resource Project Manager
Public Utilities Department
City of Riverside
3900 Main Street
i
Riverside, California 92522
R. W. Krieger, Vice President
Southern California Edison Company
.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674-0128
!
Stephen A. Woods, Senior Health Physicist
i
Division of Drinking Water and
i
Environmental Management
'
Nuclear Emergency Response Program
Califomia Department of Health Services
P.O. Box 942732, M/S 396
Sacramento, California 94334-7320
,
i
t
Southern Califomia Edison Co.
-3-
L
Mr. Gary D. Cotton, Sr. Vice President
Energy Supply
l
San Diego Gas & Electric Company
P. O. Box 1831
San Diego, California 92112-4150
Mr. Steve Hsu
Radiological Health Branch
State Department of Health Services
P.O. Box 942732
Sacramento, California 94234
Mayor
City of San Clemente
100 Avenida Presidio
San Clemente, Califomia 92672
l
l
Mr. Truman Burns \\Mr. Robert Kinosian
l
Califomia Public Utilities Commission
1
505 Van Ness, Rm. 4102
San Francisco, Califomia 94102
. -
%
!
!
!
s
s
Southern California Edison Co.
-4-
E-Mail report to T. Frye (TJF)
,
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
DMMU
bec distrib. by RIV:
Regional Administrator
Resident inspector
DRP Director
DRS-PSB
Branch Chief (DRP/F, WCFO)
MIS System
Senior Project inspector (DRP/F, WCFO)
RIV File
Branch Chief (DRP/TSS)
WCFO File
1
l
\\
\\
1
j
r
DOCUMENT NAME: R:\\_SO23\\SO803RP.JAS
To receive copy of document, indicate in box:"C" = Cop:r wanout enclosures "E" = Copy with enclosures "N" = No copy
l
RIV:RI:D_RP/F
Rl:DRP/F ,
PE:DRP/F
SRI:DRP/F
C:DRS/PSB
C:DRP/F l
j
l
JJRuss'd h
JGKramerff .
DGAcker) dest
JASloar#f&BMurrayfM DFKirschM
03A98'"
03ff98
g/n/h[
03R//98 h)6
03ff8
l
03)(98
'
OFFICIAL RECORD COPY
f
'
g.
n on85
-
/t O
I
.