ML20217D150
| ML20217D150 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/15/1991 |
| From: | Collins S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20217D153 | List: |
| References | |
| NUDOCS 9107220077 | |
| Download: ML20217D150 (3) | |
See also: IR 05000382/1991018
Text
-
-
.
-
-
--
-
_ _ . -
i
,
'
JUL I 51991
Docket No.:
50-382/91-18
i
License No.:
Entergy Operations, Inc.
ATTN:
R. P. Barkhurst, Vice President
Operations, Waterford
P.O. Box B
K111ona, Louisiana 70066
Gentlemen:
SUBJECT:
NRC INSPECTION REPORT NO. 50-382/91-18
lhis refers to the inspection conducted by Messrs. W. F. Smith and S. D. Butler
of this of fice during the period May 14 through June 17, 1991.
The inspection
included a review of activities authorized for your Waterford Steam Electric
Station, Unit 3, facility. At the conclusion of the inspection, the findings
were discussed with those members of your staff identified in the enclosed
report.
Areas examined during the inspection are identified in the report.
The areas
included plant status, followup, onsite response to events, monthly maintenance
observation, bironthly surveillance observation, and operational safety
verification. Within these areas, the inspection consisted of selective
examination of procedures and representative records, interviews with personnel,
and observations of the activities in progress.
Within the scope of the inspection, no violations or deviations were
identified.
Three unresolved items are identified in the enclosed inspection report.
The first unresolved item (paragraph 3.2.1) will require further review by
Region IV radiation protection specialists to determine if the actions taken by
your staff were adequate in response to a potential radiation exposure in
excess of 10 CFR 20 limits. The second unresolved item (paragraph 4.1)
involves operators voluntarily entering Technical Specification 3.0.3 by
isolating the safety injection tanks to expedite depressurization of the
reactor coolant system during the reactor coolant system leakage event. We
have contacted the Office of Nuclear Reactor Regulation for assistance
ccncerning the proper use of Technical Specification 3.0.3 and 10 CFR 50.54(x)
during such eve ts. The third unresolved item (paragraph 5.1) will require
further review to determine whether there was a breakdown in the assurance of
quality of spare parts for the turbine driven emergency feedwater pump,
l
- RIV:RI
- RIV: SRI
- C:0RP/A
C:DRSS
D RP
SDButler
WFSmith
TFWesterman
BMurray
JCoklins
/ /91
/ /91
/ /91
3 / /91
1/s5/91
- previously concurred
/
9i07220077 910715
FDR
ADOCK 05000302
I ].
I
O
l
-
-
---.
-
- -
--.
-
--
_ - - _
.
Entergy Operations, Inc.
-2-
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 3 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Originrd Signed By:
Samuel J. Comra
Samuel J. Collins, Director
Division of Reactor Projects
,
Enclosure:
'
Appendix A - NRC Inspection Report
50-382/91-18
cc w/ enclosure:
Entergy Operations, Inc.
ATTN:
Donald C. Hintz, Executive Vice
President & Chief Operating Officer
P.O. Box 31995
Jackson, Mississippi 39286
Entergy Operations, Inc.
ATTN: Gerald W. Muench, Vice President
Operations Support
P.O. Box 31995
Jackson, Mississippi 39286
Wise, Carter, Child & Caraway
l-
-ATTN:
Robert B. McGehee, Esq.
P.O. Box 651
Jackson, Mississippi '39205
I
.Entergy Operations, Inc.
ATTN:
J. k. McGaha, Jr. , General
Man 1ger Plant Operations
P.O. Box B
'
K111ona,_ Louisiana 70066
i
Entergy Operations, Inc.
l
ATTN:
J. G. Dewease, Senior Vice
i
President, Planning & Assurance
i
P.O. Box 31995
-Jackson, Mississippi 39286-1995
o
'
.
. .
.
. - - .
, _ _ _ . _
-
m
,
.
Entergy Operations, Inc.
-3-
Entergy Operations, Inc.
ATIN:
L. W. Laughlin, Site
Licensing Support Supervisor
P.O. Box B
K111ona, Louisiana 70066
Shaw, Pittman, Potts & Trowbridge
ATTN:
Mr. E. Blake
2300 N Street, NW
Washington, D.C.
20037
r,hr.i rma n
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
Entergy Operations, Inc.
ATTN:
R. F. Burski, Director
Nuclear Safety
317 Baronne Street
New Orleans, Louisiana 70112
Glenn Miller, Administrator
Radiation Protection Division
P.O. Box 82135
Baton Rouge, Louisiana 70884-2135
President, Parish Council
St. Charles Parish
Hahnville, Louisiana 70057
Mr. William A. Cross
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland 20814
Winston & Strawn
ATTN:
Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, O.C.
20005-3502
bec to DMB (IE01)
bec distrib. by RIV:
- R. D. Martin
- Resident inspector
- Section Chief (DRP/A)
- DRP
- DRSS-RPEPS
- MIS System
- Project Engineer (DRP/A)
- RSTL Operator
- RIV File
- DRS
Lisa Shea, RM/ALF
- w/766
-