ML20217B229

From kanterella
Jump to navigation Jump to search
Notification of Significant Meeting W/Util on 910304 to Allow Licensee to Make Presentation on Self Assessment of Performance
ML20217B229
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 02/22/1991
From: Crlenjak R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 9103120039
Download: ML20217B229 (2)


Text

-

e

-3

,er-r (. '~,Ef l ft y - ,b $ ! . ; d ( (di s 4 FEB 2 2 1991 NOTICE OF SIGNIFICANT MEETING Name of Licensee: Florida Power Corporation Name of Facility: Crystal River Docket Number: 50-302 Date and Time of Meeting: March 4, 1991, at 10:00 a.m.

Location of Meeting: NRC Region II Office, Atlanta, Georgia RII Cognizant Division: Division of Reactor Projects Purpose of-Meeting: To allow the licensee to make a presentation on self-assessment of performance.

NRC Attetidees:

S. D. Ebneter, Regional Administrator, Region II, (RII)

J. Milhoan, Deputy Regional Administrator, RII L. Reyes, Director, Division of. Reactor Projects (DRP), RII E. :W. Merschoff, Deputy Director, DRP, RII A. F. Gibson, Director, Divisior, of Reactor Safety, RII J. P.- Stohr, Directo", Division of Radiation Saf: '.y and Safeguards, RII H. N. Berkow, Directo Project Directorate 11-2, Office of Nuclear Reactor Regulation (NRR) ,

M. V. Sinkule,--Chief, Reactor Projects Branch 2, DRP, RII R. V. Crlenjak, Chief, Reactor Projects Section 28, DRP, RII R. P. Schin, Project Engineer, Reactor Projects Section 2B, DRP, RII P. Holmes-Ray, Senior Resident Inspector, Crystal River, DRP, RII H. Silver, Project Manager, NRR Licensee Attendees:

P.. M. Beard, Senior Vice President, Nuclear Operations G. L.- Boldt, Vice' President, Nuclear Production B. J. Hickle, Director, Quality Programs P. R. languay, Director, Nuclear Operations Engineering and Projects S. G. Johnson,. Manager, Site Nuclear Services J. Alberdi, Manager, Nuclear Plant Operations V. R. Roppel,' Manager, Nuclear Plant Maintenance L. C. . Kelley, Director, Huclear Operations Training S. L. Robinson, Superintendent, Nuclear Chemistry and Radiation Protection G. A. Longhauser, Superintendent, Nuclear Security 9103120039 910222 .

\

DR ADocK05 cog 2 T,em/

1 Notice of Significant Meeting 2 NOTE: Attendance by NRC personnel at the NRC/ Licensee meeting should be made '

known by 4:00 p.m. , February 28, 1991, via telephone call to R. P. Schin, FTS: 841-5561.

ORIGINAL StGNED BY Approved by: IMRVIN V. SINKULE (hh Richard V. Crlenjak, Ch%f Projects Section 2B Division of Reactor Projects Distribution: ,

J. Sniezek, Deputy Executive Director for Operations J. Lieberman, Director, Office of Enforcement L. J. Chandler, Assistant General Counsel for Hearings and Enforcement, OGC J. G. Partlow, Associate Director Projects, NRR H. L. Thompson, Jr., Deputy Executive Director for Nuclear Materials Safety, Safeguards and Operations Support T. E. Murley, Director, Office of Nuclear Reactor Regulation S. A.'Varga, Director, Division of Reactor Projects I/II, NRR H. N. Berkow, Director, Project Directorate 11-2, NRR J. F. Wechselberger, Regional Coordinator, ED0 H. Silver, Project Manager, NRR bec: Regional Administrator Deputy Regional Administrator Division Directors A)1NRCAttendees PUocument Ccntrol De;k

, R.-Crlenjak,RII H. Silver, RI!

NRC Resident inspector U.S. Nuclear Regulatory Commission 6745 N. Tallahassee Rd.

Crystal River, FL 32629 RI 40RP RI DRP Rll:DRP RII:DRS RII; SS 7 m >  %.uj9 R chin R len MSinkule A son PSt ir 02/v/91 02/vs/jak 91 02/fr/91 02/// 91 02/4/91

- . v.