ML20217A725
| ML20217A725 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/13/1990 |
| From: | Matthews D Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20217A730 | List: |
| References | |
| NUDOCS 9011210256 | |
| Download: ML20217A725 (7) | |
Text
_
Ar u,,.
'k UNITED sT ATEs
[
)
g NUCLEAR REGULATORY COMMISSION 5-1f WASHING TON, D. C. 20555 e
%....+/
+
DUKE POWER COMPANY NORTH CAROLINA ELECTRIC NEMBERSHIP CORPORATION
_SALUDA RIVER ELECTRIC COOPERATIVE. INC.
DOCKET NO. 50-413 CATAWBA NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 79 License No. N)F-35 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment to the Catswba Nuclear Station, Unit 1 (the. facility) Facility Operating License No. NPF-35 filed by the Duke Power Company acting for itself, North Carolina Electric Membership) Corporation and Saluda River Electric Cooperative, Inc.,
(licensees dated March 11, 1988, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),
l and the Consnission's rules and regulations as set forth in 10 CFR l
Chapter I; S.
The facility will operate in conformity with the application, the provisions.of the Act, and the rules and, regulations of the Comission; l,
C.
Thereisreasonableassurance(1)thattheactivitiesauthorizedby this amendment can be~ conducted without endangering the health and l
safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; l
l
-D.
The issuance of this amendment will not be inimical to the cosmon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
90112102569g%g3 PDR ADOCK O PNV P
'l q
i.
2 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-35 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amenonent No. 79, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto, are hereby incorporated into this license. Duke Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
F.R THE NUCLEAR REGULATORY COMMISSION David B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects-!/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance: November 13. 1990 4
a f
"*'%e t.
UNITED STATES y-
' 'in NUCLEAR REGULATORY COMMISSION g
,g WA$HINGTOrJ D, C.20555 g
y
- %,,,,, /
DUKE POWER COMPANY NORTH CAROLINA MUNICIPAL POWER AGENCY NO. 1 PIEDMONT MUNICIPAL POWER AGENCY DOCKET NO. 50-414 l
CATAWBA NUCLEAR STATION, UNIT 2 AMENDMENT TO FACIllTY OPERATING LICENSE Amendment No. 73 License No. NPF-52 1.
The Nuclear Regulatory Comission (the Commission) has found that:
A.
The application for amendment to the Catawba Nuclear S':ation, Unit 2 (the f acility) Facility Operating License No. NPF-52 flied by the
' Duke Power Company acting for itself, North Carolina Municipal Power Agency No. I and Piedmont Municipal Power Agency. (licensees) dated March 11, 1988, complies with the standaros and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the application, the provisions of the Act, and the rules and regulations of the 1
Commission; C.
There is reasonable assurance (1) that the activities authorized by-this amendment can be conducted without endangering the health and-
'o safety of the public, and (ii) that such activities will be i
conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Cwaission's regulations ano all applicable requirements have been satisfied.
s,
.,.y I
?.,
" 4 2.
Accordingly, the license is hereby anended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-52 is hereby i
amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendix A, at revised through Amendnent No. 73, and the Environmental Protection Plan contained in Appendix B, both of which are attachec hereto, are hereby incorporated into this license. Duke Power Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license ameridawnt is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION hm David B. Matthews, Director Prcject Directorate II-3 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation Attachnent:
. Technical Specification Changes Date of Issuance:
November 13, 1990 i
-1 Sg t
le,.
'. u -
ATTACHMENT TO LICENSE AMENDMENT NO. 79 e
FACILITY OPERATING LICENSE NO. NPF-35 g0CKET NO. 50-413 F
A!LD
}jlrICENSEAMENDMENTNO. 73 FAC1..if OPERATING LICENSE NO. NPF-52 DOCKET NO. 50-414 Replace the following ) ages of the Appendix "A' Technical Specifications with the enclosed pages.' T.1e revised page is identified by' Amendment number and contains a vertical.line indicating the area of change. The corresponding over-leaf page is also provided to maintain document completeness.
^~
Amended Page.
Overleaf Page 3/4 3 3/4 3-64 i
m i'
e M
E o
o t
r E-1
N L
- w. -
.w-1
~
-TABLE ~3.3-9
-.g
! REMOTE' SHUTDOWN MONITORING INSTRUMENTATION ~
- E MINIMUM-READOUT TOTAL NO.
CHANNELS E_ INSTRUMENT LOCATION-0F CHANNELS OPERABLE 7*
- 1. -
Reactor Trip' Breaker Indication-Reactor Trip 1/ trip breaker 1/ trip breaker Switchgear e=
2.
Reactor Coolant Loop A&B Hot leg.
Auxiliary Shutdown 2
1*
Temperature Control Panel-
- 3.
Reactor. Coolant Loop A&B Cold Auxiliary Shutdown 2
1*
Leg Temperature.
Control Panel 4.
' Pressurizer Pressure Auxiliary Shutdown 2
1 R
Control Panel Y
5.
Pressurizer Level Auxiliary Shutdown 2
1 Control Panel 6.
Steam Generator Pressure
- Auxiliary Shutdown 1/ steam generator 1/ steam generator Control Panel (s) or Auxiliary Feedwater Pump Turbine Control Panels N
.@M-7.
Steam Generator Level Auxiliary Shutdown 1/stea_. generator 1/ steam generator Control Penel(s) or Auxiliary Feedwater Pump Turbine Contivl yy Panels UE 8.
Auxiliary.Feedwater' Flow Rate Auxiliary Shutdown 1/ steam generator 1/ steam generator 22 Control Panel (s) or
- .'. E.
Auxiliary Feedwater Pump Turbine Control OO Panels
- Channel required to be OPERABLE.during operation from remote shutdown panel
~ ;..
- u...
[ J.
- =.3-y
'=
1. :--
r 3
- }..
~
E
. TABLE 4.3-6
~
3
. REMOTE SHUTDOWN MDNITORING INSTRUMEPTATION
~
g SURVEILLANCE REQUIREMrgTS CHANNEL CHANNEL-r
- c-INSTRUMENT CHECK-CALIBRATION 5
-d
~1 iReactor.. Trip Breaker Indication M
.N.A.
- e.
-: 2.
Reactor Coolant Loop A&B Hot Leg. Temperature M-R
~
3.
Reactor Coolant Loop'A&B Cold leg Temperature M.
R 4.
Pressurizer-Pressure M
R 5.
Pressurizer Level-M R
6.
Steam Generator Pressure M
R R
- ~
7.
Steam Generator Level M
R Y
T 8.
Auxiliary Feedwater Flow Rate M
R l
?
i e ?-
h'
..