ML20216F664

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs Figure 5.2-1 Re Synopsis Mods & Replacement Pages
ML20216F664
Person / Time
Site: North Carolina State University
Issue date: 09/10/1997
From:
North Carolina State University, RALEIGH, NC
To:
Shared Package
ML20216F657 List:
References
NUDOCS 9709120063
Download: ML20216F664 (4)


Text

. _ __ _ _ - _ . _ - . - _ . _ _ _ . _ .

L

  • Attachment A North Carolina State University PULSTAR Research Reactor Docket: 50-297 License No. R-120
Technical Specification Synopsis of Modifications and Replacement Pages NO"$E!

P SEN7 PDR

. NCSU PULSTAR Reactor Facility Docket: 50 297

  • License: R 120 Synopsis of Modifications-(1) Technical Specification Figure 5.21 - PULSTAR Reactor Site Map o Yarbrough Drive is changed to Stinson Drive:

o - East Broughton Drive is changed to Lampe Drive o- West Broughton Drive is changed to Broughton Drive (2) Technical Specification Section 6.7 The following changes are proposed for Amendment 12 where striked-out text represents deletions and red lined text represents additions:

-6.7.1 BeDortable Event For Reportable Events as defined by section 1.22 of these specifications, there shall be a report not later than the following work day by telephone to the Nuclear Regulatory Commission Operations Center and the Nuc!ccr Scgdtcry Commicin Region '! Regicnc! Admi;ict cterefollowed by a written report within 14 days that describes the' circumstances of the event.

6.7.2 Permanent Chances in Facility Oroanization Permanent changes in the facility organization involving either Level 1 or 2 personnel (refer to specification 6.1) shall require a written report within 30 days to the Nuclear Regulatory Commission Document Control Desk and the Nu&c 90g W ary Ccmmic2n 90gien !! Regicnc! Admidtrator.

6.7.3 Chanaes Associated with the Safety Analysis Reoort Significant changes in the transient or accident analysis as described in the Safety Analysis Report shall require a written report within 30 days to the Nuclear Regulatory Commission Document Control Desk and the Nuc!ccr 9096 tc y Com mic i n 90gica

!! Regicnc! AdmS!ctreter.

6.7.4 Annual Ooeratino Reoort An annual operating report is required to La submitted no later than August 31st of each year and will cover the period of July 1st through June 30th. The c-iginc!(ep6tl is transmitted to the Document Control Desk, Nuclear Regulatory Commission, Washingtonr-with c Ocpy trancmitted tc the Nuc!cc: Reg 6 cry Commicin Regica

'! Regicnc! Admitt:0 ct. The annual report shall contain as a minimum, the following information:

End of synopsis, replacement TS pages 41 and 56 follow:

)

1 l

t '

l NCSU PULSTAR l

Technical Specifications

  1. 0 t:;.

d'Il 3.,'$ ~ld',M CHAMBERLAIN DRIVEr $/.'.9M F.I. -

.g, r  :'

A R3_c: TAR REACTOR SmE AO

~~

?'.

l/'

OPERATIONS BOL.N W4 IES C:

y.t.

i.- 9

.' THS AREA OCCUPIED  !'

% BYJ.GARDNER t'

  • ? ARBORETUM h ".' ' '.! s

!e

.:1 e e0UNDARf (dNn daded lines)

, ..s . .fd :,

. .s _. _ . _ _ _ - - - - _ _ _____ _ - _ _  :. .,.

f,-)g-M. ---* N "_ __ _ , _ __ _f_-.M ._.f- i. _ " l j'[:'.

f  ;

l ADMNSTRATION AND LABORATORY SUILDING i l c.-

l ,,a ta - l t,"

l Ql ' ' ~l ml O

Hl y[- ,

- a,umeur

-~ noou AT I

l pn mscannot

gl lQ o - i s- ooem " ^ * " " ' " '

m

$! f ,

% ua m eo m aton l" W!

  • d. _
m. / --- b la l OPERATIONS l OUNDARY

'Y,1

'N l $..~'

.P. 'l .

l;la..

?5')g . .

lf,'b

! L ..:

SOUTH WING = l .,,t '

[.*.y s- d '.

v ll\.p-

'.,. :I

>*,t__,----,----_._

_ --- l . .u .

  • il.' .* , . ' .*.<.'!:'.~ b:.'. *. STIN SON DRIVE Y_M@D.'N.'d3:9$

. M l.l. !:'. .

Figure 5.2-1 PULSTAR Reactor Site Map September 10,1997 41 Amendment 12 J

4 -

NCSU PU!ATAR '

j Technical speciratiom _

6.7 f 1Renorting Requirements L

' 6.7,11 - Reoortshle Event--

For Reportable Events as defined by section 1.22 of these specifications, there : -

shall be a report not later than the following work day by telephone to the Nuclear Regulatory Commission Operations Center followed by a written report within 14 days that describes the circumstances of the event.

6.7.2. fsImanent Changes in Facility Organization -

Permanent changes in the facility organization involving either I.evel 1 or 2

personnel (refer to specification 6.1) shall require a written report within 30 days to the Nuclear Regulatory Commission Document Control Desk.

- 6.7.3' Channes Associated with the Safety Analysis Report Significant changes in the transient or accident analysis as described in the Safety Analysis Report shall require a written report within 30 days to the Nuclear

. Regulatory Commission Document Control Desk, 6.7.4 ~ Annual Ooerating Repor:

- An annual operating report is required to be submitted no later than August 31st of each year and will cover the period of July 1st through-June 30th. The report is transmitted to the Document Control Desk, Nuclear Regulatory Commission,

._ Washington. The annual report shall contain as a minimum, the following information:

a. A'brief narrative summary:
1. Operating experience including a summary of experiments performed.

- ii. . . Changes in performance characteristics related to reactor safety that occurred during the reporting period

lil. Results of surveillance, tests and inspections.

bi Tabulation of the energy output (in megawatt days) of the reactor, hours reactor was critical, and the cumulative total energy output since initial criticality. .

September 10,1997.

56 Amendment 12 l

~ ~

- . _ - _ _ _ _ _ _ - _ - _ - _ - _ _ _ _ _ _ _ - _ - _ _ _ _ . _-- J N