Forwards Requalification Exam Rept 50-302/OL-87-03 of Exam Administered on 870519-21
ML20216F645
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 06/22/1987
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
Shared Package
ML20216F649 List:
References
NUDOCS 8706300904
Download: ML20216F645 (2)


Text

- - _ _ _ _ _ _

June 22, 1987 Docket No. 50-302 Florida Power Corporation Mr. W. S. Wilgus Vice President Nuclear Operations j

ATTN: Manager, Nuclear Licensing l

P. O. Box 219 Crystal River, FL 32629

}

Gentlemen:

J l

SUBJECT:

CRYSTAL RIVER REQUALIFICATION EXAMINATION REPORT 302/0L-87-03 The NRC administered examinations on May 19-21, 1987, to employees of your company who hold licenses to operate the Crystal River Nuclear Plant.

At i

the conclusion of the site visit, preliminary findings on the operating I

examinations were discussed with those members of your staff identified in l

the Examination. Report, Enclosure 1.

)

The NRC also utilized the pilot requalification program in observing your training staff prepare, administer and grade written requalification

)

examinations.

l 1

An' evaluation of Crystal River's requalification program, based on the results of the facility administered written examinations and the NRC administered operating examinations is included in this report as Enclosure 2.

This evaluation found the Crystal River requalification program to be satisfactory, though some improvements in examination developnent can be made.

Details are provided in Enclosure 2.

1 In accordance with 10 CFR 2.790(a), a copy of this letter and its enclosures will be placed in NRC's Public Document Room.

Should you have any questions concerning this letter, please contact us.

i l

Sincerely, i

(ORIGINAL SIGNED BY C. A. JULIAN)

(

B706300904 e70622 PDR ADDCK 05000302-l V

PDR Caudle A. Julian, Chief Operations Branch Division of Reactor Safety l

Enclosures:

f 1.

Exam Report 50-302/0L-87-03 l

2.

Requalification Program Evaluation Report cc w/encls 1 & 2:

L. C. Kelley, Corporate Training Director P. F. McKee, Plant Manager bec w/encls:

(Seepage 2)

N' ZEVJ

a

)

q..

I 1

' Florida : Power. and Light Company

.2 June 22, 1987

~bec w/ encl-1:

Project Manager,;NRR i

State of Florida!

B. Wilson,-DRP

. bec'. w/enci-1:

...i Senior Resident. Inspector i

i Operator licensing Branch, DLP&QE:NRR f

Document Control Desk.

1 l

.RII RII RII RII pg, PRShaw:tj W

ean JFMunro CAJulian 1

6/l /87 6/ /87 6/is /87 6/p/87 A

Gl/y8

cv ENCLOSURE 1 EXAMINATION REPORT 302/0L-87-03 Facility Licensee:

Florida Power Corporation P. O. Box 219 Crystal River, FL 32629 Facility Name:

Crystal River Nuclear Plant

-Facility Docket No.:

50-302 Facility' authorized written examinations were administered at Crystal River Training Center near Crystal River, Florida.

NRC Oral examinations were J

administered at Crystal iv Unit 3 ne r Cr al River, Florida.

E

~ Chief. Examiner:

)

WiTI1al M. Dean Date Signed

. Approved by:

John F. Munro, Section-Chief Date Signed Summary:

Examinations on May 18-21, 1987.

Oral examinations were administered to four operators and four senior operators all of whom passed.

The facility administered written examinations to four R0s and six SR0s, all of whom passed with'the exception of one R0.

Based on the results described above, three of four R0's passed and six of six V

SR0's passed.

]

)

l u

.a-A i

e REPORT DETAILS 1..

Facility Employees Contacted:

'A

  • Larry Kelley, Training Manager Johnnie Smith, Operations Training Supervisor
  • Paul Fleming, Requalification Training Lead Instructor
  • Ron!Long, Requalification. Training Instructor
  • Attended Exit Meeting 2.

Examiners:

  • W.' M. Dean-L. L. Lawyer

'C. A. Casto

  • Chief Examiner 3.

Exit Meeting At the conclusion of the site visit the examiners met with representatives of the plant staff to discuss the results'of the examination.

There were some generic weaknesses noted during the oral examinations.

The: areas of. below normal performance were knowledge of radiation detection theory and use of. inplant computers for boron calculations.

The ' cooperation given to the examiners and the effort to ensure an atnosphere 'in' the control room conducive to oral examinations was also noted and appreciated.

-The licensee did not. identify as proprietary.any of the material provided to or reviewed.by the examiners.

g.g pu --

ENCLOSURE 2 REQUALIFICATION PROGRAM EVALUATION REPORT Facility: Crystal River Nuclear Plant Examiner: W. M. Dean, L. L. Lawyer, C. A. Casty Dates of Evaluation: May 18-21, 1987 Areas Evaluated: X Written X Oral N/A Simulator Examination Results:

R0 SR0 Total Evaluation Pass / Fail Pass / Fail Pass / Fail (S, M or U)

Written Examination

  • 3/1 6/0 9/1 S

Operating Examination Oral 4/0 4/0 8/0 S

Simulator N/A N/A N/A N/A Evaluation of facility written examination grading S

  • Facility administered written examination under the aegis of the NRC's Pilot Requalification Program.

Overall Program Evaluation Satisfactory.

Weaknesses noted in the development and administration of the written examination by the facility were lack of " depth of understanding" questions (particularly theory and procedures) for SR0s, and too limited a scope /anount of questions to rationalize giving a six hour written examination.