Forwards Insp Rept 50-424/87-35 on 870518-22 & Notice of Violation
ML20216F203
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 06/23/1987
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: James O'Reilly
GEORGIA POWER CO.
Shared Package
ML20216F207 List:
References
NUDOCS 8706300825
Download: ML20216F203 (3)


See also: IR 05000424/1987035

Text

1

;

.lt

'

g

,

-

!

-.

1

JUN 2 31987:

'

'

u

.

t

i

. . . . .

.

.

j

Docket No. 50-424

)

-

LLicense No.=NPF-68

,

,

,1

Gejrgia Power Company
(.ATIN: Mr. idames .P. '0'Reilly

Senior Vice'. President-.

Nuclear Operations

P. 0.' Box'4545

-

Atlanta, GA i30302'

Gentlemen:

,

.'SUBJECTi

NOTICE OF VIOLATION

-t'

'(NRC INSPECTION REPORT N0. 50-424/87-35).

.

,This' refers to the Nuclear Regulatory Commission'(NRC) inspection condu'cted by

' R. E. Weddington .on May 18-22, 1987..- The: inspection included a review of

activities authorized fcr . your Vogtle Electric Generating -- Plant-Unit :1

i

-

facility. . At;the- conclusion of the inspection, the findings were discussed:

,

with those' members'of your. staff: identified. in. the enclosed inspection . report.

'

.

Areas examined during th'e inspection are identified in the~ report.

. ithin

W

these areas. the: inspection consisted of selective examinations ofl procedures-

and representative' records, . interviews with personnel, and observation of.

activities. in progress.

The ' inspection' findingsj indicate that certain activities appeared to' violate -

,

. NRC . requi rements.

The' violations, references to pertinent . requirements, and

elements to be included in-your response are described in' the enclosed Notice

of Violation.-

In accordance with Section 2.790 of the ..NRC's " Rules of Practice," Part 2,

' Title 10, Code of Federal Regulations, .a copy of this letter and its enclosures

.will be'placed in the'NRC Public Document Room.

!

Theiresponses directed by this letter and its enclosures are not subject to the -

'

clearance procedures of the' Office, of Management and Budget as required by the

Paperwork Reduction Act of.1980 PL 96-511.-

!

1

g6300825870623

G

ADOCM 05000424;

'

PDR

!

lIl

'i

I

.CEbb ;

.I

L

' Georgia Power Company

2

Should you have any questions concerning this letter, please contact us.

Sincerely,

.

J. Philip Stohr, Director

Division of Radiation Safety

and Safeguards

Enclosures:

1.

Notice of Violation

2.

Inspection Report

cc w/encls:

LR/E. Conway, Senior Vice President &

Project Director

"Cf' Whitney, General Manager Project

Support

LB/D. Rice, Vice President, Project

Engineering

L M H. Pinson, Vice President, Project

Construction

[AssuranceManager

W. Hayes, Vogtle Quality

9 . B. Bockhold, General Manager,

G

Nuclear Operations

(~1,.' Gucwa, Manager, Nuclear Safety

and Licensing

J/A. Bailey, Project Licensing

V

Manager

ty:'W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

t J: E. Joiner, Troutman, Sanders,

JockermanandAshmore

W. G. Ledbetter, Conmissioner,

Department of Human Resources

LI< H. Badger, Office of Planning

and Budget

tp/Kirkland, Ill, Counsel,

Office of the Consumer's Utility

Council

LD:' Feig, Georgians Against

j

Nuclear Energy

J'. B. Margulies, Esq. , Chairman,

Atomic Safety and Licensing Board

Panel

)

cc w/encls:

(Continuedpage3)

l

1

]

a

3..

,

l

3 '.

'j

.

{

cc w/encls:l

. .

. ..

. O. H. Paris, Administrative Judge

.j

- @ Atomic Safety and Licensing' Board.

1

fanel:

g. . A. Linenberger, Jr. , Administrative Judge

.

-Atomic Safety and Licensing Board--

Panel

'bec w/encis:

(f/Reis ,' OGC

-

-

J! M. Hil1, IE

LMr Miller, NRR

IX. Brach, ED0

M. Sinkule, RII

. E. Christnot, RII-

L MC Resident Inspector-

Document Control Desk

State of Georgia

W, Rankin, DRSS

,

l

RII

RII

g

RWeddington-

Hosey

ollins

Sinkule

c,gga maa

  • 5/o/87-

AQ/87

/ g/87

//p/87

4

l