coninion,s can i am.n < "nmany 14N ' put Pla c n,aien o.se,a w i w oi August 25,1997 U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
Subject:
11raldwood Station Units I and 2 Ilyron Station Units I and 2 Dresden Station Units 1,2, and 3 LaSalle County Station Units I and 2 Quad Cities Station Units I and 2 Zion Station Units I and 2 Commonwealth Edison Clarification of Activation of Single Emergency Operations Facility (TAC Nos. h191309, h191310, h191311, h191312, M91313, M91314 M91315, h191316, M91317, h191318, M91319, M91320)
O\\
NBCSockets 50-454_and 50-455 MRC_Dackds 50-456 and 50-457 I
NROJackets 5010. 50-237 and 50-249 NRC Dockets 50 373 and 50-374 l
g MRCRackets 50-254 and 50-2M NRCEnckets 50-295 and 50-304
Reference:
1)
Comed Letter to Document Control Desk dated Febmary 27, 1997 regarding " Response to Request for Additional Information regarding the Central Emergency Operations Facility" 2)
USNRC Letter to Comed dated February 8,1996 regarding "Use of the Corporate Emergency Operations Facility as an Interim Emergency Operations Facility" i
This purpose of this letter is to provide clarification concerning the intent of Comed's commitment regardit.g staffmg of the proposed Central EOF. As stated in Reference (1), Comed intent to staff the central EOF at ALERT with staffconsistent with the 13 member Interim EOF staff as currently approved by the NRC. Comed further 97o9090146 970825 DR ADOCK 0500 0
{gg
}, }
A rniwns conmanc
9 Document Control Desk (2)
August 25,1997 commits to staff the facility within the 60 minute goal stated in NUREG-0654. The clock measuring the success of any activation will begin upon the classification of an ALERT at any ofour nuclear fccilities.
Comed appreciates the opportunity to clarify our submittal. Please contact Ms. Irene M. Johnson at (630) 663 2096 if you have any questions pertaining to this response or any other questions pertaining to the proposal.
Sincerely, e
[ohn C. Brons Nuclear Support Vice President cc:
A.B. Beach, Regional Administrator, USNRC Region 111 R. Capra, Director of Directorate III 2, NRR G. Dick, Comed Generic Issues Administrator, NRR Senior Resident inspector (Braidwood)
Senior Resident inspector (Byron)
Senior Resident inspector (Dresden)
Senior Resident inspector (LaSalle)
Senior Resident inspector (Quad Cities)
Senior Resident inspector (Zion)
R. Wight, Office of Facility Safety, IDNS h w rdoc
=
=