Forwards Insp Rept 50-341/98-03 on 971221-980316 & Notice of Violation.One Violation of NRC Requirements Occurred & Being Cited in NOV Due to Review of safety-related Procedure Not Being Conducted & Resulted in Shedding of Several Loads
ML20216C818
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/11/1998
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20216C821 List:
References
RTR-NUREG-1600 50-341-98-03, 50-341-98-3, NUDOCS 9805190417
Download: ML20216C818 (4)


See also: IR 05000341/1998003

Text

N R2%'o

UNITED STATES

-

NUCLEAR REGULATORY COMMISSION

g

8

o

REGION lli

1

5

y

801 WARRENVILLE ROAD

)

"

t

LISLE. ILLINOIS 60532-4351

"

May 11, 1998

Mr. D. R. Gipson

Senior Vice President

'

Nuclear Generation

The Detroit Edison Company

6400 North Dixie Highway

Newport, MI 48166

SUBJECT:

NRC INSPECTION REPORT 50-341/98003(DRP), NOTICE OF VIOLATION, AND

NOTICE OF DEVIATION

_

f

Dear Mr. Gipson:

On March 16,1998, the NRC completed an inspection at your Fermi 2 reactor facility. The

enclosed report presents the results of that inspection.

During the nine-week period covered by this inspection, configuration control problems in your

j

345kV switchyard contributed to a series of spurious breaker trips, a main turbine trip, and an

i

automatic reactor scram Control room operators and plant equipment responded well to the

event. Investigations and corrective actions following the event were broad and comprehensive.

The subsequent forced outage was well-executed, including a number of emergent maintenance

activities such as the replacement of the B Residual Heat Removal Pump Motor.

Based on the results of this inspection, the NRC has detemnined that one violation of NRC

requirements occurred. This violation is cited in the enclosed Notice of Violation (Notice) and the

circumstances surrounding it are described in detailin the subject inspection report. The

violation was of concem because a thorough review of a safety-related procedure was not -

conducted before use, which resulted in the shedding of several loads.

l

l

Also based on the results of this inspection, the NRC has determined that two deviations from a

commitment occurred involving the failure to implement the specific regulatory positions

contained in Regulatory Guide 1.78, " Assumptions for Evaluating the Habitability of a Nuclear

Power Plant Control Room During a Postulated Chemical Release." The first commitment was

not met due to the failure to provide periodic training to operators to distinguish the smells of

hazardous chemicals. In addition, drills to ensure prompt donning of breathing apparatus were

not performed. The second commitment concemed respirators stored in the control room. The

number of respirators stored should exceed the number of operators in the control room.

However, only five respirators for five operators were contained in the control room.

f

\\

9905190417 980511

h

PDR

ADOCK 05000341

\\/

G

PDR

._

u

.

.

D. Gipson

-2-

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-341

License No.: NPF-43

1

Enclosures:

1.

Notice of Violation

2.

Notice of Deviation

3.

Inspection Report

No. 50-341/98003(DRP)

cc w/encls:

N. Peterson, Director

Nuclear Licensing

P. A. Marquardt, Corporate

Legal Department

Richard Whale, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Monroe County, Emergency

Management Division

Emergency Management

Division, Mi Department

of State Police

!

<

I

i

!

I

l

!

-

.

l

\\

l

D. Gipson

-2-

l

You are required to respond to this letter and should follow the instructions specified in the

l

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with regulatory

requirements.

l

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No.: 50-341

i

License No.: NPF-43

)

l

Enclosures:

1.

Notice of Violation

2.

Notice of Deviation

3.

Inspection Report

No. 50-341/98003(DRP)

cc w/encis:

N. Peterson, Director

Nuclear Licensing

P. A. Marquardt, Corporate

Legal Department

Richard Whale, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Monroe County, Emergency

Management Division

Emergency Management

Division, Ml Department

of State Police

1

!

To receive a copy of this document, indicate in the box "C" = Copy without attach /enci "E" = Copy

l

with attach / enc! "N" = No copy

!

,,

OFFICE

Rill n h

Rlld/

Rlli

,,

h

ESchhithz:co

BBkess

GGran

NAME

k/[98

d /h98

g////98

DATE

OFFICIAL RECORD COPY

l

._ ._

.

.

D. Gipson

-3-

Distribution:

CAC (E-Mail)

Project Mgr., NRR w/encls

A. Beach w/encls

J. Caldwell w/encls

B. Clayton w/encls

SRI Fermi w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rlli PRR w/encls

PUBLIC IE-01 w/encls