Text
G06)
--
.
..
._
()CT 311986
Docket Nos. 50-348, 50-364
Alabam
ower Company
ATTN:V Mr. R. P. Mcdonald
Senior Vice President
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
SUBJECT: NOTICE OF DEVIATION
(NRC INSPECTION REPORT NOS. 50-348/86-18AND50-364/86-18)
This refers to the Nuclear Regulatory Coninission .(NRC) inspection conducted by
M. Thomas on August 25-28, 1986.
The inspection included a review of activities
authorized for your Farley facility.
At the conclusion of the inspection, the
findings were discussed with those members of your staff identified in the
enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative . records, interviews with personnel, and observation of activities
in progress.
The inspection revealed no violation of NRC requirements.
However, certain
activities having safety significance appeared to deviate from commitments to
the NRC.
The deviation and elements to be included in your response are
described in the enclosed Notice of Deviation.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
David M. Verre111, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosures:
(See page 2)
,
8611030325 861031
DR
ADOCK 0500
8
- - _ _ _ _ - _ _ _ _ _
-
_ _ _ _
-
,
.
.
3lE
Alabama Power Company
2
Enclosures:
1.
Notice of Deviation
2.
NRC Inspection Report
c w/encls:
Wj 0. Whitt, Executive Vice President
W. D. Woodard, General Manager -
/ Nuclear Plant
J W. G. Hairston, III, General Manager -
/ Nuclear Support
_
VJ. W. McGowan, Manager-Safety Audit
'
f and Engineering Review
VJ. K. Osterholtz, Supervisor-Safety
Audit and Engineering Raview
cc w/encls:
RC Resident Inspector
. Reeves, Project Manager, NRR
Document Control Desk
State of Alabama