Forwards Safety Insp Repts 50-277/86-16 & 50-278/86-17 on 860816-0926.No Notice of Violation Re Inadequate Procedures for DHR & Shutdown Cooling Issued Since Violation Corrected by Util
ML20215M645
Person / Time
Site: Peach Bottom  
Issue date: 10/24/1986
From: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20215M646 List:
References
NUDOCS 8611030123
Download: ML20215M645 (2)


See also: IR 05000277/1986016

Text

-

.

4 OCT 1986

.

Docket Nos. 50-277/DPR-44

50-278/DPR-56

Philadelphia Electric Company

ATTN: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvar.ia 19101

Gentlemen:

Subject: Combined Inspection 50-277/86-16; 50-278/86-17

This transmits the findings of the routine safety inspection by Messrs.

J. H. Williams and T. P. Johnson on August 16 - September 26, 1986, at the

Peach Bottom Atomic Power Station, Delta, Pennsylvania. These findings were

based on observation of activities, interviews, measurements and document

reviews, and have been discussed with Mr. R. S. Fleischmann and Mr. G. M.

Leitch of your staff.

A copy of this letter and the enclosures are being placed in the NRC Public

Document Room.

Within the scope of this inspection, one violation was noted as a result of

inadequate planning and procedures for decay heat removal and shutdown cooling.

However, since this violation was identified, reported and corrected by your

staff, no Notice of Violation is being issued and no reply to this letter is

required. Your cooperation with us is appreciated.

Sincerely,

(W S1 aed Bys

8

Robert M. Gallo, Chief,

Projects Branch 2, Division

of Reactor Projects

Enclosure:

NRC Region I Combined Inspection Report No. 50-277/16 and 50-278/17

8611030123 861024

PDR

ADOCK 05000277

G

PDR

l

OFFICIAL RECORD COPY

CIR PB 86-16/17 - 0001.0.0

10/24/86

Ol

.

. .

-

E.

1

.

24 0CT 1986

Philadelphia Electric Company

2

cc w/ encl:

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station

John S. Kemper, Vice President, Engineering and Research

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic

Electric

G. Leitch, Superintendent, Nuclear Generation Division

Troy B. Conner, Jr. , Esquire (Without Report)

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire (Without Report)

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bec w/encls:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encis)

R. Gallo, Section Chief, DRP

SRI, Limerick I

'

W

/gcb

h

o

10/D /86

10/0/86

10/29/86

10/J 86

0FFICIAL RECORD COPY

CIR PB 86-16/17 - 0002.0.0

10/22/86

-

-

.-

. - . - - - -

._- --.

-

. .

.

..