Forwards Safeguards Insp Repts 50-277/86-17 & 50-278/86-18 on 860825-28.No Violation Noted
ML20215K333
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/21/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20215K336 List:
References
NUDOCS 8610280128
Download: ML20215K333 (2)


See also: IR 05000277/1986017

Text

I

.

.

.

'

i

hymd Es5siii.

Ceilidd h

/.<i

NM

DCT 2126

//

Docket Nos.

50-277

-License Nos. OPR-44

50-278

DPR-56

Philadelphia Electric Company

ATTN:

Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection Nos. 50-277/86-17 and 50-278/86-18

This refers to the routine safeguards inspection conducted by Mr. R. J. Bailey

of this office on August 25-28, 1986 at the Peach Bottom Atomic Power Station,

Delta, Pennsylvania of activities authorized by NRC License Nos. DPR-44 and

DPR-56 and to the discussions of our findings held by Mr. Bailey with

-Mr. D. Smith of your staff at the conclusion of the inspection and to a

subsequent telephone discussion between Mr. S. Tharpe and Mr. Bailey on

September 3, 1986.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

A section of the enclosed inspection report contains details of your security

program that have been determined to be exempt from public disclosure in

accordance with 10 CFR 73.21 (Safeguards Information). Therefore, the section

so identified in the inspection report will not be placed in the NRC Public

i

Document Room and will receive limited distribution. This letter and the

remaining portions of the inspection report will be placed in the Public

Document Room, in accordance with 10 CFR 2.790(a).

No reply to this letter is required. Your cooperation with us is appreciated.

Sincerely, ,4riginalsignedBra

e61028012e 861021

PDR

ADOCK 0500

7

'

G

Thomas T. Martin, Director

Division of Radiation Safety

and Safeguards

0FFICIAL RECORD COPY

CIR SG PB 86-17/18 - 0001.0.0

10/01/86

I

L

'

%

.

-

,.

Philadelphia Electric Company

2

~

OCT 211886

,

Enclosures: Combined NRC Region I Inspection Numbers 50-277/86-17 and

50-278/86-18 (Safeguards Information (SGI) is contained in

paragraph 7)

cc w/ enc 1 (w/o SGI):

R. S. Fleischmann, Manager, Peach Bottom Atomic Power Station (w/SGI)

John S. Kemper, Vice President, Engineering and Research

Troy B. Conner, Jr. , Esquire

W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric

G. Leitch, Superintendent Nuclear Generation Division

Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report)

Raymond L. Hovis, Esquire .

Thomas Magette, Power Plant Siting, Nuclear Evaluations (Without Report)

W. M. Alden, Engineer in Charge, Licensing Section

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector (w/SGI)

Commonwealth of Pennsylvania

,

bec w/enci (w/o SGI):

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

,

Section Chief, DRP

Robert J. Bores, DRSS

!

'

Y

RI

RI- .SS

SS

R-

S

!

.

B iley

Ke

Boyner

Ma tin

,

10/.y/86

10/8'/86

10/M/86

1/ ./86

i

i

0FFICIAL RECORD COPY

CIR SG PB 86-17/18 - 0002.0.0

10/01/86

,