Text
~
up , ,
v
q
JUN 10 W
.
a
.:
. Docket Nos. 50-259,z50-260, and 50-296
License: Nos. DPR-33, DPR-52, and DPR-68
1
fTgnnessee Valley Authority
(ATTN: Mr. S. ' A. ' White
Manager,of Nuclear Power-
.
6N 38A Lookout Place-
1
~
1101 Market Street
j
Chattanooga, TN 37402-2801
j
i
Gentlemen:
j
SUBJECT:
(NRC INSPECTION REPORT-NOS. 50-259/87-14, 50-260/87-14',
j
AND 50-296/87-14)
y
This refers toithe. Nuclear Regulatory Commission (NRC) inspection conducted by
l
G. L. Paulk .on March 1
. April 30,1987. The inspection included 'a review of
l
activities authorized for your Browns Ferry-facility. At the conclusion of.the
"
inspection, .the findings were discussed. with . those members' of .your staff -
R
identified'in-the enclosed inspection report.
1
Areas examined during the inspection included operational safety, maintenance
obshnation,
surveillance
testing
cbservation,
reportable ' occurrences,
configuration management, Restart Review Board and the Independent Safety.
L
Engineering Group '(ISEG) activity, welding modifications, the lay up program,
and low' pressure turbine disc cracking,
Within these : areas, the inspection consisted. of selective examinations of
I
procedures and representative- records,
interviews with personnel,. and
observation of activities in progress.
.
!
The inspection findings indicate certain activities appeared to violate NRC
requirements.
The violation involved an : inoperable Control Room Emergency
Ventilation'(CREV) System.
The violation, references to pertinent require-
ments, and elements to be included in your response are described in the
!
enclosed Notice of Violation (NOV). For the first example of the enclosed NOV,
!
I
please ' address your reasons and corrective actions regarding the timeliness
a'spect of identifying . the actual low flow condition on the B train CREV
system.
Your attention .is. called to paragraph 7, Surveillance Testing observation,
where the Browns Ferry (BFN) quality assurance staff recently performed a
technical review of the BFN Surveillance Instructions (SI). The intent was to
i
.' review ten percent of the 430 sis but was temporarily halted after about five
percent because it was concluded that the existing technical adequacy review
program was inadequate. A condition adverse to quality report was written and
the SI program was halted.
More management involvement in the implementation
of this p_rogram will be required to assure satisfactory completion of the
. program.
8706250275 070615
ADOCK 05000259
G
PDR;
\\g
m
\\\\
3201
'
Fo
> . ,
,
.
'
JTennessee Valley Authority
2
JUN 151987
Engineering Group (ISEG)' staffing level at BFN.
As described in the BFN
Nuclear Performance _. Plan,: Volume 3, dated August 28, _1986, ..the BFN ISEG would
consist of three full-time engineers onsite.
NUREG 0737, Item I.B.1.2 speci-
fies that the ISEG should be comprised of a minimum of five dedicated, full-
time engineers.
However, a number less than five may be acceptable, but must
be_ justified'on a case-by-case basis. Our concern.is that based on our current
knowledge _of :the qualifications you intend to use in filling. the BFN ISEG
.
positions, the experience level 'does not appear to justify going to fewer
l
4
than five members. Since the ISEG staffing issue was also. raised in our_ review
of the BFN' Nuclear Performance Plan, you should ensure that your revision to
)
Volume 3' addresses this question.
l
-
.
-
I
'
- In accordance with'. Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and.its' enclosures
j
will be placed in the NRC Public Document Room.
-
The responses directed by this. letter and the_ enclosures are not subject to the
clearance procedures of.the Office of Management and Budget issued under the
i
Paperwork Reduction Act of_1980, PL 96-511.
l
l
-Should you have any questions concerning this letter, please contact us.
H
Sincerely,
ORIGINAL SIGNED BY
!
GARY G. ZECH
j
Gary G. Zech, Assistant Director,
!
Inspection Programs
!
Division of TVA Projects
!
Office of Special Projects.
I
Enclosures:
1.
Notice'of Violation
i
2.
NRC Inspection Report
cp w/encls:
(Af. P. Pomrehn, Site Director
Browns Ferry Nuclear Plant
(f. L. Gridley, Director
Nuclear Safety and. Licensing
d A. Kirkebo, Acting Director,
Nuclear Engineering
, M J. May, Site Licensing Manager
bec w/encis:
(See page 3)
ff ' '
- { 7
7,[ [
~
~
-]
,
,
- '.'
'}
{
>
L' Tenne'ssie':ValleyAuthority
L3
>
gg g g 5 1987
-.
l
.
..bcc w/encls:
L
..
L"
-()( G,.Keppler, OSP
!
W D .Ebneter, OSP
l
. % A Zwolinski, OSP
o
'gid D. Liaw, OSP
f
. D.. Richardson,'OSP.-
!
- .. Gears, OSP
.F.LStang, OSP.
-
.' R. Connelly, DIA-
e,
f
- K;: P ' Barr, OSP/RII'
jc
LNRC Resident: Inspector:
- NRC Document Control Desk'
State of Alabama
<
i
!
I
.
r
-s.$,-i.
3;$N.$'U
J
I
.
"
'
e
__
RII
RII -
g
/p:
. . .
,
A
nson:cc
Algnatonis
( g g e-)
5//7/87
5/3//87
. - - . _