ML20215K257

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-259/87-14,50-260/87-14 & 50-296/87-14 on 870301-0430 Notice of Violation.Violation Involved Inoperable Control Room Emergency Ventilation Sys
ML20215K257
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 06/15/1987
From: Zech G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20215K262 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.B.1.2, TASK-TM NUDOCS 8706250275
Download: ML20215K257 (3)


See also: IR 05000259/1987014

Text

~

up , ,

v

q

.

a .: JUN 10 W

l

. Docket Nos. 50-259,z50-260, and 50-296

License: Nos. DPR-33, DPR-52, and DPR-68

1

fTgnnessee Valley Authority

(ATTN: Mr. S. ' A. ' White

. Manager,of Nuclear Power-

~

6N 38A Lookout Place- 1

1101 Market Street j

Chattanooga, TN 37402-2801 j

i

Gentlemen: j

!

SUBJECT: NOTICE OF VIOLATION 1

(NRC INSPECTION REPORT-NOS. 50-259/87-14, 50-260/87-14', j

AND 50-296/87-14) y

This refers toithe. Nuclear Regulatory Commission (NRC) inspection conducted by l

G. L. Paulk .on March 1 . April 30,1987. The inspection included 'a review of l "

activities authorized for your Browns Ferry-facility. At the conclusion of.the

inspection, .the findings were discussed. with . those members' of .your staff - R

identified'in-the enclosed inspection report.

1

Areas examined during the inspection included operational safety, maintenance

obshnation, surveillance testing cbservation, reportable ' occurrences,

configuration management, Restart Review Board and the Independent Safety.

L Engineering Group '(ISEG) activity, welding modifications, the lay up program,

and low' pressure turbine disc cracking,

Within these : areas, the inspection consisted. of selective examinations of

procedures and representative- records, interviews with personnel,. and I

observation of activities in progress. .

!

The inspection findings indicate certain activities appeared to violate NRC

requirements. The violation involved an : inoperable Control Room Emergency

Ventilation'(CREV) System. The violation, references to pertinent require-

ments, and elements to be included in your response are described in the  !

enclosed Notice of Violation (NOV). For the first example of the enclosed NOV,  !

please ' address your reasons and corrective actions regarding the timeliness I

a'spect of identifying . the actual low flow condition on the B train CREV

system.

Your attention .is. called to paragraph 7, Surveillance Testing observation,

where the Browns Ferry (BFN) quality assurance staff recently performed a

technical review of the BFN Surveillance Instructions (SI). The intent was to i

.' review ten percent of the 430 sis but was temporarily halted after about five

percent because it was concluded that the existing technical adequacy review

program was inadequate. A condition adverse to quality report was written and

the SI program was halted. More management involvement in the implementation

of this p_rogram will be required to assure satisfactory completion of the

. program.

8706250275 070615

PDR ADOCK 05000259

G PDR; m

\g

\\ 3201 '

F

o > . ,

,

.

'

JTennessee Valley Authority 2

JUN 151987

Engineering Group (ISEG)' staffing level at BFN. As described in the BFN

Nuclear Performance _. Plan,: Volume 3, dated August 28, _1986, ..the BFN ISEG would

consist of three full-time engineers onsite. NUREG 0737, Item I.B.1.2 speci-

fies that the ISEG should be comprised of a minimum of five dedicated, full-

time engineers. However, a number less than five may be acceptable, but must

be_ justified'on a case-by-case basis. Our concern.is that based on our current

knowledge _of :the qualifications you intend to use in filling. the BFN ISEG .

positions, the experience level 'does not appear to justify going to fewer l

than five members. Since the ISEG staffing issue was also. raised in our_ review 4

of the BFN' Nuclear Performance Plan, you should ensure that your revision to )

Volume 3' addresses this question. l

'

- . -

I

In accordance with'. Section 2.790 of the NRC's " Rules of Practice," Part 2,  ;

Title 10, Code of Federal Regulations, a copy of this letter and.its' enclosures j

will be placed in the NRC Public Document Room.

-

The responses directed by this. letter and the_ enclosures are not subject to the  ;

clearance procedures of.the Office of Management and Budget issued under the i

Paperwork Reduction Act of_1980, PL 96-511. l

l

-Should you have any questions concerning this letter, please contact us. H

Sincerely,

ORIGINAL SIGNED BY  !

GARY G. ZECH j

Gary G. Zech, Assistant Director,  !

Inspection Programs  !

Division of TVA Projects  !

Office of Special Projects.

I

Enclosures:

1. Notice'of Violation i

2. NRC Inspection Report

cp w/encls:

(Af. P. Pomrehn, Site Director

Browns Ferry Nuclear Plant

(f. L. Gridley, Director

Nuclear Safety and. Licensing

d A. Kirkebo, Acting Director,

Nuclear Engineering

, M J. May, Site Licensing Manager

bec w/encis: (See page 3)

~

~

ff ' ' 7,[ [ ,

-]

,  ;{ 7

'.'

{

>

'}

> L' Tenne'ssie':ValleyAuthority L3

gg g g 5 1987

-. i

l

..

. ..bcc w/encls: L

L"

-()( G,.Keppler, OSP  !

W D .Ebneter, OSP l

. % A Zwolinski, OSP o

'gid D. Liaw, OSP f

. D.. Richardson,'OSP.-  !

. Gears, OSP

.

.F.LStang, OSP.

e,

-

.' R. Connelly, DIA-

f :K;: P ' Barr, OSP/RII'

jc LNRC Resident: Inspector:

NRC Document Control Desk'

< State of Alabama

i

!

I

.

r

.

J I

"

-s.$,-i. 3;$N.$'U '

e __

RII ...

,

RII -

g /p:

A nson:cc Algnatonis ( g g e-)

5//7/87 5/3//87

. - - . _