ML20215J909

From kanterella
Jump to navigation Jump to search
Forwards Security Insp Rept 50-454/86-38 on 860922-25.No Noncompliance Noted
ML20215J909
Person / Time
Site: Byron Constellation icon.png
Issue date: 10/21/1986
From: Axelson W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20215J912 List:
References
NUDOCS 8610270244
Download: ML20215J909 (2)


See also: IR 05000454/1986038

Text

N

%

i

tifMeptfetyAF0;\\

Oci 2'1 ta

Docket No. 50-454

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine unannounced security inspection conducted by

Mr. B. Drouin of this office on September 22-25, 1986, of activities at Byron

Nuclear Power Station, Unit 1, authorized by NRC Operating License No. NPF-37

and to the discussion of our findings with Mr. Querio and other members of

your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identified areas examined during

the inspection.

Within these area, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Section 73.21(c)(2) of the NRC's " Rules of

Practice," Part 73, Title 10, Code of Federal Regulations.

This information

must be handled and protected in accordance with the provisions of

10 CFR 73.21.

Consequently, our report of this inspection will not be placed

in the Public Document Room.

We will gladly discuss any nuestions you have concerning this inspection.

Sincerely,

^

8610270244 861021

'l

I

PDR

ADOCK 05000454

g

G

PDR

W. L. Axelson, Chief

[f

Nuclear Materials Safety

and Safeguards Branch

Ii;\\

Enclosure:

Inspection Report

No. 50-454/86038(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

Rill

RIII

RIII

RIII

cm

N

f

Drotfin/na

Belanger

eed

ey

A

Enclosure contains

'#N/O

s \\f0

SAFEGUARDS It!FCRMATIO:I

Upon separation this

n e r r-m i e n n n

nt

nmn!

n Tto3,

pne is Decontrolled

suo

is

v

m

n 4 avi 4

t: -.

.

s

D

$

Commonwealth Edison Company

2

OCT 2't 1986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Plant Manager

IE File

IE/DI/0RPB

IE/ES

i

NMSS/SGPL

'

NRR/PWR-8/SSPB

ACRS

cc w/ enclosure, w/o

UNCLASSIFIED SAFEGUARDS

INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

I

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel, Jr., Esq.

Diane Chavez, DAARE/ SAFE

Steve Lewis, ELD

L. 01shan, NRR LPM.

H. S. Taylor, Quality Assurance

Division

EncTosuro contains

SAFEGUARDS ItiFCR?!ATION

Upon separation this

page is Decn ~ -