ML20215J037

From kanterella
Jump to navigation Jump to search
Partial Response to FOIA Request.Forwards Documents Listed in App.Documents Also Available in PDR
ML20215J037
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 10/09/1986
From: Grimsley D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Holmes G
MHB TECHNICAL ASSOCIATES
Shared Package
ML20215J042 List:
References
FOIA-86-151 NUDOCS 8610240269
Download: ML20215J037 (2)


Text

. - - -,

wg.-o/(c UNITED STATES

[on og o

NUCLEAR REGULATORY COMMISSION

[

o W ASHINGTON, D. C.

20555 4

I

%s.,

/

OCT 9 5 86 Mr. Gr egory A.

Holmes Associate Consultant MHB Technical Associates 1723 Hami1 ton Avenue, Suite K IN RESPONSE REFER San Jose, CA 95125 TO FOIA-86-151

Dear Mr. Holmes:

This is in regard to your request, pursuant to the Freedom of Information Act, to which the NRC assigned the above number.

_X__

This is a part.i al response to your request.

We will not i f y you opon completion of sear ch f or and review of any additional records subject to your request.

The staff has completed the search f or and review of records subject to your request, and this is the -final response to your request.

The NRC has no records subject to your request.

Records subject to your request are available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, as noted on the enclosure (s).

The PDR accession number is ident.ified beside each record description.

X Records subject to your request are being made available for public inspection and copying at the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555, in the PDR file folder under the above number and your name.

These records are listed on the enclosur e (s).

We are enclosing a notice that provides information about charges and procedures for obtaining records from the PDR.

Sincerely, 1stA' M

Donnie H.

Gri msl ey, D rector Division of Rules and Records Office of Administration Enclosure (u):

As stated g q '[$

s (U

'A., ')

8610240269 861009 PDR FOIA HOLMES86-151 PDR

F0lA-86-151

. appendix D 1.

11/25/81 fiemo for F. fliraglia, Diablo Canyon Design Verification Program (3 pgs.)

2.

12/01/81 Facsimile request from B. Faulkenberry, RV_to E. Jordan and A. Dromerick transmitting NRC tasks as related to Diablo Canyon Activities (3 pgs.)

3.

12/03/81 Facsimile request to Tedesco, et al., from Faulkenberry attaching Region V definition of tasks and associated responsibility (3 pgs.)

4.

05/10/82 llemo to J. Crews, RV Inspection of Actions Related to the Diablo Canyon Reverification Program (3 pgs.)

5.

12/09/82 fiemo for D. Eisenhut, Diablo Canyon Fuel Load / Low Power SER (2 pgs.)

6.

12/16/82 flemo for D. Eisenhut, Request for Transfer of Lead Responsibility for Engineering Acceptance of Cable Tray and Conduit Support Materials Supplied by Midland-Ross, Superstrut, Oakland, CA Facility (4 pgs.)

7.

04/15/C3 liemo for H. Schierling Transcripts of V. Tennyson Interview (3 pgs.)

BA ^^ D TECHNICAL ASSOCIATES WW4 TECHMICAL CONSUL TANTS OM ENERGY & THE ENWRONMENT Dale G Brudenbaugh 1723 Hamilton Avenue-Suite K Richard B. Hubbard San Jose Cahtornoa 95125 Gregory C. Minor March 4, 1986 Phone-(408) 266 2716 Mr. Donnie H. Grimsley, Director Division of Rules and Records pqggggy Office of Administration

'# C',,i:sN U.S.

Nuclear Regulatory Commission ACI REQUEST h p - / f. /.

Washington, D.C.

20555 St/J-/M RE: FOIA REQUEST

Dear Mr. Grimsley:

Pursuant to the Freedom of Information Act, please make available at the Commission's Washington, D.C.,

Public Document Room single copies of records in the following categories:

A.

From the Chron Files of Mr. Hans Schierling from September 1, 1981, through December 31, 1983, all records concerning in any way the Diablo Canyon Nuclear Power Plant, Units 1 and/or 2.

B.

From the Reading Files of Mr. Hans Schierling from September 1, 1981, through December 31, 1983, all records concerning in any way the Diablo Canyon Nuclear Power Plant, Units 1 and/or 2.

Please provide partial responses as batches of documents become available.

If you have any questions concerning this request, please contact me at the telephone number given above. Your prompt attention to this request will be appreciated.

Very Truly Yours, re o Holmes Associate Consultant he Q1 6M 9

-