ML20215H289
| ML20215H289 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 10/10/1986 |
| From: | Walker R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20215H291 | List: |
| References | |
| NUDOCS 8610230074 | |
| Download: ML20215H289 (2) | |
Text
rp 00T 101986 rolina Power and Light Company TTN: Mr. E. E. Utley Senior Executive Vice President Power Supply and Engineering and Construction P. O. Box 1551 Raleigh,.NC 27602 Gentlemen:
SUBJECT:
MEETING
SUMMARY
- HARRIS NUCLEAR PLANT - DOCKET NO. 50-400 This letter refers to the meeting conducted at your request in the Region II Office on September 25, 1986. The meeting related to Shearon Harris operational readiness, and the status of preoperational testing and construction. Enclosed is a summary of the meeting topics.
It is our opinion that this meeting was beneficial, and provided for a better understanding of the progress of Shearon Harris toward nuclear operation.
In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the NRC's Public Document Room.
Should you have any questions concerning this matter, we will be pleased to discuss them.
Sincerely, Original Signed by Luis.A. Reyes /for Roger D. Walker, Director Division of Reactor Projects
Enclosures:
1.
Meeting Summary 2.
Attendance List c w/encls:
A. Watson, Vice President vR Harris Nuclear Project
. L. Tibbitts, Director of Regulatory
/ Compliance VJ. L. Willis, Plant General Manager bec w/encis:
(See page 2) 8610230074 e61010 PDR ADOCK 0500 0
A l
Carolina Power and Light Company 2
00T 101996
~
Acc w/encis:
g. Barth, OGC
. Moore, OGC RC Resident Inspector Document Control Desk State of North Carolina L
I i
f RII RII 9
PFr ridkson:1b DVerrelli 10/[d /86 10/10/86
-