Rev 0 to 0PCP08-AP-0006, Backup Determination of Boron - Post-Accident
ML20215F383
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 09/22/1986
From: Underwood J
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20215F286 List:
References
RTR-NUREG-0737, RTR-NUREG-737 0PCP08-AP-0006, PCP8-AP-6, NUDOCS 8610160182
Download: ML20215F383 (3)


Text

HOUSTON LIGHTING AND POWER COMPANY

/N SOUTH TEXAS PROJECT Mk WDRMATl0N ONL

' ELECTRIC GENERATING STATION PMNT PROCEDURES MANUAL DIVISION PROCEDURE NON SAFETY-RELATED (Q)

Backup Determination of OPCP08-AP-0006 Boron-Post Accident Rev. O Page 1 of 3 APPROVED: T e a l r M, w 9 fl2 l 9(.4 9 /Z'i/ f?C, C0&A MANAGER DATE APPROVED DATE EFFECTIVE 1.0. Discussion

1.1 Purpose and Scope

1.1.1 The purpose of this procedure is to identify a method of performing a backup analysis for boron concentration following a design base accident on the RCS, RHR, or RCB Sump.

1.1.2 This procedure meets the requirements of NUREG 0737 item II.B.3 (Post-Accident Sampling Capabilities) to provide a backup method for any in line monitoring.

1.2 Definitions None 1.3 Principle l

1.3.1 In the event of a design bcse accident it will be necessary I

to verify the boron concentration in the RCS, RHR, or RCB sump to ensure that the nroper shutdown margin has been attained.

In the event that the in line boron analyzer fails on the PASS, diluted grab sample can be taken at the Liquid and Gas Sample Panel (LGSP) in a shielded syringe. The j

sample can then be analyzed for boron in either the PASS laboratory or taken to the Radiochetaistry laboratory for analysis. This method utilizes an auto-titrimeter with the potentiometric method.

bG 8610160182 861009 PDR ADCCK 05000498 E

PDR e

a

Backup Determination-of OPCP08-AP-0006 p

Boron-Post Accident Rev. 0 Q

Page 2 of 3 1.4 Limitations 1.4.1 This procedure is capable of measuring boron in the range of 0-6000 ppa using a 1:100 or 1:1000 dilution.

2.0 Prerequisites 2.1 The auto-titrimeter standardized in,accordance with Section 6.0 of OPCP02-ZB-0037 (Determination of Boron-Potentiometric Method Using i

the Auto-titrator).

3.0 Precautions 3.1 Sample collection, preparation and analysis shall be performed under applicable Radiation Work Permits.

3.2 All personnel working within the PASS facility shall be responsible for ensuring that radiation exposure associated with implementing this procedure is kept as low as reasonably achievable (ALARA).

3.3 Personnel transferring radioactive material shall use measures t

I necessary to prevent the spread of contamination during packaging and transporting in accordance with applicable procedure (s).

D 4.0 Procedure 4.1 Collect either. a RCS, RCB Sump, or RRR san.ple in accordance with IPCP08-AP-0003 (Sampling and Analysis of RCS, RHR, and RCB Sump-Post Accident). Note the dilution used.

4.2 If necessary transport the sample to the Radiochemistry laboratory for analysis'in accordance with OPRP03-ZM-0014 (Movement of Material Out of Radiologically Controlled Area).

4.3 Perform the boron analysis in accordance with OPCP02-ZB-0037' (Determination of Boron-Potentiometric Method Using the Auto-titrator).

4.4 If the samle was diluted in step 4.1 calculate the actual boron concentration in accordance with Section 5.0.

4.5 Record the results on Form IPCP08-AP-0001-2 Core Damage Assessment Data Sheet Backup Analyses.

lO c

w-

,p w-r-

a-

-w-~m aw,---.-,

, -, - ~

Backup Determination of OPCP08-AP-0006 j'^x Boron-Post Accident Rev. 0

()

Page 3 of 3 5.0 Calculations 5.1 Sample corrected boron concentration ppm boron = A x D A = boron concentration determined in step 4.2.1 D = Dilution factor - for 100 to 1 dilution = 100

= for 1000 to 1 dilution = 1000 6.0 Standardization None 7.0 Documentation 7.1 Forms are dispositioned in accordance with OPCP01-ZA-0011 (Chemical Laboratory Logsheets and Reports).-

8.0 References 8.1 OPCP02-ZB-0037 (Determination of ' Boron-Potentiometric Method Using

()

the Auto-titrator), Rev. O.

8.2 1PCP08-AP-0003 (Sampling and Analysis of the RCS, RHR, and RCB Sump-Post Accident), Rev. O.

8.3 1PCP08-AP-0001 (Core Damage Assessment - Post Accident), Rev. O.

8.4 NUREG 0737, " Clarification of TMI Action Plan Requirements,"

November 1980.

l O

..-