ML20215F382

From kanterella
Jump to navigation Jump to search
Forwards Partially Withheld Insp Repts 50-321/86-37 & 50-366/86-37 on 861117-20 & Notice of Violation.Notice & Insp Details Withheld (Ref 10CFR2.790 & 73.21)
ML20215F382
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/17/1986
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20215F385 List:
References
NUDOCS 8612230374
Download: ML20215F382 (2)


See also: IR 05000321/1986037

Text

SAFEGUARDS INFORMATION

. -

.

DEC 171986

Docket Nos. 50-321, 50-366

License Nos. DPR-57, NPF-5

Georgia Power Company

ATTN: Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION REPORT NOS. 50-321/86-37 AND 50-366/86-37)

This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by

A. Tillman on November 17-20, 1986.

The inspection included a review of

activities authorized for your Hatch facility.

At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities appeared to violate NRC

requirements. The violations, references to pertinent requirements, and elements

to be included in your response are described in the enclosed Notice of

Violation.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will ng be placed in the NRC Public Document Room.

The responses directed by this letter and its enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

8612230374 861217

PDR

ADOCK 05000321

4

Q

PDR

Virgil L. Brownlee, Chief

Reactor Projects Branch 3

Division of Reactor Projects agg

SAFECUARDS INFORMATION -

Enclosures:

(See page 2)

UPON SEPARATION THIS

5' AGE ISSECONTRIU **~

AFEGUARDS INFORMATION

p

- pdc

i i

t

'

t

r

SAFEGUARDS INFORMATION

'

e

DEC 171986

Georgia Power Company

2

. Enclosures:

1.

Notice of Violation

(Safeguards Information)

2.

NRC Inspection Report

(Safeguards Information)

cc w/encls:

J. P. O'Reilly, Senior Vice President

Nuclear Operations

J. T. Beckham, Vice President, Plant Hatch

H. C. Nix, Site Operations General

Manager

A. Fraser, Acting Site QA Supervisor

L. Gucwa, Manager, Nuclear Safety

and Licensing

bec w/encls:

IE File

NMSS/SGPL

NRR/DL/SSPB

bec w/ Inspection Summary:

Document Control Desk, 016

NRC Resident Inspector

State of Georgia

.

i

l

!

!

I

I

RI

RIDp,

RII g ]

RIIqf

H)

,

cff

"

'

'

y

a-

.

,

T1Liman:lb

i c ' t re

n

JStohy

Algnatonis

V .o alk

L

es

T12/g /86

1/j/86

12//

86 12/[g86

12/g/86

1/

6

1/ /86

/

4

ENCLOSURE CONTAINS

SAFEGUARDS INFORMATIOL .S^rsma** 2*ro=rzw

0Nso

110Nrais

PAGE IS DECONTROLLED.

!

,