ML20215F377

From kanterella
Jump to navigation Jump to search
Forwards Summary of 860910 Meeting W/Util in Atlanta,Ga to Discuss SALP Quarterly Followup.Meeting Provided Better Understanding of Util Actions to Improve SALP Ratings.List of Attendees Also Encl
ML20215F377
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/03/1986
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Wilgus W
FLORIDA POWER CORP.
References
NUDOCS 8610160178
Download: ML20215F377 (3)


Text

..

[

OCT 3W Docket No. 50-302 License No. DPR-72 floridaPowerCorporation

/ ATTN: Mr. W. S. Wilgus Vice President Nuclear Operations P. O. Box 14042, M.A.C. C-2-M St. Petersburg, FL 33733 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- CRYSTAL RIVER 3, DOCKET NO. 50-302 This refers to the management meeting conducted at our request in the NRC Region II Office on September 10, 1986, to discuss the Crystal River 3 SALP Quarterly Follow-up. A summary of the meeting topics is provided in Enclosure 1.

A list of attendees at the meeting is shown in Enclosure 2.

It is our opinion that this meeting was beneficial in that it provided us a better understanding of your actions to improve your SALP ratings.

In accordance with Section 2.790 of NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Sincerely, Original Signed by Luis A. Reyes /for Roger D. Walker, Director l

Division of Reactor Projects l

l

Enclosures:

1.

Meeting Summary I

2.

Meeting Attendees

):cw/encis:

V P. F. McKee, Director, Nuclear Plant

/ Operations vR. C. Widell, Manager, Nuclear Operations Licensing and Fuel Management 9610160178 861003 PDR ADOCK 05000302 fccw/encls:

PDR NRC Resident Inspector P

Document Control Desk State of Florida RI RII RII i RII,

I

/h p Y

HChristensen:1b SElrod Dyerre111

[ eyes

/ t/86

/ 2./86 (W y/86

$P/.2 /86

}

,7 OCT 3 1986 ENCLOSURE 1 Meeting Summary Licensee

Florida Power Corporation Facility: Crystal River License: DPR-72 On September 10, 1986, members of the NRC Region II staff and representatives of Florida Power Corporation (FPC) met to discuss Crystal River 3 SALP Quarterly Follow-up. The following topics were described and discussed in detail:

1.

FPC's Opening Remark 2.

NRC's Opening Remarks 3.

Plant Status and Performance 4.

Radiological Controls 5.

Security and Safeguards 6.

Quality Programs and Administrative Controls 7.

Training 8.

General Discussions 9.

Closing Remarks The meeting was informative in that it permitted a good exchange of information concerning progress made by the licensee to improve their SALP ratings.

l

-.... - - ~.. -...,. - - -... -. -

,/.

OCT 31986 ENCLOSURE 2 Meeting Attendees Florida Power Corporation W. S. Wilgus, Vice President, Nuclear Operations P. F. McKee, Director, Plant Operations G. Westaffer, Director, Quality Programs R. C. Widell, Manager, Nuclear Operation Licensing and Fuel Management J. Alberdi, Manager, Nuclear Site Support B. J. Hickle, Manager, Nuclear Plant Operations L. C. Kelley, Manager, Nuclear Operations Training U. S. Nuclear Regulatory Commission R. D. Walker, Director, Division of Reactor Projects (DRP)

A. F. Gibson, Director, Division of Reactor Safety (DRS)

J. P. Stohr, Director, Division of Radiation Safety and Safeguards (DRSS)

D. M. Verrelli, Chief, Reactor Projects Branch 2, DRP D. M. Collins, Chief, Emergency Preparedness and Radiological Protection Branch, DRSS S. A. Elrod, Chief, Reactor Projects Section 2C (RPS2C), DRP E. J. McAlpine, Chief, Nuclear Materials Accountability Section, DRSS l

C. Perny, Physical Security Inspector, DRSS J. E. Tedrow, Resident Inspector, Crystal River, DRP H. O. Christer.sen, Project Engineer, RPS2C, DRP l

9