ML20215F188
| ML20215F188 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 06/15/1987 |
| From: | Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Kemper J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20215F191 | List: |
| References | |
| NUDOCS 8706220275 | |
| Download: ML20215F188 (2) | |
See also: IR 05000353/1987006
Text
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ .
l
,
.
i
!
JUN 151987
\\
l
l
'
Docket No.
50-353
Philadelphia Electric Company
ATTN: Mr. John S. Kemper
Senior Vice President
Engineering snd Production
2301 Market Street
Philadelphia, PA 19101
Gentlemen:
Subject:
Inspection No. 50-353/87-06
l
1
This refers to the routine safety inspection conducted by C. H. Woodard of this
i
office on May 4-14, 1987, of activities authorized by NRC License No. CPPR-107
(
and to the discussions of our findings held by C. H. Woodard with J. Corcoran
'
of your staff at tho conclusion of the inspection, and to subsequent telephone
discussions between J. Corcoron and C. Woodard on May 20 and May 28, 1987.
l
1
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with your commitments, as set forth in the
Notice of Deviation, enclosed herewith as Appendix A.
It appears that PECO has not fulfilled an October 22, 1981 letter commitment
to NRC to correct the class 1E undervoltage levels by June 1986.
You are
requested to respond to this deviation following the instructions provided in
'
l
Appendix A.
Information contained within the enclosed inspection report has been discussed
with Mr. J. Corcoran of your staff.
During this discussion, it was concluded
that the inspection report contained no information that you considered
proprietary; therefore a copy of this letter and its enclosures are being
placed in the NRC's Public Document Room.
8706220275 h h 53
ADOCK
(f)[
o
g
_
-
--
- - - - - _ - - - _ - - - - - - - - - - - - - - - - - - - - - - -
_
4
Philadelphia Electric Company
2
i
.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
Your cooperation with us in this matter is appreciated.
J
Sincerely,
Oriaix21 signed By:
..
Jacque P., Durr
N
William V. Johnston, Acting Director--
Division of Reactor Safety
Enclosure:
1.
Appendix A, Notice of Deviation
2.
NRC Region I Inspection Report Number
50-353/87-06
cc w/ encl:
S. J. Kowalski, Vice President, Engineering and Research
W. T. Ullrich, Superintendent, Limerick 2 Project
'
J. M. Corcoran, Quality Assurance Manager
i
Troy B. Conner, Jr. , Esquire
i
Eugene J. Bradley, Esquire, Assistant General Counsel
!
Public Document Room (PDR)
l
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Pennsylvania
bcc w/ enc 1:
Region I Docket Room (with concurrences)
Management Assistant, DRMA (w/o encl)
Section Chief, DRP.
I
Robert' J. Bores, DRSS
!
G
RI:DRSS
RI: RSS
RI:DRSS
woodard/mk
Anderson
Durr
87
(/ /87
g/ /87
b
c,hlo
44
's7
Q
1
I
..
.
j