DUKE POWER COMPANY P.O. BOX 33180 IIAL H. TUCKER
-....,,,n.
' U ** * *
- woca a4 m, mono <vrion June 15, 1987 U. S.. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.
20555 Re:
Catawba Nuclear Station Docket No. 50-413 and 50-414
Dear Sir:
Please find attached information concerning the performance and operating status of the Catawba Nuclear Station for the month of May, 1987. Also attached are corrected copies of the Unit Shutdowns and Power Reductions for Unit 1 for the month of March, 1987, and for Unit 2 for the month of April, 1987.
Very truly yours,
(
ex Af, c,/
Hal B. Tucker JAR /23/sbn Attachment xc:
Dr. J. Nelson Grace, Regional Administrator INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 Region II 1100 circle 75 Parkway 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Atlanta, Georgia 30323 Mr. Richard G. Oehl, NE-44 Mr. Phil Ross U. S. Department of Energy U. S. Nuclear Regulatory Commission 19901 Germantown Road MNBB-5715 Germantown, Maryland 20874 Washington, D. C.
20555 American Nuclear Insurers Dr. K. Jabbour, Project Manager c/o Dottie Sherman, ANI Library Office of Nuclear Reactor Regulation The Exchange, Suite 245 U. S. Nuclear Regulatory Commission 270 Farmington Avenue Washington, D. C.
20555 Farmington, CT 06032
-Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station 8706220013 870615 U
PDR R
ADOCK 05000413 PDR ill l
OFERAilh6 DATA PEPORT DOCKET 50-413 OPERATINd Si9IUS DATE 5-15-97 COMPLETED BY
- 1. Unit Nase: CATEBA 1
.T. A. Reavis
- 2. Reporting Period:
- 3. Licensed Thereal Power (MWt):MAY 1,1987-MAY 31,1987 TELEPHONE 704/373-7567
- 4. Naseplate Rating (Gross MWe):
3411
- 5. Design Electrical Rating (Net MWe):
1305
- 6. Maxinus Dependable Capacity f6ross MWe):
!!45 i
Notes *Naseplate Rating
- 7. Marious Dependable Capacity (Net MWelt l
1 I
(6ross MWe) calculated as 1
- 8. If Changes Occur in Capacity Ratings (!tess Number 3 Th 1145
-l 1450.000 MVA x.90 power I 1
Report. Give Reasons I
rough 7) Since Last factorperPagelii, i
i NUREG-0020.
I
...............................................................,._.._.._._..,............l._,,_,_,,,_,_____,,,_,1
- 9. Power Level to Which kastricted, if Any (Net MWel...................
- 10. Reason For Restrictions, if any:
j i
l
\\
This Month Yr.-to-Date Cuaulative
!! Hours in Reporting Period i
i
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdoun Hours 744.0 3,623.0
- 14. Hours Generator On-Lice 690.2 3,212.3 16,848.0
- 15. Unit Reserve Shutdown Hours
--0--
12,249.7
--0--
- 16. Gross Thersal Energy Generated (MWH)
--0--
680.5 3,147.1
- 17. Bross Electrical Energy Generated (MWH)
--0--
11,817.8
--0--
IB. Net Electrical Energy Sererated (MWH) 2,209,750 10,249,654 36,921,876
~0--
! 19. Unit Service Factor 769,744 3,601,644 12,562,376
!20.UnitAvailabilityFactor 725,017 3,389,627 12,012,633
' 21. Unit Capacity Factor (Using MDC Net) 91.5 86.9
- 22. Unit Capacity Factor (Using DER Net) 91.5 70.1 66.9
- 23. Unit Forced Outage Rate 85.1 70.1 61.7
- 26. Shutdoans Scheduled Over West.6 Months (Type, Date and D 85.1 62.3 81.7 None 0.0 62.3 uration of Each):
!!.6 17.8 J.....................................
- 26. Units in Test Status (Prior to Consercial Operation)25. If Shut D o
artups........._..........._ __.......... _
Forecast................
Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~.#'
- - ~ ~
_ __