Text
_.
.--
,
.
i.
,s.
.
DEC L51936
m
~In. Reply Refer To:
>
Docket:
50-298/86+31-
Nebraska Public Power District'
.
.
ATTN: JJ. M.'Pilant, Manager, Technical'
Staff - Nuclear Power Group
P. 0. Box 499
Columbus, Nebraska
68601'
-G;ntlemen:
'
This refers to the inspection conducted by Messrs. W. R. Bennett and M. E. Skow
of this office during the period November 17-21, 1986, of activities authorized
-by NRC Operating License DPR-46 for Cooper Nuclear Station, and to the
discussion of our findings with Mr. G. R. Horn and othar members of your staff
-at the conclusion of the-inspection.
Areas examined during the inspection included quality assurance annual review,
audit program, audit implementation, and procurement. Within these areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the NRC inspectors.
The inspection findings ~are documented in the enclosed inspection report.
L
Within the scope of the inspection, no violations or deviations were
identified.
,
,We have also examined actions you have taken with regard to previously
. identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
i
discuss them with you.
~
Sincerely,
j'
Origm! Kmcd By
'
J. E. G::s!!ardo
J. E. Gagliardo, Chief
,
Reactor Projects Branch
'
Enclosure:
Appendix - NRC Inspection Report
'
S0-298/86-31
I
/
,
,
[
--cc w/ enclosure:
(see next page)
,
C:R ED
C:RPB #[
'
RIV:RPB/AAt(
RP8/Ak
JPJAu/A
don
JEGagli Edo
/{,
WRBennett/tw
MESkow
IA/J/86
/t/ }/86
{1/$ /86
r1/d/
J
\\
8612170034 e61205
ADOCK 05000298
G
.
..
..
-_
__ _ ____ _ _________ - _ _- -_-_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ - _ _
'
.
_
...
Nebraska Public Power District
-2-
cc w/ enclosure:
Guy Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
P. O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Controi Program Director
bec distrib. by RIV:
- RPB
DRSP
- RRI
R. D. Martin, RA
- Section Chief (RPB/A)
- D. Weiss, LFMB (AR-2015)
- R&SPB
- RSB
- MIS System
- Project Inspector
- RIV File
- W. R. Bennett
- RSTS Operator
- M.
E. Skow
- w/766