- v. -
, /* p a 's,
[NRC' MONTHLY OPERATING REPORT DOCKET NO.
50-529 I
UNIT NAME PU5G52 '
2 0575I---Hull
_786 DATE COMPLETED BY.
.J.L.
TELEPHONE
_6 0 2 _ _9 3 2 - 5 3 0 0 Ext. 6593 i
i c
OPERATING' STATUS
~~~~~~~~~
g
- 1.
' Unit Name: 'Palo_ Verde _ Nuclear _ Generating _Stationt_ Unit _2 2.
Reporting 1 Period:EJuly_1986 ^
3.
Licensed Thermal Power.(MWt): 3399-4.
Nameplate Rating (Gross MWe): 1493
.5.
Design Electrical Rating (Net MWe):
1221
'6.
Maximum Dependable' Capacity (Gross MWe):'To_bg_dgtgrmingd 7.
Maximum-Dependable Capacity (Net MWe):
Io_bg_dstgreiggd 8.
If Changes Occur In Capacity Ratings (Items Number 13 Through-7)
Since Last Report, Give Reasons:
9.
Power Level to Which Restricted. If Any (Net MWe): _NONE_________
l 10.
Reasons For Restrictions, If Any:
- = -
This Month Yr.-to-Date Cumulative r
L 11.
Hours in Reporting Period
__Z34_____
__2595.25__.
_3153 25__
2 i
12.
Number of Hours Reactor Was Critical
__1Z1.g___
__1135.s___
_1135.s___
13. - Reactor Reserve Shutdown Hourn
_____0____
_0_
__Q____.
14.
Hours Generator On-Line
__11Z.6___
___794_____
__794 ____
15.
Unit Reserve Shutdown Hours
---__O O-_---
O 16.
Gross Thermal Energy Generated (MWH)
_179 O55__
l 106 a97__.
I 1Q6 397_
t t
t t
t
. Groan Electrical Energy l
17.
i l
Generated-(MWH)
_ _59 t900__
_296 SOO___
_296 SQQ__
t t
L.
Net Electrical Energy 8
l Generated (MWH)
__26 475__
_2Q4 271__
_204 271___
t t
t l
19. - Unit Service Factor
____NLA___
____NLA____
____NLA___
l 20.
Unit Availability Factor
____NLA___
N/A____
____NfA___
L
-21.
Unit Capacity Factor (Using HDC Net)
____NLA___
____NLA____
____NfA___
.22.
Unit ~ Capacity Factor (Using DER Net)
____NLA___
____NLA____
____N/A___
l 23.
Unit Forced Outage Rate
____NLA___
____NfA___,
____NfA___
~
24.
Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of.Each): No_significant_ outage _ planned _until_after_ warranty _run_
.25.
If Shutdown At End of Report Period, Estimated Date of Startup:
N/A 26.
Units in Test Status (Prior To Commercial Operation):
,v Forecast Achieved i
INITIAL CRITICALITY
__3/93__
_4f13/03_
t INITIAL ELECTRICITY
---_20/86
- - - _/ 8_6--
6 -
5/
[,
COMMERCIAL OPERATION
_11gg6__
L 8610140267 860731
'I y gggg i
PDR ADOCK 05000529 l
R PDR
\\((
n.
t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
~~_P_V__5_5_25~~~~~~~~
50-529 UNIT ___=
D A T E _ _ _ _ _ _ _ _ 0_ 8_ _/ 1 1 _/ 8_ 6_ _ _ _ _ _ _ _
COMPLETED BY J.L.__Hull T E L E P H O N E _ _ _ 6_ 6_ 5_ 2 5_ 5_ 5_ ~ 5_ 5
_ _ _ E_ x_ t_. _ 6_ 5_ 9 3 -
MO__N_TH:
July 1986 DAY AVERAGE DAILY POWER LEVEL-DAY AVERAGE DAILY POWER LEVEL 1
_ _ _ _ _ - _ _ _ _1 _9 _7 17 __________-. O 2 __-
_ _ _ _ _ _0 18 ______________O____________
3
____________0______________
19 ______________O____________
4
____________0______________
20 ___________
O-___________
=
0 5
____________0______________
21 ______________0____________
6 0______________
22 _____________16____________
7
__=
=_____0______________
23 ___________3_2_1____________
8
____________0______________
24 ____________5_6_9____________
9
___-________O____-_________
25 _____________1_2____________
LO ____________O______________
26 __-__________O____________
LL ________-___O______________
27 ____________4_9_4____________
L2 __-__-______0______________
28 ____________2_0_9____________
13 __-__
-___0______________
29 ______________O____________
14 _____-_____0______________
30 ______________0____________
15 _-__________0______________
31 _____________0____________
16 _-___ ______O______________
m REFUELING INFORMATION DOCKET NO.
50-Q22_______
UNIT PVNGS-2______
DATE Op/11/pp_____
COMPLETED BY J.L._ Hull ____.
TELEPHONE 302-932-5300_
Egt _@523____
3 i.
Scheduled date for next refueling shutdown.
01/02/88 2.
Scheduled date for restart following refueling.
02/20/88 3.
Will refueling or resumption or operation thereafter require a Technical Specification change or other license amendment?
Not Yet Determined What will these be?
Not Yet Determined
- 4.
Scheduled date for submitting proposed licensing action and supporting information.
Not Yet Determined 5.
Important Licensing considerations associated with refueling, l
e.g.
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.-
Not Yet Determined 6.
The number of fuel assemblies.
a)
In the core.
____241____
b)
In the spent fuel storage pool.
______O 7.
Licensed spent fuel storage capacity.
___1329___
Intended change in spent fuel storage capacity.
___None___
8.
Pro 3ected date of laat refueling that can be discharged to spent fuel storage pool assuming present capacity.
2003 (w/ annual reloads and full core discharge capability).
SUMMARY
OF OPERATING EXPERIENCE FOR THE' MONTH DOCKET NO.
50-529_______
UNIT PVNGS-2______
DATE 99/11/p5_____
COMPLETED BY J.L._ Hull ____
TELEPHONE 99_2-932--5399_
3 Egt._g593____
07/01
'0700 Plant Reactor Power 30*
Mode 1 07/01 2150 Commenced taking Unit off line per Tech. Spec.
LCO 3.4.5.2 07/02 2226 Tripped Main Turbine 07/02 1748 Commenced RCS cooldown to Mode 5 for RCP seal work 07/02 2304 Reactor in Mode 3 07/02 2253 Reactor in Mode 4 07/03 0556 Reactor in Mode 5 07/16 2342 Reactor in Mode 4 07/18 0554 Reactor in Mode 3 07/20 1057 Reset Main Turbine 07/21 1657 Reactor Critical 07/22 0543 Reactor Power >5% Mode 1 07/22 1442 Sync. Main Generator 07/22 1805 Reactor Power 19x 07/23 0518 Reactor Power 30%
07/25 0217 Reactor Trips on a CPC generated Hi LPD trip Unit in Mode 3 07/26 0339 Reactor Critical Mode 2 07/26 1630 Entered Mode 1 07/26 2233 Sync. Main Generator 07/27 0415 Reactor Power 50%
07/28 1009 Tripped Main Turbine due to loss of vaccum in condenser caused by extensive tube leak 07/28 1017 Reactor in Mode 2 07/28 '2240 Reactor shutdown, entered Mode 3 07/31 2320 Reactor in Mode 3
-r*~...
' UNIT SHUTDOWNS AND POWER ACDUCTIONS DOCKET NO.,
Mn-97R
'[
UNIT NAHC ~ PWif W-2
~t bN 1
- C0HrLETE TELEPal0NC ~ 4U-S ma rve Aso3 Hethod or l
Shutting i
Down System Component Cause ar Corrective 1
Duration 2
- 3 I.ER 4
5 Action to No.
Dste Type (llou rs )
Reason Rosctor No.
Code Code
- Prevent Recurrence
+
11 07/01/86 F
0 D
N/A N/A AB SEAL Commenced a Unit s'hutdown due to unidentified leakage being high.
S'hutdowrr' required'by Tech, Spec, LCO Problem' corrected by replacing RCP Seuls*
C
, CPU Reacto,r trip on CPC i;enerated Hi 12 07/25/86 F
25.4 A
3 2-86-047 LPD tr.ip 13 07/28/86 F
0 A
N/A N/A SG COND Main turbine trip unable to main-tain vaccum in condenser I
I
. t 1
2 3
is F-rorced Reason:
Method:
Exhibit F - Instructions S-Schocoled A-Eauipment re f luro (Explain) 1-Manual for ernparation or Data n-ttaintenance or Test 2-Hanual Scram.
Entry slicets for Licensoe C-Itc ruc i log J.Automa t ic scram.
Event Report (LER) rise D-Regulatory Restrlction Is-Continuation from-(NOREC 0161) t-opera tor Training & I.f conse Examination ernvious Month r-Admini s t ra t ivo 5-Reduction or 207, 5
C-oporational Error (Explain) or creator in the Exhibit H-Same Source if-other (Explain) rns t 2's flours 9-other (Exposin) i.
c
?,'
Arizona Nuclear Power Project P.O. BOX 52034
- PHOENIX, ARIZONA 85072-2034 August 18, 1986 ANPP-37787-JGH/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Unit 2 Docket No. STN 50-529 (License NPF-51)
July Monthly Operating Report File: 86-024-404
Dear Mr. Scroggins:
Attached please find the July, 1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specific.ations) to the Palo Verde Nuclear Generating Station, Unit 2 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.
If you have any questions, please contact me.
Very truly yours, W
J. G. Haynes Vice President Nuclear Production JGil/PGN/rw Attachment cc:
- 0. M. De Michele (all w/a)
E. E. Van Brunt, Jr.
J. B. Martin R. P. Zimmerman E. A. Licitra A. C. Gehr INPO Records Center 7
9
$