[NRC' MONTHLY OPERATING REPORT DOCKET NO.

50-529 I

UNIT NAME PU5G52 '

2 0575I---Hull


_786 DATE COMPLETED BY.

.J.L.

TELEPHONE

_6 0 2 _ _9 3 2 - 5 3 0 0 Ext. 6593 i

i c

OPERATING' STATUS

~~~~~~~~~

g

1.

' Unit Name: 'Palo_ Verde _ Nuclear _ Generating _Stationt_ Unit _2 2.

Reporting 1 Period:EJuly_1986 ^

3.

Licensed Thermal Power.(MWt): 3399-4.

Nameplate Rating (Gross MWe): 1493

.5.

Design Electrical Rating (Net MWe):

1221

'6.

Maximum Dependable' Capacity (Gross MWe):'To_bg_dgtgrmingd 7.

Maximum-Dependable Capacity (Net MWe):

Io_bg_dstgreiggd 8.

If Changes Occur In Capacity Ratings (Items Number 13 Through-7)

Since Last Report, Give Reasons:

9.

Power Level to Which Restricted. If Any (Net MWe): _NONE_________

l 10.

Reasons For Restrictions, If Any:

- = -

This Month Yr.-to-Date Cumulative r

L 11.

Hours in Reporting Period

__Z34_____

__2595.25__.

_3153 25__

2 i

12.

Number of Hours Reactor Was Critical

__1Z1.g___

__1135.s___

_1135.s___

13. - Reactor Reserve Shutdown Hourn

_____0____

_0_

__Q____.

14.

Hours Generator On-Line

__11Z.6___

___794_____

__794 ____

15.

Unit Reserve Shutdown Hours

---__O O-_---

O 16.

Gross Thermal Energy Generated (MWH)

_179 O55__

l 106 a97__.

I 1Q6 397_

t t

t t

t

. Groan Electrical Energy l

17.

i l

Generated-(MWH)

_ _59 t900__

_296 SOO___

_296 SQQ__

t t

L.

Net Electrical Energy 8

l Generated (MWH)

__26 475__

_2Q4 271__

_204 271___

t t

t l

19. - Unit Service Factor

____NLA___

____NLA____

____NLA___

l 20.

Unit Availability Factor

____NLA___

N/A____

____NfA___

L

-21.

Unit Capacity Factor (Using HDC Net)

____NLA___

____NLA____

____NfA___

.22.

Unit ~ Capacity Factor (Using DER Net)

____NLA___

____NLA____

____N/A___

l 23.

Unit Forced Outage Rate

____NLA___

____NfA___,

____NfA___

~

24.

Shutdowns Scheduled Over Next 6 Months (Type, Date. and Duration of.Each): No_significant_ outage _ planned _until_after_ warranty _run_

.25.

If Shutdown At End of Report Period, Estimated Date of Startup:

N/A 26.

Units in Test Status (Prior To Commercial Operation):

,v Forecast Achieved i

INITIAL CRITICALITY

__3/93__

_4f13/03_

t INITIAL ELECTRICITY

---_20/86

- - - _/ 8_6--

6 -

5/

[,

COMMERCIAL OPERATION

_11gg6__

L 8610140267 860731

'I y gggg i

PDR ADOCK 05000529 l

R PDR

\\((

n.

t AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

~~_P_V__5_5_25~~~~~~~~

50-529 UNIT ___=

D A T E _ _ _ _ _ _ _ _ 0_ 8_ _/ 1 1 _/ 8_ 6_ _ _ _ _ _ _ _

COMPLETED BY J.L.__Hull T E L E P H O N E _ _ _ 6_ 6_ 5_ 2 5_ 5_ 5_ ~ 5_ 5

_ _ _ E_ x_ t_. _ 6_ 5_ 9 3 -

MO__N_TH:

July 1986 DAY AVERAGE DAILY POWER LEVEL-DAY AVERAGE DAILY POWER LEVEL 1

_ _ _ _ _ - _ _ _ _1 _9 _7 17 __________-. O 2 __-

_ _ _ _ _ _0 18 ______________O____________

3

____________0______________

19 ______________O____________

4

____________0______________

20 ___________

O-___________

=

0 5

____________0______________

21 ______________0____________

6 0______________

22 _____________16____________

7

__=

=_____0______________

23 ___________3_2_1____________

8

____________0______________

24 ____________5_6_9____________

9

___-________O____-_________

25 _____________1_2____________

LO ____________O______________

26 __-__________O____________

LL ________-___O______________

27 ____________4_9_4____________

L2 __-__-______0______________

28 ____________2_0_9____________

13 __-__

-___0______________

29 ______________O____________

14 _____-_____0______________

30 ______________0____________

15 _-__________0______________

31 _____________0____________

16 _-___ ______O______________

m REFUELING INFORMATION DOCKET NO.

50-Q22_______

UNIT PVNGS-2______

DATE Op/11/pp_____

COMPLETED BY J.L._ Hull ____.

TELEPHONE 302-932-5300_

Egt _@523____

3 i.

Scheduled date for next refueling shutdown.

01/02/88 2.

Scheduled date for restart following refueling.

02/20/88 3.

Will refueling or resumption or operation thereafter require a Technical Specification change or other license amendment?

Not Yet Determined What will these be?

Not Yet Determined

- 4.

Scheduled date for submitting proposed licensing action and supporting information.

Not Yet Determined 5.

Important Licensing considerations associated with refueling, l

e.g.

new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.-

Not Yet Determined 6.

The number of fuel assemblies.

a)

In the core.

____241____

b)

In the spent fuel storage pool.

______O 7.

Licensed spent fuel storage capacity.

___1329___

Intended change in spent fuel storage capacity.

___None___

8.

Pro 3ected date of laat refueling that can be discharged to spent fuel storage pool assuming present capacity.

2003 (w/ annual reloads and full core discharge capability).

SUMMARY

OF OPERATING EXPERIENCE FOR THE' MONTH DOCKET NO.

50-529_______

UNIT PVNGS-2______

DATE 99/11/p5_____

COMPLETED BY J.L._ Hull ____

TELEPHONE 99_2-932--5399_

3 Egt._g593____

07/01

'0700 Plant Reactor Power 30*

Mode 1 07/01 2150 Commenced taking Unit off line per Tech. Spec.

LCO 3.4.5.2 07/02 2226 Tripped Main Turbine 07/02 1748 Commenced RCS cooldown to Mode 5 for RCP seal work 07/02 2304 Reactor in Mode 3 07/02 2253 Reactor in Mode 4 07/03 0556 Reactor in Mode 5 07/16 2342 Reactor in Mode 4 07/18 0554 Reactor in Mode 3 07/20 1057 Reset Main Turbine 07/21 1657 Reactor Critical 07/22 0543 Reactor Power >5% Mode 1 07/22 1442 Sync. Main Generator 07/22 1805 Reactor Power 19x 07/23 0518 Reactor Power 30%

07/25 0217 Reactor Trips on a CPC generated Hi LPD trip Unit in Mode 3 07/26 0339 Reactor Critical Mode 2 07/26 1630 Entered Mode 1 07/26 2233 Sync. Main Generator 07/27 0415 Reactor Power 50%

07/28 1009 Tripped Main Turbine due to loss of vaccum in condenser caused by extensive tube leak 07/28 1017 Reactor in Mode 2 07/28 '2240 Reactor shutdown, entered Mode 3 07/31 2320 Reactor in Mode 3

-r*~...

' UNIT SHUTDOWNS AND POWER ACDUCTIONS DOCKET NO.,

Mn-97R

'[

UNIT NAHC ~ PWif W-2

~t bN 1

  • C0HrLETE TELEPal0NC ~ 4U-S ma rve Aso3 Hethod or l

Shutting i

Down System Component Cause ar Corrective 1

Duration 2

  • 3 I.ER 4

5 Action to No.

Dste Type (llou rs )

Reason Rosctor No.

Code Code

  • Prevent Recurrence

+

11 07/01/86 F

0 D

N/A N/A AB SEAL Commenced a Unit s'hutdown due to unidentified leakage being high.

S'hutdowrr' required'by Tech, Spec, LCO Problem' corrected by replacing RCP Seuls*

C

, CPU Reacto,r trip on CPC i;enerated Hi 12 07/25/86 F

25.4 A

3 2-86-047 LPD tr.ip 13 07/28/86 F

0 A

N/A N/A SG COND Main turbine trip unable to main-tain vaccum in condenser I

I

. t 1

2 3

is F-rorced Reason:

Method:

Exhibit F - Instructions S-Schocoled A-Eauipment re f luro (Explain) 1-Manual for ernparation or Data n-ttaintenance or Test 2-Hanual Scram.

Entry slicets for Licensoe C-Itc ruc i log J.Automa t ic scram.

Event Report (LER) rise D-Regulatory Restrlction Is-Continuation from-(NOREC 0161) t-opera tor Training & I.f conse Examination ernvious Month r-Admini s t ra t ivo 5-Reduction or 207, 5

C-oporational Error (Explain) or creator in the Exhibit H-Same Source if-other (Explain) rns t 2's flours 9-other (Exposin) i.

c

?,'

Arizona Nuclear Power Project P.O. BOX 52034

  • PHOENIX, ARIZONA 85072-2034 August 18, 1986 ANPP-37787-JGH/PGN/98.05 Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 2 Docket No. STN 50-529 (License NPF-51)

July Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the July, 1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specific.ations) to the Palo Verde Nuclear Generating Station, Unit 2 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours, W

J. G. Haynes Vice President Nuclear Production JGil/PGN/rw Attachment cc:

0. M. De Michele (all w/a)

E. E. Van Brunt, Jr.

J. B. Martin R. P. Zimmerman E. A. Licitra A. C. Gehr INPO Records Center 7

9

$